# North Irish Sea Array (NISA)

Publisher: CapexCue
Canonical dossier: <https://capexcue.com/projects/nisa-aa1b468d-d4a/>
Dossier reference: release 3 (e98eaa63-bec7-49f2-9530-9d25d97ad224)

Released project intelligence

Oldest supporting observation: 2026-10-18T19:00:02.783381+00:00
Dossier released: 2026-10-20T14:05:21.130208+00:00
Source report dates and capture dates are listed per fact below; neither establishes an event date.

Original released project name: NISA

## Project summary

NISA is a proposed offshore wind-energy project in Ireland, in a development area off Dublin, Meath and Louth. The closest potential turbine location is described as more than 12 km from shore (NISA project page, “The project at a glance” and “Location”). The planning proposal presents two alternative turbine layouts: 35 wind turbine generators with maximum tip height 316 m, or 49 with maximum tip height 290 m. Its proposed offshore infrastructure includes inter-array cables, an offshore substation platform and an export cable corridor. The project page describes a WTG foundation refinement from monopiles to jackets with suction buckets; the 2026 offshore construction-strategy addendum says piling is no longer included in the WTG foundation construction strategy. These are design and strategy statements, not confirmation of the final installed arrangement (NISA project page, “Offshore Design Layout”; 2026 offshore construction-strategy addendum, replacement of Table 8.1).

The proposed onshore cable route goes around north of Balbriggan, crosses under the M1 and reaches Belcamp Substation; the grid facility is planned west of the R132. The project page describes trenchless HDD beneath the coastline north of Balbriggan as the preferred approach following engagement feedback, and states that no grid facility is planned between the road and coast (NISA project page, “Onshore Landfall location,” “Onshore Horizontal Directional Drilling (HDD),” “Onshore Grid Facility” and “Onshore cable route”). The project page reports offshore surveys in 2022 and 2023, including geophysical, benthic and geotechnical investigations with cone penetration tests and boreholes. It reports that conditions within the site boundaries vary significantly and that survey information informed the design and construction-method work (NISA project page, “Seabed conditions”).

The project timeline reports a 2024 planning application, receipt and analysis of a request for further information in 2025, and a response submitted in 2026. An authority status table observed on 19 October 2026 records the application as received on 7 June 2024, the information request as dated 10 April 2025, the response as received on 29 June 2026, and further submissions invited up to 21 October 2026. This is a reported planning-process status, not a permission decision (NISA project page, “Project timeline”; authority, “Overview of Current Status of Phase 1 ORE Applications”).

The project page lists 2027 as the target for commencement of onshore construction and 2031 as the target for project delivery. Separately, the 2026 offshore addendum updates the planned offshore construction commencement from 2027 to 2028 while retaining a three-year duration; replacement Table A8.1 labels the programme years 2028, 2029 and 2030. It lists landfall, export cable, foundation, substation, array cable and turbine installation activities. The table’s foundation footnote expects installation to be achievable within one calendar year, but provides conditionally for remobilisation and completion in a subsequent year if installation takes longer than anticipated, for example due to adverse weather. These offshore programme years are distinct from the project page’s onshore commencement and overall delivery targets; none establishes that construction or delivery has been achieved (NISA project page, “Project timeline”; 2026 offshore construction-strategy addendum, replacement Table A8.1 and foundation footnote).

## Evidence limits and unknowns

- The supplied planning-status observation does not establish the outcome of the further-submission period ending 21 October 2026, a permission decision, or any later planning status (authority, “Overview of Current Status of Phase 1 ORE Applications”; observed 19 October 2026).
- The supplied extracts do not establish whether construction has commenced, the final turbine layout or installed foundation arrangement, FID, contract awards, procurement status, or a supplier buying window (NISA project page, “Offshore Design Layout” and “Project timeline”; authority status table; 2026 offshore construction-strategy addendum).
- No project-specific budget or financing arrangement is stated in the supplied extracts.

Current purchasing availability: unknown.
Source-dated plans do not establish current progress or available supplier packages.

## Project metadata

Country: Ireland
Region: Europe
Physical assets: Wind Power
Derived from the exact released evidence; unresolved fields remain unclassified.

## Project category

Energy
Derived from the reviewed sector statement; delivery stage remains unclassified.
Offshore wind energy.
Source: www.northirishseaarray.ie — https://www.northirishseaarray.ie/the-project/ | published unknown | observed 2026-10-18T19:00:02.783381+00:00

Project overview
Oldest decisive evidence: 2026-10-18T19:00:02.783381+00:00
Newest evidence: 2026-10-19T16:33:56.048613+00:00
Knowledge reviewed: 2026-10-20T14:05:21.130208+00:00
Publication reviewed: 2026-10-20T14:05:21.130208+00:00

## Name
NISA
Status: reported
Attribution: www.northirishseaarray.ie
Source: www.northirishseaarray.ie — https://www.northirishseaarray.ie/the-project/ | published unknown | observed 2026-10-18T19:00:02.783381+00:00

## Scope
Proposed offshore wind farm with two planning layout options: 35 wind turbine generators (WTGs) with maximum tip height 316 m, or 49 WTGs with maximum tip height 290 m. Offshore infrastructure includes inter-array cables, an offshore substation platform and an export cable corridor. The proposed foundation refinement removes monopiles in favour of jackets with suction buckets. Onshore infrastructure includes a grid facility west of the R132 and a proposed cable route around north Balbriggan, under the M1, to the grid connection point at Belcamp Substation.
Status: planned
Attribution: www.northirishseaarray.ie
Source: www.northirishseaarray.ie — https://www.northirishseaarray.ie/the-project/ | published unknown | observed 2026-10-18T19:00:02.783381+00:00

## Sector
Offshore wind energy.
Status: planned
Attribution: www.northirishseaarray.ie
Source: www.northirishseaarray.ie — https://www.northirishseaarray.ie/the-project/ | published unknown | observed 2026-10-18T19:00:02.783381+00:00

## Country
Ireland.
Status: reported
Attribution: www.northirishseaarray.ie
Source: www.northirishseaarray.ie — https://www.northirishseaarray.ie/the-project/ | published unknown | observed 2026-10-18T19:00:02.783381+00:00

## Delivery
Target project delivery date: 2031.
Status: planned
Attribution: www.northirishseaarray.ie
Source: www.northirishseaarray.ie — https://www.northirishseaarray.ie/the-project/ | published unknown | observed 2026-10-18T19:00:02.783381+00:00

## Location
Proposed development area off the coasts of Dublin, Meath and Louth; the closest potential turbine location would be more than 12 km from shore.
Status: planned
Attribution: www.northirishseaarray.ie
Source: www.northirishseaarray.ie — https://www.northirishseaarray.ie/the-project/ | published unknown | observed 2026-10-18T19:00:02.783381+00:00

## Regulatory
The planning application was submitted to An Bord Pleanála in 2024. The project timeline reports receipt and analysis of a Request for Further Information in 2025, followed by a response submitted to An Coimisiún Pleanála (formerly An Bord Pleanála) in 2026.
Status: reported
Attribution: www.northirishseaarray.ie
Source: www.northirishseaarray.ie — https://www.northirishseaarray.ie/the-project/ | published unknown | observed 2026-10-18T19:00:02.783381+00:00

## Next Milestone
Target date for commencement of construction of onshore infrastructure: 2027.
Status: planned
Attribution: www.northirishseaarray.ie
Source: www.northirishseaarray.ie — https://www.northirishseaarray.ie/the-project/ | published unknown | observed 2026-10-18T19:00:02.783381+00:00


## Source qualifications and unresolved questions

- Canonical facts retain their original source scope. Later source qualifications do not redefine the original asset or establish open supplier procurement.

The North Irish Sea Array (NISA) row, reference ABP-319866-24, records that the application was received 7 June, 2024; the request for further information was dated 10 April 2025; the response was received 29 June, 2026; and the FI Response was deemed significant, with notices published inviting further submissions up to 21 October, 2026. (reported). An Coimisiun Pleanala (externally supplied capture), source observed 2026-10-19; https://www.pleanala.ie/en-ie/statistics/renewable-energy-statistics-(1)

The addendum replaces 2024 EIAR Table 8.1 and updates offshore construction commencement from 2027 to 2028, retaining the three-year programme duration. (planned). NISA / Ove Arup & Partners Ireland Limited (externally supplied capture), evidence received 2026-10-19; https://northirishseaarraysid.ie/wp-content/uploads/2026/06/Addendum-to-Chapter-8-Construction-Strategy-Offshore.pdf

Replacement Table A8.1 labels the offshore programme years as Year 1—2028, Year 2—2029 and Year 3—2030. It lists preconstruction activities, landfall, offshore export cable installation, WTG and OSP foundation installation, offshore substation topside installation, array cable installation and WTG installation. The foundation footnote describes a contingency: installation is expected to be achievable within one calendar year, but if it takes longer than anticipated, for example because of adverse weather, remobilisation would be needed and completion would occur in the subsequent year; the timeline reflects this longer total duration. (planned). NISA / Ove Arup & Partners Ireland Limited (externally supplied capture), evidence received 2026-10-19; https://northirishseaarraysid.ie/wp-content/uploads/2026/06/Addendum-to-Chapter-8-Construction-Strategy-Offshore.pdf

## Cite this dossier

CapexCue — North Irish Sea Array (NISA) — dossier released 2026-10-20T14:05:21.130208+00:00, release 3 (e98eaa63-bec7-49f2-9530-9d25d97ad224) — https://capexcue.com/projects/nisa-aa1b468d-d4a/.

For current information and later dossier updates, visit <https://capexcue.com/projects/nisa-aa1b468d-d4a/>.
This file records the release identified above; the current dossier may change.