{"name": "I\u0219alni\u021ba BESS, a battery energy storage system for the I\u0219alni\u021ba Solar Park.", "slug": "isalnita-bess-a-battery-energy-storage-system-for-the-isalnita-solar-park-389325a1-3f0", "as_of": "2026-10-18T15:41:19.775799+00:00", "depth": "basic", "facts": {"date": {"value": "The source article is dated September 11, 2026; this is not identified as the contract-signing date.", "rights": "facts_only", "source": {"url": "https://www.omvpetrom.com/en/media/latest-news/2026/isalnita-bess-battery-storage", "name": "www.omvpetrom.com", "origin": "live", "checksum": "91ae0be0ac87f5670292b332da5df5bb6c94d07559e78a73ae4b5bbc8bd9235c", "observed_at": "2026-10-18T08:42:40.338051+00:00", "revision_id": "636fe467-59c7-4c87-bce3-206ce1648139", "published_at": null}, "locator": "/html/body/main/section[2]/div/div/div[1]/div/p[1]", "claim_id": "e58c2e67-72e7-41c4-b870-e4c15c92f776", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.omvpetrom.com", "evidence_id": "67b7c58f-0d33-4c1a-96d8-d10291915c95", "valid_until": null, "assertion_id": "4c82b3ef-40c5-478d-989b-f189c98c5a70", "temporal_expression": "", "extraction_confidence": 0.9}, "name": {"value": "I\u0219alni\u021ba BESS, a battery energy storage system for the I\u0219alni\u021ba Solar Park.", "rights": "facts_only", "source": {"url": "https://www.omvpetrom.com/en/media/latest-news/2026/isalnita-bess-battery-storage", "name": "www.omvpetrom.com", "origin": "live", "checksum": "91ae0be0ac87f5670292b332da5df5bb6c94d07559e78a73ae4b5bbc8bd9235c", "observed_at": "2026-10-18T08:42:40.338051+00:00", "revision_id": "636fe467-59c7-4c87-bce3-206ce1648139", "published_at": null}, "locator": "/html/body/main/section[1]/div/h1", "claim_id": "266682d4-9496-42bb-a3c0-cc465a1afe73", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.omvpetrom.com", "evidence_id": "afdf4657-283e-447e-bf13-4b4015d41e64", "valid_until": null, "assertion_id": "0b804956-8836-4b2e-9fc2-960321709056", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "Battery energy storage system planned with 20 MW installed power and 40 MWh storage capacity; designed to store electricity during periods of high renewable production and make it available when demand is higher.", "rights": "facts_only", "source": {"url": "https://www.omvpetrom.com/en/media/latest-news/2026/isalnita-bess-battery-storage", "name": "www.omvpetrom.com", "origin": "live", "checksum": "91ae0be0ac87f5670292b332da5df5bb6c94d07559e78a73ae4b5bbc8bd9235c", "observed_at": "2026-10-18T08:42:40.338051+00:00", "revision_id": "636fe467-59c7-4c87-bce3-206ce1648139", "published_at": null}, "locator": "/html/body/main/div[1]/article/div[2]/div/section/div/div/div/div/ul/li", "claim_id": "f0b41949-2234-40c9-b2bd-4067e598cd29", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "www.omvpetrom.com", "evidence_id": "00b5d235-e7db-4325-815b-d0e506d1a5de", "valid_until": null, "assertion_id": "5f0a79d3-6c3b-4b83-945f-a174140612b9", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "At the I\u0219alni\u021ba solar farm, Dolj County.", "rights": "facts_only", "source": {"url": "https://www.omvpetrom.com/en/media/latest-news/2026/isalnita-bess-battery-storage", "name": "www.omvpetrom.com", "origin": "live", "checksum": "91ae0be0ac87f5670292b332da5df5bb6c94d07559e78a73ae4b5bbc8bd9235c", "observed_at": "2026-10-18T08:42:40.338051+00:00", "revision_id": "636fe467-59c7-4c87-bce3-206ce1648139", "published_at": null}, "locator": "/html/body/main/div[1]/article/div[2]/div/section/div/div/div/div/p[1]", "claim_id": "75884ce0-9338-4adc-bc0d-35e3a5413e42", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.omvpetrom.com", "evidence_id": "0b54a48a-9c13-474c-972b-b105b3660d5f", "valid_until": null, "assertion_id": "bf2df2db-dbb5-4c85-8e15-aa1676b7adbd", "temporal_expression": "", "extraction_confidence": 0.9}, "contractor": {"value": "Simtel Team is named in the EPC contract signed with OMV Petrom for the battery storage system.", "rights": "facts_only", "source": {"url": "https://www.omvpetrom.com/en/media/latest-news/2026/isalnita-bess-battery-storage", "name": "www.omvpetrom.com", "origin": "live", "checksum": "91ae0be0ac87f5670292b332da5df5bb6c94d07559e78a73ae4b5bbc8bd9235c", "observed_at": "2026-10-18T08:42:40.338051+00:00", "revision_id": "636fe467-59c7-4c87-bce3-206ce1648139", "published_at": null}, "locator": "/html/body/main/div[1]/article/div[2]/div/section/div/div/div/div/p[1]", "claim_id": "f3a1f0d0-780e-4ef1-aa4f-9c2055b465ad", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.omvpetrom.com", "evidence_id": "0b54a48a-9c13-474c-972b-b105b3660d5f", "valid_until": null, "assertion_id": "34b835cb-23fb-4ce9-97ae-9f9d729bbaab", "temporal_expression": "", "extraction_confidence": 0.9}, "procurement": {"value": "An engineering, procurement and construction contract for the BESS has been signed by OMV Petrom and Simtel Team.", "rights": "facts_only", "source": {"url": "https://www.omvpetrom.com/en/media/latest-news/2026/isalnita-bess-battery-storage", "name": "www.omvpetrom.com", "origin": "live", "checksum": "91ae0be0ac87f5670292b332da5df5bb6c94d07559e78a73ae4b5bbc8bd9235c", "observed_at": "2026-10-18T08:42:40.338051+00:00", "revision_id": "636fe467-59c7-4c87-bce3-206ce1648139", "published_at": null}, "locator": "/html/body/main/div[1]/article/div[2]/div/section/div/div/div/div/p[1]", "claim_id": "f6bb6d16-25b0-4311-800f-d42caa392ad4", "modality": "actual", "confidence": 0.9, "valid_from": null, "attribution": "www.omvpetrom.com", "evidence_id": "0b54a48a-9c13-474c-972b-b105b3660d5f", "valid_until": null, "assertion_id": "2f829fa5-d023-412e-8550-63616a0b297d", "temporal_expression": "", "extraction_confidence": 0.9}, "next_milestone": {"value": "Battery construction was expected to be completed around seven months after contract signing; the source does not give the signing date.", "rights": "facts_only", "source": {"url": "https://www.omvpetrom.com/en/media/latest-news/2026/isalnita-bess-battery-storage", "name": "www.omvpetrom.com", "origin": "live", "checksum": "91ae0be0ac87f5670292b332da5df5bb6c94d07559e78a73ae4b5bbc8bd9235c", "observed_at": "2026-10-18T08:42:40.338051+00:00", "revision_id": "636fe467-59c7-4c87-bce3-206ce1648139", "published_at": null}, "locator": "/html/body/main/div[1]/article/div[2]/div/section/div/div/div/div/p[1]", "claim_id": "645e3696-588a-4ca4-809d-f652f296ba8e", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "www.omvpetrom.com", "evidence_id": "0b54a48a-9c13-474c-972b-b105b3660d5f", "valid_until": null, "assertion_id": "b27b0034-f512-44ba-8a28-16d78f2732df", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "13935e53-d1fb-4b18-96ff-1813180c6b9b", "publication": {"local_only": false, "reviewed_at": "2026-10-18T15:43:53.534374+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "The I\u0219alni\u021ba BESS is planned for the I\u0219alni\u021ba solar farm in Dolj County as a 20 MW / 40 MWh system intended to shift renewable electricity from high-production periods to times of higher demand. OMV Petrom and Simtel Team have signed an EPC contract for the system. The source article is dated September 11, 2026, and says construction was expected to take around seven months from signing; it does not provide the contract date.", "schema_version": "1.0", "public_unknowns": ["The contract-signing date is not stated, so the reported seven-month construction estimate cannot be translated into a calendar completion date.", "The source does not report whether BESS construction has since been completed or provide a current project-status update.", "The source reports that an EPC contract has been signed, but does not state whether any additional procurement scope remains available."], "evidence_observed_at": "2026-10-18T08:42:40.338051+00:00", "knowledge_reviewed_at": "2026-10-18T15:41:20.360179+00:00", "decisive_evidence_observed_at": "2026-10-18T08:42:40.338051+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "I\u0219alni\u021ba BESS, a battery energy storage system for the I\u0219alni\u021ba Solar Park.", "original_project_title": "I\u0219alni\u021ba BESS, a battery energy storage system for the I\u0219alni\u021ba Solar Park.", "canonical_url": "https://capexcue.com/projects/isalnita-bess-a-battery-energy-storage-system-for-the-isalnita-solar-park-389325a1-3f0/", "release": {"id": "effd324a-fa33-4ce8-99f8-92eccc9cefce", "number": 1, "published_at": "2026-10-18T15:44:52.766027+00:00"}, "release_reference": "release 1 (effd324a-fa33-4ce8-99f8-92eccc9cefce)", "current_dossier_url": "https://capexcue.com/projects/isalnita-bess-a-battery-energy-storage-system-for-the-isalnita-solar-park-389325a1-3f0/", "citation": "CapexCue \u2014 I\u0219alni\u021ba BESS, a battery energy storage system for the I\u0219alni\u021ba Solar Park. \u2014 dossier released 2026-10-18T15:44:52.766027+00:00, release 1 (effd324a-fa33-4ce8-99f8-92eccc9cefce) \u2014 https://capexcue.com/projects/isalnita-bess-a-battery-energy-storage-system-for-the-isalnita-solar-park-389325a1-3f0/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 212, "start": 0, "sources": [{"url": "https://www.omvpetrom.com/en/media/latest-news/2026/isalnita-bess-battery-storage", "name": "www.omvpetrom.com", "origin": "live", "checksum": "91ae0be0ac87f5670292b332da5df5bb6c94d07559e78a73ae4b5bbc8bd9235c", "observed_at": "2026-10-18T08:42:40.338051+00:00", "revision_id": "636fe467-59c7-4c87-bce3-206ce1648139", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "Battery energy storage system planned with 20 MW installed power and 40 MWh storage capacity; designed to store electricity during periods of high renewable production and make it available when demand is higher.", "statement": "Battery energy storage system planned with 20 MW installed power and 40 MWh storage capacity; designed to store electricity during periods of high renewable production and make it available when demand is higher.", "qualifications": {"attribution": "www.omvpetrom.com"}}, "label": "Energy", "icon": "energy"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 212, "start": 0, "sources": [{"url": "https://www.omvpetrom.com/en/media/latest-news/2026/isalnita-bess-battery-storage", "name": "www.omvpetrom.com", "origin": "live", "checksum": "91ae0be0ac87f5670292b332da5df5bb6c94d07559e78a73ae4b5bbc8bd9235c", "observed_at": "2026-10-18T08:42:40.338051+00:00", "revision_id": "636fe467-59c7-4c87-bce3-206ce1648139", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "Battery energy storage system planned with 20 MW installed power and 40 MWh storage capacity; designed to store electricity during periods of high renewable production and make it available when demand is higher.", "statement": "Battery energy storage system planned with 20 MW installed power and 40 MWh storage capacity; designed to store electricity during periods of high renewable production and make it available when demand is higher.", "qualifications": {"attribution": "www.omvpetrom.com"}}}, "input_hash": "7fc5e86da495f8123d8624b3482b64bac62e8635f55852acef29273fd4e77ca9", "release_id": "effd324a-fa33-4ce8-99f8-92eccc9cefce", "type_codes": ["battery_storage"], "field_states": {"type": {"state": "accepted", "reason": "Isalnita, Dolj County is in Romania; the project is the battery at the solar farm."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "Isalnita, Dolj County is in Romania; the project is the battery at the solar farm."}, "category": {"state": "accepted", "reason": "Isalnita, Dolj County is in Romania; the project is the battery at the solar farm."}}, "region_codes": ["europe"], "release_hash": "360eec642f3a5b2f067138ca0f5e4dc6f9e050a43c940d87ac98c1120d1d78a9", "assessment_id": "a6999b03-312d-4c3d-924d-8ec36ebfa1dd", "country_codes": ["RO"], "assessment_hash": "82cd889ce3268008c31336286320b0711ddb82244b7c33f2b2c39b5f5f9f53ac", "country_label": "Romania", "region_label": "Europe", "type_labels": ["Battery Storage"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}