{"name": "Al Khobar 2 desalination plant.", "slug": "al-khobar-2-desalination-plant-36ea4e46-ee2", "as_of": "2026-10-17T19:37:11.032637+00:00", "depth": "basic", "facts": {"date": {"value": "The source article is dated 31 JAN 2023; it reports the construction award occurred in 2020.", "rights": "facts_only", "source": {"url": "https://www.acciona.com/updates/articles/acciona-ramps-up-worlds-largest-desalination-plant-full-production", "name": "www.acciona.com", "origin": "live", "checksum": "fa0c5753b63ff94b61eb37e0a6a32963e0ca54d11ce5e4f173f03d74b02affd4", "observed_at": "2026-10-17T19:21:25.127331+00:00", "revision_id": "814f7e4b-59c9-4806-859f-2e0f4c6d475d", "published_at": null}, "locator": "/html/body/div/div/main/div/div[1]/a-pa-path/a-pa-label/a-label[2]/text-position:11", "claim_id": "9d0b6ec6-acdd-4d45-92f8-073f1f0bfc4f", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.acciona.com", "evidence_id": "78e2551e-052d-463a-8da1-01dbc92a131b", "valid_until": null, "assertion_id": "89799ddc-6cc4-4938-a9e4-62a06f11e56e", "temporal_expression": "", "extraction_confidence": 0.9}, "name": {"value": "Al Khobar 2 desalination plant.", "rights": "facts_only", "source": {"url": "https://www.acciona.com/updates/articles/acciona-ramps-up-worlds-largest-desalination-plant-full-production", "name": "www.acciona.com", "origin": "live", "checksum": "fa0c5753b63ff94b61eb37e0a6a32963e0ca54d11ce5e4f173f03d74b02affd4", "observed_at": "2026-10-17T19:21:25.127331+00:00", "revision_id": "814f7e4b-59c9-4806-859f-2e0f4c6d475d", "published_at": null}, "locator": "/html/body/div/div/main/div/div[1]/div[1]/a-mo-wysiwyg/div/div[1]/div/ul/li", "claim_id": "4e7b1796-3308-4734-8d7e-07164d0a048b", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.acciona.com", "evidence_id": "2895ba8f-80f7-4be4-b1f0-07adab5db2fd", "valid_until": null, "assertion_id": "05c82da9-db87-4e42-9da2-45f428d35938", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "Seawater reverse-osmosis desalination (SWRO). The 2023 milestone paragraph reports ramping up production during final testing to a full capacity of 630,000 m\u00b3 of potable water per day; another paragraph says daily capacity is more than 630,000 m\u00b3 and uses future-tense equipment wording. The source's capacity and status descriptions are therefore inconsistent and do not establish a single unqualified capacity/status.", "rights": "facts_only", "source": {"url": "https://www.acciona.com/updates/articles/acciona-ramps-up-worlds-largest-desalination-plant-full-production", "name": "www.acciona.com", "origin": "live", "checksum": "fa0c5753b63ff94b61eb37e0a6a32963e0ca54d11ce5e4f173f03d74b02affd4", "observed_at": "2026-10-17T19:21:25.127331+00:00", "revision_id": "814f7e4b-59c9-4806-859f-2e0f4c6d475d", "published_at": null}, "locator": "/html/body/div/div/main/div/div[1]/div[1]/a-mo-wysiwyg/div/div[2]/p[1]", "claim_id": "62f08b85-8544-4c69-9b21-86c3c862c38c", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.acciona.com", "evidence_id": "adbfa6b6-d547-464d-8b8d-12b886bc416b", "valid_until": null, "assertion_id": "62fb6e07-e197-476b-a905-b65ae993d414", "temporal_expression": "", "extraction_confidence": 0.9}, "sector": {"value": "Water; desalination.", "rights": "facts_only", "source": {"url": "https://www.acciona.com/updates/articles/acciona-ramps-up-worlds-largest-desalination-plant-full-production", "name": "www.acciona.com", "origin": "live", "checksum": "fa0c5753b63ff94b61eb37e0a6a32963e0ca54d11ce5e4f173f03d74b02affd4", "observed_at": "2026-10-17T19:21:25.127331+00:00", "revision_id": "814f7e4b-59c9-4806-859f-2e0f4c6d475d", "published_at": null}, "locator": "/html/body/div/div/main/div/div[1]/a-pa-path/a-pa-label/a-label[1]/text-position:9", "claim_id": "98e0fb31-9ac9-440d-b4aa-98c7386c8e9c", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.acciona.com", "evidence_id": "544b528f-8b4f-4f7c-9f59-a5bc3220a7ed", "valid_until": null, "assertion_id": "c422edc7-59e9-496d-99fd-e89c8e92b914", "temporal_expression": "", "extraction_confidence": 0.9}, "country": {"value": "Saudi Arabia.", "rights": "facts_only", "source": {"url": "https://www.acciona.com/updates/articles/acciona-ramps-up-worlds-largest-desalination-plant-full-production", "name": "www.acciona.com", "origin": "live", "checksum": "fa0c5753b63ff94b61eb37e0a6a32963e0ca54d11ce5e4f173f03d74b02affd4", "observed_at": "2026-10-17T19:21:25.127331+00:00", "revision_id": "814f7e4b-59c9-4806-859f-2e0f4c6d475d", "published_at": null}, "locator": "/html/body/div/div/main/div/div[1]/div[1]/a-mo-wysiwyg/div/div[1]/div/ul/li", "claim_id": "a751266f-98e4-4a1b-a9e3-42766d682c91", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.acciona.com", "evidence_id": "2895ba8f-80f7-4be4-b1f0-07adab5db2fd", "valid_until": null, "assertion_id": "21cab537-9bc7-422c-8b01-93ec240679a5", "temporal_expression": "", "extraction_confidence": 0.9}, "delivery": {"value": "The source says the plant was already supplying the Khobar water network. It reports production ramping up to full capacity during final testing; a quoted ACCIONA director says final testing and commissioning stages were being entered.", "rights": "facts_only", "source": {"url": "https://www.acciona.com/updates/articles/acciona-ramps-up-worlds-largest-desalination-plant-full-production", "name": "www.acciona.com", "origin": "live", "checksum": "fa0c5753b63ff94b61eb37e0a6a32963e0ca54d11ce5e4f173f03d74b02affd4", "observed_at": "2026-10-17T19:21:25.127331+00:00", "revision_id": "814f7e4b-59c9-4806-859f-2e0f4c6d475d", "published_at": null}, "locator": "/html/body/div/div/main/div/div[1]/div[1]/a-mo-wysiwyg/div/div[2]/p[1]", "claim_id": "5ad3832b-c632-47bb-a2e2-29db5b0730b7", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.acciona.com", "evidence_id": "adbfa6b6-d547-464d-8b8d-12b886bc416b", "valid_until": null, "assertion_id": "6517cccb-2636-4b85-acb0-477d1c86f988", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "East of Saudi Arabia; the source says the plant supplies the Khobar water network.", "rights": "facts_only", "source": {"url": "https://www.acciona.com/updates/articles/acciona-ramps-up-worlds-largest-desalination-plant-full-production", "name": "www.acciona.com", "origin": "live", "checksum": "fa0c5753b63ff94b61eb37e0a6a32963e0ca54d11ce5e4f173f03d74b02affd4", "observed_at": "2026-10-17T19:21:25.127331+00:00", "revision_id": "814f7e4b-59c9-4806-859f-2e0f4c6d475d", "published_at": null}, "locator": "/html/body/div/div/main/div/div[1]/div[1]/a-mo-wysiwyg/div/div[2]/p[2]", "claim_id": "d14bf5dc-e7fa-44cf-af98-7f80e7e60acb", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.acciona.com", "evidence_id": "1ebf5b43-4b5a-4dbc-8a60-6483410ae722", "valid_until": null, "assertion_id": "088d4b94-a071-4e3c-9e9f-d5996e5cce86", "temporal_expression": "", "extraction_confidence": 0.9}, "contractor": {"value": "ACCIONA and its partner RTCC were awarded construction; the source also describes ACCIONA as having designed and built the plant.", "rights": "facts_only", "source": {"url": "https://www.acciona.com/updates/articles/acciona-ramps-up-worlds-largest-desalination-plant-full-production", "name": "www.acciona.com", "origin": "live", "checksum": "fa0c5753b63ff94b61eb37e0a6a32963e0ca54d11ce5e4f173f03d74b02affd4", "observed_at": "2026-10-17T19:21:25.127331+00:00", "revision_id": "814f7e4b-59c9-4806-859f-2e0f4c6d475d", "published_at": null}, "locator": "/html/body/div/div/main/div/div[1]/div[1]/a-mo-wysiwyg/div/div[1]/div/ul/li", "claim_id": "0b6de6c1-ad36-46c3-9ff8-4deaaa604872", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.acciona.com", "evidence_id": "2895ba8f-80f7-4be4-b1f0-07adab5db2fd", "valid_until": null, "assertion_id": "1f47d8d5-6ff4-4fd5-9e19-f85c73b89698", "temporal_expression": "", "extraction_confidence": 0.9}, "procurement": {"value": "SWCC awarded the construction to ACCIONA and RTCC in 2020.", "rights": "facts_only", "source": {"url": "https://www.acciona.com/updates/articles/acciona-ramps-up-worlds-largest-desalination-plant-full-production", "name": "www.acciona.com", "origin": "live", "checksum": "fa0c5753b63ff94b61eb37e0a6a32963e0ca54d11ce5e4f173f03d74b02affd4", "observed_at": "2026-10-17T19:21:25.127331+00:00", "revision_id": "814f7e4b-59c9-4806-859f-2e0f4c6d475d", "published_at": null}, "locator": "/html/body/div/div/main/div/div[1]/div[1]/a-mo-wysiwyg/div/div[2]/p[7]", "claim_id": "2dc64d17-42db-44c3-814b-b0e9f9eb86c6", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.acciona.com", "evidence_id": "86856deb-beee-4cc5-ba77-ce25523cad39", "valid_until": null, "assertion_id": "bf5e2686-8fea-4cf4-9e48-43d7a91c9594", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "06c63ba3-463e-47c9-b59b-bde2183cb374", "publication": {"local_only": false, "reviewed_at": "2026-10-17T19:38:53.842865+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "Al Khobar 2 is an SWRO desalination plant in eastern Saudi Arabia, and the article says it was already supplying the Khobar water network. The 31 JAN 2023 article reports production ramping up during final testing to 630,000 m\u00b3/day, but elsewhere gives a figure of more than 630,000 m\u00b3/day and describes equipment in future tense; its capacity and status descriptions are not consistent. The article reports that SWCC awarded construction to ACCIONA and RTCC in 2020.", "schema_version": "1.0", "public_unknowns": ["The source article dated 31 JAN 2023 does not establish the plant's completion or operating status after that date.", "The article does not identify the project owner or operator, state project cost or financing, or establish whether any procurement package is currently open."], "evidence_observed_at": "2026-10-17T19:21:25.127331+00:00", "knowledge_reviewed_at": "2026-10-17T19:37:11.388421+00:00", "decisive_evidence_observed_at": "2026-10-17T19:21:25.127331+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Al Khobar 2 desalination plant", "original_project_title": "Al Khobar 2 desalination plant.", "canonical_url": "https://capexcue.com/projects/al-khobar-2-desalination-plant-36ea4e46-ee2/", "release": {"id": "74de0812-234f-4e08-9e49-2b839ef631c6", "number": 1, "published_at": "2026-10-17T19:39:21.897937+00:00"}, "release_reference": "release 1 (74de0812-234f-4e08-9e49-2b839ef631c6)", "current_dossier_url": "https://capexcue.com/projects/al-khobar-2-desalination-plant-36ea4e46-ee2/", "citation": "CapexCue \u2014 Al Khobar 2 desalination plant \u2014 dossier released 2026-10-17T19:39:21.897937+00:00, release 1 (74de0812-234f-4e08-9e49-2b839ef631c6) \u2014 https://capexcue.com/projects/al-khobar-2-desalination-plant-36ea4e46-ee2/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "metadata_assessment", "value": "water_environment", "support": {"end": 419, "start": 0, "sources": [{"url": "https://www.acciona.com/updates/articles/acciona-ramps-up-worlds-largest-desalination-plant-full-production", "name": "www.acciona.com", "origin": "live", "checksum": "fa0c5753b63ff94b61eb37e0a6a32963e0ca54d11ce5e4f173f03d74b02affd4", "observed_at": "2026-10-17T19:21:25.127331+00:00", "revision_id": "814f7e4b-59c9-4806-859f-2e0f4c6d475d", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "Seawater reverse-osmosis desalination (SWRO). The 2023 milestone paragraph reports ramping up production during final testing to a full capacity of 630,000 m\u00b3 of potable water per day; another paragraph says daily capacity is more than 630,000 m\u00b3 and uses future-tense equipment wording. The source's capacity and status descriptions are therefore inconsistent and do not establish a single unqualified capacity/status.", "statement": "Seawater reverse-osmosis desalination (SWRO). The 2023 milestone paragraph reports ramping up production during final testing to a full capacity of 630,000 m\u00b3 of potable water per day; another paragraph says daily capacity is more than 630,000 m\u00b3 and uses future-tense equipment wording. The source's capacity and status descriptions are therefore inconsistent and do not establish a single unqualified capacity/status.", "qualifications": {"attribution": "www.acciona.com"}}, "label": "Water and environment", "icon": "water"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "metadata_assessment", "value": "water_environment", "support": {"end": 419, "start": 0, "sources": [{"url": "https://www.acciona.com/updates/articles/acciona-ramps-up-worlds-largest-desalination-plant-full-production", "name": "www.acciona.com", "origin": "live", "checksum": "fa0c5753b63ff94b61eb37e0a6a32963e0ca54d11ce5e4f173f03d74b02affd4", "observed_at": "2026-10-17T19:21:25.127331+00:00", "revision_id": "814f7e4b-59c9-4806-859f-2e0f4c6d475d", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "Seawater reverse-osmosis desalination (SWRO). The 2023 milestone paragraph reports ramping up production during final testing to a full capacity of 630,000 m\u00b3 of potable water per day; another paragraph says daily capacity is more than 630,000 m\u00b3 and uses future-tense equipment wording. The source's capacity and status descriptions are therefore inconsistent and do not establish a single unqualified capacity/status.", "statement": "Seawater reverse-osmosis desalination (SWRO). The 2023 milestone paragraph reports ramping up production during final testing to a full capacity of 630,000 m\u00b3 of potable water per day; another paragraph says daily capacity is more than 630,000 m\u00b3 and uses future-tense equipment wording. The source's capacity and status descriptions are therefore inconsistent and do not establish a single unqualified capacity/status.", "qualifications": {"attribution": "www.acciona.com"}}}, "input_hash": "4da5e4fa2298deb22accc355f6d5d4785618ff4634c1b3f160306696a2095078", "release_id": "74de0812-234f-4e08-9e49-2b839ef631c6", "type_codes": ["desalination"], "field_states": {"type": {"state": "accepted", "reason": "supported_asset_with_capacity_status_qualification"}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "supported_physical_country"}, "category": {"state": "accepted", "reason": "supported_asset_with_capacity_status_qualification"}}, "region_codes": ["middle_east_north_africa"], "release_hash": "66f3e4cd80a5c608bb95935051fb112cec2a75f832fc2f686b8e555212ed499d", "assessment_id": "260da931-48a3-4adf-ae55-fec79b91b595", "country_codes": ["SA"], "assessment_hash": "75efe5fc92a5c4fc8f63e9c23138fcd3fe243157d9ea751055142e712724d5b2", "country_label": "Saudi Arabia", "region_label": "Middle East North Africa", "type_labels": ["Desalination"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}