{"name": "Oakland TraPac electric crane phase: four new ship-to-shore cranes at TraPac\u2019s Oakland terminal.", "slug": "oakland-trapac-electric-crane-phase-four-new-ship-to-shore-cranes-at-trapacs-oakland-terminal-9d99df58-e14", "as_of": "2026-10-18T22:33:57.284377+00:00", "depth": "basic", "facts": {"date": {"value": "The page is dated July 30, 2026, and the article text carries a July 28, 2026 dateline. Crane sections arrived in January 2026; a time-lapse documents construction from April\u2013June 2026; commissioning of the first two cranes was celebrated on July 7.", "rights": "facts_only", "source": {"url": "https://www.portofoakland.com/port-of-oakland-and-trapac-celebrate-new-electric-cranes", "name": "www.portofoakland.com", "origin": "live", "checksum": "72763dbfa683cb603a6e350db2eaed794f5a4f0543147dcf907fe50c2084bc19", "observed_at": "2026-10-18T21:58:06.097601+00:00", "revision_id": "2c457f72-459f-4b5a-b5a7-acaa5dde2d6c", "published_at": null}, "locator": "/html/body/div[2]/div/div[2]/div/div[1]/div[1]/div/div[3]/div/ul/li", "claim_id": "5cf37998-54f2-4d6e-957b-a81301dede61", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.portofoakland.com", "evidence_id": "74a8ceb8-1565-49c9-ad04-4c1d91453710", "valid_until": null, "assertion_id": "94b23ef9-fc0c-44e7-87cc-cdeb8c189d87", "temporal_expression": "", "extraction_confidence": 0.9}, "name": {"value": "Oakland TraPac electric crane phase: four new ship-to-shore cranes at TraPac\u2019s Oakland terminal.", "rights": "facts_only", "source": {"url": "https://www.portofoakland.com/port-of-oakland-and-trapac-celebrate-new-electric-cranes", "name": "www.portofoakland.com", "origin": "live", "checksum": "72763dbfa683cb603a6e350db2eaed794f5a4f0543147dcf907fe50c2084bc19", "observed_at": "2026-10-18T21:58:06.097601+00:00", "revision_id": "2c457f72-459f-4b5a-b5a7-acaa5dde2d6c", "published_at": null}, "locator": "/html/body/div[2]/div/div[2]/div/div[1]/div[1]/div/div[1]/div/h1", "claim_id": "a271c6b2-ac9b-4355-9874-0b4c3a8b1a3e", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.portofoakland.com", "evidence_id": "caa12eec-e763-4e52-9fdf-5f184fc3dc65", "valid_until": null, "assertion_id": "6a1ac97b-6bab-4679-abdf-44b0416a3b46", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "Four new 100%-electric Liebherr ship-to-shore cranes, manufactured in Ireland; each is reported as 440+ feet tall, designed to reach 24 container rows and work stacks up to 11 containers high. Two were reported in service/fully operational; the other two were under construction or assembly and expected to be operational in Fall 2026.", "rights": "facts_only", "source": {"url": "https://www.portofoakland.com/port-of-oakland-and-trapac-celebrate-new-electric-cranes", "name": "www.portofoakland.com", "origin": "live", "checksum": "72763dbfa683cb603a6e350db2eaed794f5a4f0543147dcf907fe50c2084bc19", "observed_at": "2026-10-18T21:58:06.097601+00:00", "revision_id": "2c457f72-459f-4b5a-b5a7-acaa5dde2d6c", "published_at": null}, "locator": "/html/body/div[2]/div/div[2]/div/div[1]/div[2]/div/p[1]", "claim_id": "c45711d4-3558-4bf0-b63d-3019f47bd018", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.portofoakland.com", "evidence_id": "a60e8816-7a24-4e3d-b16f-32749fd20095", "valid_until": null, "assertion_id": "200f87e5-10fe-4705-a8a5-03672b53d0a3", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "TraPac Terminal, Port of Oakland, Oakland, California.", "rights": "facts_only", "source": {"url": "https://www.portofoakland.com/port-of-oakland-and-trapac-celebrate-new-electric-cranes", "name": "www.portofoakland.com", "origin": "live", "checksum": "72763dbfa683cb603a6e350db2eaed794f5a4f0543147dcf907fe50c2084bc19", "observed_at": "2026-10-18T21:58:06.097601+00:00", "revision_id": "2c457f72-459f-4b5a-b5a7-acaa5dde2d6c", "published_at": null}, "locator": "/html/body/div[2]/div/div[2]/div/div[1]/div[2]/div/p[1]", "claim_id": "23d017e3-041f-4e34-b2e0-e676444ee511", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.portofoakland.com", "evidence_id": "a60e8816-7a24-4e3d-b16f-32749fd20095", "valid_until": null, "assertion_id": "a0cae04a-28b2-47a9-812e-824d1986308a", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "09e5fc6e-ec1c-4cde-8600-57d42620d0cf", "publication": {"local_only": false, "reviewed_at": "2026-10-18T22:35:41.920853+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "A Port of Oakland update dated July 30, 2026, describes four electric ship-to-shore cranes at TraPac\u2019s Oakland terminal. It reports that the first two had been commissioned and were operational, while the remaining two were still being built and were expected to enter service in Fall 2026. The article identifies Liebherr as manufacturer and Pacific Crane Maintenance Company as on-site assembler.", "schema_version": "1.0", "public_unknowns": ["The July 2026 article does not state project cost, financing amount, or procurement route, or identify a supplier opportunity. It also does not establish the later status of the two cranes expected to enter service in Fall 2026."], "evidence_observed_at": "2026-10-18T21:58:06.097601+00:00", "knowledge_reviewed_at": "2026-10-18T22:33:57.555453+00:00", "decisive_evidence_observed_at": "2026-10-18T21:58:06.097601+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Oakland TraPac electric crane phase: four new ship-to-shore cranes at TraPac\u2019s Oakland terminal.", "original_project_title": "Oakland TraPac electric crane phase: four new ship-to-shore cranes at TraPac\u2019s Oakland terminal.", "canonical_url": "https://capexcue.com/projects/oakland-trapac-electric-crane-phase-four-new-ship-to-shore-cranes-at-trapacs-oakland-terminal-9d99df58-e14/", "release": {"id": "7a639888-f0c2-4b05-b4b3-cf44f83009fb", "number": 1, "published_at": "2026-10-18T22:38:39.616038+00:00"}, "release_reference": "release 1 (7a639888-f0c2-4b05-b4b3-cf44f83009fb)", "current_dossier_url": "https://capexcue.com/projects/oakland-trapac-electric-crane-phase-four-new-ship-to-shore-cranes-at-trapacs-oakland-terminal-9d99df58-e14/", "citation": "CapexCue \u2014 Oakland TraPac electric crane phase: four new ship-to-shore cranes at TraPac\u2019s Oakland terminal. \u2014 dossier released 2026-10-18T22:38:39.616038+00:00, release 1 (7a639888-f0c2-4b05-b4b3-cf44f83009fb) \u2014 https://capexcue.com/projects/oakland-trapac-electric-crane-phase-four-new-ship-to-shore-cranes-at-trapacs-oakland-terminal-9d99df58-e14/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "codex_retained_dossier_curation", "value": "transport_logistics", "support": {"end": 335, "start": 0, "sources": [{"url": "https://www.portofoakland.com/port-of-oakland-and-trapac-celebrate-new-electric-cranes", "name": "www.portofoakland.com", "origin": "live", "checksum": "72763dbfa683cb603a6e350db2eaed794f5a4f0543147dcf907fe50c2084bc19", "observed_at": "2026-10-18T21:58:06.097601+00:00", "revision_id": "2c457f72-459f-4b5a-b5a7-acaa5dde2d6c", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "Four new 100%-electric Liebherr ship-to-shore cranes, manufactured in Ireland; each is reported as 440+ feet tall, designed to reach 24 container rows and work stacks up to 11 containers high. Two were reported in service/fully operational; the other two were under construction or assembly and expected to be operational in Fall 2026.", "statement": "Four new 100%-electric Liebherr ship-to-shore cranes, manufactured in Ireland; each is reported as 440+ feet tall, designed to reach 24 container rows and work stacks up to 11 containers high. Two were reported in service/fully operational; the other two were under construction or assembly and expected to be operational in Fall 2026.", "qualifications": {"attribution": "www.portofoakland.com"}}, "label": "Transport and logistics", "icon": "bridge"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "codex_retained_dossier_curation", "value": "transport_logistics", "support": {"end": 335, "start": 0, "sources": [{"url": "https://www.portofoakland.com/port-of-oakland-and-trapac-celebrate-new-electric-cranes", "name": "www.portofoakland.com", "origin": "live", "checksum": "72763dbfa683cb603a6e350db2eaed794f5a4f0543147dcf907fe50c2084bc19", "observed_at": "2026-10-18T21:58:06.097601+00:00", "revision_id": "2c457f72-459f-4b5a-b5a7-acaa5dde2d6c", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "Four new 100%-electric Liebherr ship-to-shore cranes, manufactured in Ireland; each is reported as 440+ feet tall, designed to reach 24 container rows and work stacks up to 11 containers high. Two were reported in service/fully operational; the other two were under construction or assembly and expected to be operational in Fall 2026.", "statement": "Four new 100%-electric Liebherr ship-to-shore cranes, manufactured in Ireland; each is reported as 440+ feet tall, designed to reach 24 container rows and work stacks up to 11 containers high. Two were reported in service/fully operational; the other two were under construction or assembly and expected to be operational in Fall 2026.", "qualifications": {"attribution": "www.portofoakland.com"}}}, "input_hash": "b7dcc51d051a5b952fe075b9acde43120f31b23c5dc2d850e250eeb97f189f2d", "release_id": "7a639888-f0c2-4b05-b4b3-cf44f83009fb", "type_codes": ["seaport"], "field_states": {"type": {"state": "accepted", "reason": "Oakland, California identifies the United States; port-terminal crane upgrade, while manufacturing in Ireland does not locate the project there."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "Oakland, California identifies the United States; port-terminal crane upgrade, while manufacturing in Ireland does not locate the project there."}, "category": {"state": "accepted", "reason": "Oakland, California identifies the United States; port-terminal crane upgrade, while manufacturing in Ireland does not locate the project there."}}, "region_codes": ["north_america"], "release_hash": "4c92a2e8ac1b9420d0f3ef5f6ca78f78b90c7ac289be33965988c9149d667785", "assessment_id": "d53c3d13-1341-492e-96b3-74881ceb1ea2", "country_codes": ["US"], "assessment_hash": "dda5943dc280ac5bb573fb7ba35413ba42562f39139a1578ba15bdd019925ce8", "country_label": "United States", "region_label": "North America", "type_labels": ["Seaport"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}