{"name": "Sudair PV IPP (also referred to as Sudair Solar PV).", "slug": "sudair-pv-ipp-also-referred-to-as-sudair-solar-pv-023da700-268", "as_of": "2026-10-17T20:17:22.806916+00:00", "depth": "basic", "facts": {"name": {"value": "Sudair PV IPP (also referred to as Sudair Solar PV).", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/sudair-pv-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "30ec88bbf65ce4b7666e45e5892aa4b08b3e68fcd6284a407be876edc75c9d83", "observed_at": "2026-10-17T20:08:49.758154+00:00", "revision_id": "15a1ce2e-e592-412e-a7e8-a7fa379e7857", "published_at": null}, "locator": "/html/head/main/div/section[1]/div[1]/div/div/div/div/div[1]/h3", "claim_id": "611ad632-06e0-4091-a728-4e443960fa1b", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "67056db5-fbc4-405b-8b33-d71d2c744314", "valid_until": null, "assertion_id": "45bdca19-a53c-42f6-9eba-a1d4e6cb18f2", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "Solar PV independent power project. Capacity is listed as 1,500 MW; the description says the plant is poised to become a major single-contracted solar PV plant, with installed capacity of approximately 1,500 MW. Technology is reported as bifacial panels with tracking and automated robotic cleaning. The source does not establish commissioning or operating status.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/sudair-pv-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "30ec88bbf65ce4b7666e45e5892aa4b08b3e68fcd6284a407be876edc75c9d83", "observed_at": "2026-10-17T20:08:49.758154+00:00", "revision_id": "15a1ce2e-e592-412e-a7e8-a7fa379e7857", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p[1]", "claim_id": "713c2e15-ca06-4b5b-aa99-e0657bb7bc9a", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "63b82f31-c23c-46f8-8522-67c484ca8e89", "valid_until": null, "assertion_id": "4caf158d-bae0-494f-88fd-2050b803fea9", "temporal_expression": "", "extraction_confidence": 0.9}, "sector": {"value": "Solar PV electricity generation.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/sudair-pv-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "30ec88bbf65ce4b7666e45e5892aa4b08b3e68fcd6284a407be876edc75c9d83", "observed_at": "2026-10-17T20:08:49.758154+00:00", "revision_id": "15a1ce2e-e592-412e-a7e8-a7fa379e7857", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p[1]", "claim_id": "eb148acc-f775-4579-b389-b1a47939bd22", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "63b82f31-c23c-46f8-8522-67c484ca8e89", "valid_until": null, "assertion_id": "8f787546-3757-41fc-a025-9f5cb5b37c2d", "temporal_expression": "", "extraction_confidence": 0.9}, "country": {"value": "Saudi Arabia (KSA).", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/sudair-pv-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "30ec88bbf65ce4b7666e45e5892aa4b08b3e68fcd6284a407be876edc75c9d83", "observed_at": "2026-10-17T20:08:49.758154+00:00", "revision_id": "15a1ce2e-e592-412e-a7e8-a7fa379e7857", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p[1]", "claim_id": "61e8acc2-fbf1-40ab-b6a6-bcc522748f85", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "63b82f31-c23c-46f8-8522-67c484ca8e89", "valid_until": null, "assertion_id": "7f767704-4203-4fbd-8e9c-147c0e949a82", "temporal_expression": "", "extraction_confidence": 0.9}, "sponsor": {"value": "PIF-backed consortium led by ACWA Power.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/sudair-pv-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "30ec88bbf65ce4b7666e45e5892aa4b08b3e68fcd6284a407be876edc75c9d83", "observed_at": "2026-10-17T20:08:49.758154+00:00", "revision_id": "15a1ce2e-e592-412e-a7e8-a7fa379e7857", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p[2]", "claim_id": "f3c1b0bd-fae6-41a1-8cdb-f4c5a067c087", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "9c04c4c6-ff24-4b5b-b521-37613f91b20c", "valid_until": null, "assertion_id": "94423bf9-2f44-4a1d-8839-ed607f55a661", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Sudair Industrial City, KSA.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/sudair-pv-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "30ec88bbf65ce4b7666e45e5892aa4b08b3e68fcd6284a407be876edc75c9d83", "observed_at": "2026-10-17T20:08:49.758154+00:00", "revision_id": "15a1ce2e-e592-412e-a7e8-a7fa379e7857", "published_at": null}, "locator": "/html/head/main/div/section[4]/div/ul/li[1]", "claim_id": "becae5a9-d427-425a-ba3a-03274d825edf", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "826d8d8e-5b32-4372-bdd9-bb3adb34b207", "valid_until": null, "assertion_id": "4ad41476-a9c9-46e4-a988-820faac1c61a", "temporal_expression": "", "extraction_confidence": 0.9}, "investment": {"value": "Reported project cost: US$924 million; ACWA share: 35%.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/sudair-pv-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "30ec88bbf65ce4b7666e45e5892aa4b08b3e68fcd6284a407be876edc75c9d83", "observed_at": "2026-10-17T20:08:49.758154+00:00", "revision_id": "15a1ce2e-e592-412e-a7e8-a7fa379e7857", "published_at": null}, "locator": "/html/head/main/div/section[4]/div/ul/li[5]", "claim_id": "b18c61e1-d2d1-43dc-8d96-fd868fd4e421", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "e7e85e37-6c1b-47f4-98f1-ce172d009027", "valid_until": null, "assertion_id": "8bd13c0f-513b-4ff6-8bc5-0ee701ce293e", "temporal_expression": "", "extraction_confidence": 0.9}, "source_program": {"value": "Described as the first project under the Public Investment Fund\u2019s renewable energy programme.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/sudair-pv-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "30ec88bbf65ce4b7666e45e5892aa4b08b3e68fcd6284a407be876edc75c9d83", "observed_at": "2026-10-17T20:08:49.758154+00:00", "revision_id": "15a1ce2e-e592-412e-a7e8-a7fa379e7857", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p[1]", "claim_id": "a527fa6f-a6bc-4efe-b5cd-f563401acac6", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "63b82f31-c23c-46f8-8522-67c484ca8e89", "valid_until": null, "assertion_id": "969f9075-eaa0-426d-8e65-aaff3fbd12f0", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "02998dfc-1096-4e76-b8b5-35888575ff14", "publication": {"local_only": false, "reviewed_at": "2026-10-17T20:19:14.627914+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "ACWA Power\u2019s project page identifies Sudair PV IPP, also called Sudair Solar PV, as a solar PV project in Sudair Industrial City, Saudi Arabia. Capacity is listed as 1,500 MW; bifacial panels with tracking and automated robotic cleaning are reported. The page gives a project cost of US$924 million and an ACWA share of 35%. It describes a PIF-backed consortium led by ACWA Power and reports that the consortium signed a 25-year power purchase agreement with Saudi Power Procurement Company. This does not establish an open supplier procurement.", "schema_version": "1.0", "public_unknowns": ["The supplied source capture was observed on 2026-10-17; no publication date is provided. The page units do not establish whether the plant has been commissioned or is operating.", "No EPC award, equipment-package tender, or current supplier procurement window is stated in the supplied project-page units."], "evidence_observed_at": "2026-10-17T20:08:49.758154+00:00", "knowledge_reviewed_at": "2026-10-17T20:17:23.172649+00:00", "decisive_evidence_observed_at": "2026-10-17T20:08:49.758154+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Sudair PV IPP (also referred to as Sudair Solar PV).", "original_project_title": "Sudair PV IPP (also referred to as Sudair Solar PV).", "canonical_url": "https://capexcue.com/projects/sudair-pv-ipp-also-referred-to-as-sudair-solar-pv-023da700-268/", "release": {"id": "79861657-1e9a-4bc0-9bdc-30c7f16a308a", "number": 1, "published_at": "2026-10-17T20:20:01.221421+00:00"}, "release_reference": "release 1 (79861657-1e9a-4bc0-9bdc-30c7f16a308a)", "current_dossier_url": "https://capexcue.com/projects/sudair-pv-ipp-also-referred-to-as-sudair-solar-pv-023da700-268/", "citation": "CapexCue \u2014 Sudair PV IPP (also referred to as Sudair Solar PV). \u2014 dossier released 2026-10-17T20:20:01.221421+00:00, release 1 (79861657-1e9a-4bc0-9bdc-30c7f16a308a) \u2014 https://capexcue.com/projects/sudair-pv-ipp-also-referred-to-as-sudair-solar-pv-023da700-268/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "metadata_assessment", "value": "energy", "support": {"end": 364, "start": 0, "sources": [{"url": "https://acwapower.com/en/what-we-do/projects/sudair-pv-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "30ec88bbf65ce4b7666e45e5892aa4b08b3e68fcd6284a407be876edc75c9d83", "observed_at": "2026-10-17T20:08:49.758154+00:00", "revision_id": "15a1ce2e-e592-412e-a7e8-a7fa379e7857", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "Solar PV independent power project. Capacity is listed as 1,500 MW; the description says the plant is poised to become a major single-contracted solar PV plant, with installed capacity of approximately 1,500 MW. Technology is reported as bifacial panels with tracking and automated robotic cleaning. The source does not establish commissioning or operating status.", "statement": "Solar PV independent power project. Capacity is listed as 1,500 MW; the description says the plant is poised to become a major single-contracted solar PV plant, with installed capacity of approximately 1,500 MW. Technology is reported as bifacial panels with tracking and automated robotic cleaning. The source does not establish commissioning or operating status.", "qualifications": {"attribution": "acwapower.com"}}, "label": "Energy", "icon": "energy"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "metadata_assessment", "value": "energy", "support": {"end": 364, "start": 0, "sources": [{"url": "https://acwapower.com/en/what-we-do/projects/sudair-pv-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "30ec88bbf65ce4b7666e45e5892aa4b08b3e68fcd6284a407be876edc75c9d83", "observed_at": "2026-10-17T20:08:49.758154+00:00", "revision_id": "15a1ce2e-e592-412e-a7e8-a7fa379e7857", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "Solar PV independent power project. Capacity is listed as 1,500 MW; the description says the plant is poised to become a major single-contracted solar PV plant, with installed capacity of approximately 1,500 MW. Technology is reported as bifacial panels with tracking and automated robotic cleaning. The source does not establish commissioning or operating status.", "statement": "Solar PV independent power project. Capacity is listed as 1,500 MW; the description says the plant is poised to become a major single-contracted solar PV plant, with installed capacity of approximately 1,500 MW. Technology is reported as bifacial panels with tracking and automated robotic cleaning. The source does not establish commissioning or operating status.", "qualifications": {"attribution": "acwapower.com"}}}, "input_hash": "029e3cbbda6dcaf5661e810c0928ba7b09ad3e36cf06803b9efe85ebe11d72a6", "release_id": "79861657-1e9a-4bc0-9bdc-30c7f16a308a", "type_codes": ["solar_pv"], "field_states": {"type": {"state": "accepted", "reason": "supported_asset_with_capacity_status_qualification"}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "supported_physical_country"}, "category": {"state": "accepted", "reason": "supported_asset_with_capacity_status_qualification"}}, "region_codes": ["middle_east_north_africa"], "release_hash": "4cdd7496b8c143f2d0950bce18a4d3616389dd706a32a14854ae62448664aa91", "assessment_id": "ac8a094a-1fb8-4af3-b8f8-97c304a0a8cf", "country_codes": ["SA"], "assessment_hash": "dae07d587d1626cb685dd4659b6f3b04a765d25e9bb1e4d88582849caa77d9e7", "country_label": "Saudi Arabia", "region_label": "Middle East North Africa", "type_labels": ["Solar PV"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}