{"name": "Listed as \u201cN25 Midleton to Youghal (bypasses Castlemartyr)\u201d. The description qualifies the bypass scope: bypasses of Castlemartyr and Killeagh are potential options for further assessment, not confirmed components.", "slug": "listed-as-n25-midleton-to-youghal-bypasses-castlemartyr-the-description-qualifies-the-bypass-scope-bypasses-of-castlemartyr-a-7b227716780f6ecd", "as_of": "2026-10-01T08:16:26.897441+00:00", "depth": "basic", "facts": {"name": {"value": "Listed as \u201cN25 Midleton to Youghal (bypasses Castlemartyr)\u201d. The description qualifies the bypass scope: bypasses of Castlemartyr and Killeagh are potential options for further assessment, not confirmed components.", "rights": "facts_only", "source": {"url": "https://www.tii.ie/media/hmqmkadl/final_full-report_major-roads-and-greenways-projects-active-list_2024.pdf", "name": "Transport Infrastructure Ireland", "origin": "live", "checksum": "638add5d529c54253168c16467650d9eb7d5e652c1e1d45002cd80328b0fb384", "observed_at": "2026-10-01T00:25:54.677513+00:00", "revision_id": "075a5e4b-2d97-4edc-bcee-f53d612f6b06", "published_at": null}, "locator": "page:23", "claim_id": "0424924e-1e15-4154-8cc4-4abc9722f9d4", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "Transport Infrastructure Ireland", "evidence_id": "5d1ce839-a825-4568-88d1-7ee46cf5b1e1", "valid_until": null, "assertion_id": "66e28732-8a39-4fd2-bd87-d5b2bd8d227c", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "A project on the N25 from Lakeview Roundabout in Midleton to the Youghal Bypass at Ballyvergan. The listed road length is circa 20 km but is to be determined, and the cross-section is undetermined. Route options are under development. The page says potential Castlemartyr and Killeagh bypasses are to be assessed further alongside potential multi-modal transport solutions; it does not establish a final alignment or selected scope.", "rights": "facts_only", "source": {"url": "https://www.tii.ie/media/hmqmkadl/final_full-report_major-roads-and-greenways-projects-active-list_2024.pdf", "name": "Transport Infrastructure Ireland", "origin": "live", "checksum": "638add5d529c54253168c16467650d9eb7d5e652c1e1d45002cd80328b0fb384", "observed_at": "2026-10-01T00:25:54.677513+00:00", "revision_id": "075a5e4b-2d97-4edc-bcee-f53d612f6b06", "published_at": null}, "locator": "page:23", "claim_id": "81f53d66-ae2d-4694-814e-b119dd123739", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "Transport Infrastructure Ireland", "evidence_id": "fd0b6309-886e-4d45-96a6-6d7293e69289", "valid_until": null, "assertion_id": "ace8701e-5015-4b2c-9844-080bed4f9a14", "temporal_expression": "", "extraction_confidence": 0.9}, "country": {"value": "Ireland.", "rights": "facts_only", "source": {"url": "https://www.tii.ie/media/hmqmkadl/final_full-report_major-roads-and-greenways-projects-active-list_2024.pdf", "name": "Transport Infrastructure Ireland", "origin": "live", "checksum": "638add5d529c54253168c16467650d9eb7d5e652c1e1d45002cd80328b0fb384", "observed_at": "2026-10-01T00:25:54.677513+00:00", "revision_id": "075a5e4b-2d97-4edc-bcee-f53d612f6b06", "published_at": null}, "locator": "page:23", "claim_id": "b66d28ae-3922-4961-98ef-49b0a500316c", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "Transport Infrastructure Ireland", "evidence_id": "cb842ad3-c921-45f3-b63f-ce2f9e7c8fbc", "valid_until": null, "assertion_id": "3fdc77a3-6dca-4031-b6ec-64d4d5c4e3f2", "temporal_expression": "", "extraction_confidence": 0.9}, "ecology": {"value": "The page presents decarbonisation, lower greenhouse-gas emissions, and improved air and noise quality as objectives or anticipated benefits, not achieved outcomes.", "rights": "facts_only", "source": {"url": "https://www.tii.ie/media/hmqmkadl/final_full-report_major-roads-and-greenways-projects-active-list_2024.pdf", "name": "Transport Infrastructure Ireland", "origin": "live", "checksum": "638add5d529c54253168c16467650d9eb7d5e652c1e1d45002cd80328b0fb384", "observed_at": "2026-10-01T00:25:54.677513+00:00", "revision_id": "075a5e4b-2d97-4edc-bcee-f53d612f6b06", "published_at": null}, "locator": "page:23", "claim_id": "f871bdf0-e6ed-4e50-8e1d-4cae45520abf", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "Transport Infrastructure Ireland", "evidence_id": "23401e5d-1346-4066-8130-bab109d2f7b3", "valid_until": null, "assertion_id": "d0846f0d-8ff9-4370-89be-c0efbee7aad0", "temporal_expression": "", "extraction_confidence": 0.9}, "activity": {"value": "The project is at concept and feasibility stage. The page describes objectives of addressing congestion and safety on the N25. It reports AADT in excess of 17,000 at Castlemartyr, with heavy goods vehicles accounting for 5%, and AADT of 13,000 east of Killeagh; it also notes identified High Collision Locations along this N25 section.", "rights": "facts_only", "source": {"url": "https://www.tii.ie/media/hmqmkadl/final_full-report_major-roads-and-greenways-projects-active-list_2024.pdf", "name": "Transport Infrastructure Ireland", "origin": "live", "checksum": "638add5d529c54253168c16467650d9eb7d5e652c1e1d45002cd80328b0fb384", "observed_at": "2026-10-01T00:25:54.677513+00:00", "revision_id": "075a5e4b-2d97-4edc-bcee-f53d612f6b06", "published_at": null}, "locator": "page:23", "claim_id": "7486f9cf-c6cd-45b1-b5c7-4f811357707b", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "Transport Infrastructure Ireland", "evidence_id": "d5656a66-87cb-4739-ac84-2bac249d836a", "valid_until": null, "assertion_id": "79d774bd-cb8a-4c6b-8e4b-9f03a701c5df", "temporal_expression": "", "extraction_confidence": 0.9}, "delivery": {"value": "Construction timeframe is stated as post-2030, with the timing still to be confirmed.", "rights": "facts_only", "source": {"url": "https://www.tii.ie/media/hmqmkadl/final_full-report_major-roads-and-greenways-projects-active-list_2024.pdf", "name": "Transport Infrastructure Ireland", "origin": "live", "checksum": "638add5d529c54253168c16467650d9eb7d5e652c1e1d45002cd80328b0fb384", "observed_at": "2026-10-01T00:25:54.677513+00:00", "revision_id": "075a5e4b-2d97-4edc-bcee-f53d612f6b06", "published_at": null}, "locator": "page:23", "claim_id": "86dd750b-1455-44f4-97f9-ced2ebe84149", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "Transport Infrastructure Ireland", "evidence_id": "e39e5297-3363-4c4f-a14f-00febe465403", "valid_until": null, "assertion_id": "bc048ba3-4937-4636-acfd-7384ac641c49", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Cork, along the N25 corridor between Midleton and Youghal, including the villages of Castlemartyr and Killeagh in the described corridor.", "rights": "facts_only", "source": {"url": "https://www.tii.ie/media/hmqmkadl/final_full-report_major-roads-and-greenways-projects-active-list_2024.pdf", "name": "Transport Infrastructure Ireland", "origin": "live", "checksum": "638add5d529c54253168c16467650d9eb7d5e652c1e1d45002cd80328b0fb384", "observed_at": "2026-10-01T00:25:54.677513+00:00", "revision_id": "075a5e4b-2d97-4edc-bcee-f53d612f6b06", "published_at": null}, "locator": "page:23", "claim_id": "355c7ac7-8030-4046-9de3-5b940e10e735", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "Transport Infrastructure Ireland", "evidence_id": "176ab953-bd3c-4009-baab-38c4b1391157", "valid_until": null, "assertion_id": "c6535615-a782-46e6-a387-b1b462905659", "temporal_expression": "", "extraction_confidence": 0.9}, "investment": {"value": "Forecast cost range is TBC and subject to planning and design; the benefit-cost ratio is pending project development.", "rights": "facts_only", "source": {"url": "https://www.tii.ie/media/hmqmkadl/final_full-report_major-roads-and-greenways-projects-active-list_2024.pdf", "name": "Transport Infrastructure Ireland", "origin": "live", "checksum": "638add5d529c54253168c16467650d9eb7d5e652c1e1d45002cd80328b0fb384", "observed_at": "2026-10-01T00:25:54.677513+00:00", "revision_id": "075a5e4b-2d97-4edc-bcee-f53d612f6b06", "published_at": null}, "locator": "page:23", "claim_id": "3f386016-1559-4c28-85f6-e2be75fb6f68", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "Transport Infrastructure Ireland", "evidence_id": "a085b8ea-340d-45e3-9e96-5683d4b2203b", "valid_until": null, "assertion_id": "cfa1668a-9c34-433d-a005-bfea2fef035c", "temporal_expression": "", "extraction_confidence": 0.9}, "next_milestone": {"value": "The next IG Gateway is listed as Gate 1 Approval in Principle; the page does not say this approval has been achieved.", "rights": "facts_only", "source": {"url": "https://www.tii.ie/media/hmqmkadl/final_full-report_major-roads-and-greenways-projects-active-list_2024.pdf", "name": "Transport Infrastructure Ireland", "origin": "live", "checksum": "638add5d529c54253168c16467650d9eb7d5e652c1e1d45002cd80328b0fb384", "observed_at": "2026-10-01T00:25:54.677513+00:00", "revision_id": "075a5e4b-2d97-4edc-bcee-f53d612f6b06", "published_at": null}, "locator": "page:23", "claim_id": "68bd49dd-8e77-41ab-86d3-a4f0cbeff3b0", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "Transport Infrastructure Ireland", "evidence_id": "ccf6d0f7-5dea-45b4-81f9-c7b75a326987", "valid_until": null, "assertion_id": "5af5a057-50f3-4965-a389-52b91809441b", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "22b9c9e9-9f4b-44fa-bd66-3dead0eedb19", "publication": {"local_only": false, "reviewed_at": "2026-10-15T18:34:10.314262+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "Transport Infrastructure Ireland\u2019s December 2024 Major Roads & Greenways Projects Active List identifies \u201cN25 Midleton to Youghal (bypasses Castlemartyr)\u201d in Cork, on the N25 from Lakeview Roundabout in Midleton to the Youghal Bypass at Ballyvergan. The entry lists the project at Phase 1 Concept & Feasibility. Its length is circa 20 km but remains to be determined, the cross-section is undetermined, and route options are under development. Potential Castlemartyr and Killeagh bypasses and multi-modal transport solutions are identified for further assessment; none is confirmed as selected scope.\n\nThe listed next IG Gateway is Gate 1 Approval in Principle; the entry does not report that it has been achieved. Construction is listed as post-2030, with timing to be confirmed. The forecast cost range is TBC, subject to planning and design, and the benefit-cost ratio is pending project development.\n\nThe entry describes congestion and safety concerns and reports AADT in excess of 17,000 at Castlemartyr, with heavy goods vehicles accounting for 5%, AADT of 13,000 east of Killeagh, and identified High Collision Locations on this N25 section. Decarbonisation, lower greenhouse-gas emissions, and improved air and noise quality are presented as objectives or anticipated benefits, not achieved outcomes.", "schema_version": "1.0", "public_unknowns": ["The final route, length, cross-section, and whether either potential bypass or multi-modal solutions will form part of the selected project are not established in the December 2024 entry.", "The entry lists Gate 1 Approval in Principle as the next gateway but does not give its outcome or establish whether approval has since been obtained.", "The December 2024 entry does not establish later project status, procurement, financing, or project roles.", "This account covers the December 2024 list\u2019s cover and N25 project entry (pp. 1 and 23); other pages and graphical content were not assessed."], "evidence_observed_at": "2026-10-01T00:25:54.677513+00:00", "knowledge_reviewed_at": "2026-10-15T18:34:10.314262+00:00", "decisive_evidence_observed_at": "2026-10-01T00:25:54.677513+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Listed as \u201cN25 Midleton to Youghal (bypasses Castlemartyr)\u201d. The description qualifies the bypass scope: bypasses of Castlemartyr and Killeagh are potential options for further assessment, not confirmed components.", "original_project_title": "Listed as \u201cN25 Midleton to Youghal (bypasses Castlemartyr)\u201d. The description qualifies the bypass scope: bypasses of Castlemartyr and Killeagh are potential options for further assessment, not confirmed components.", "canonical_url": "https://capexcue.com/projects/listed-as-n25-midleton-to-youghal-bypasses-castlemartyr-the-description-qualifies-the-bypass-scope-bypasses-of-castlemartyr-a-7b227716780f6ecd/", "release": {"id": "36375219-1cb2-4942-a21e-b38b5f26b486", "number": 1, "published_at": "2026-10-15T18:34:11.019405+00:00"}, "release_reference": "release 1 (36375219-1cb2-4942-a21e-b38b5f26b486)", "current_dossier_url": "https://capexcue.com/projects/listed-as-n25-midleton-to-youghal-bypasses-castlemartyr-the-description-qualifies-the-bypass-scope-bypasses-of-castlemartyr-a-7b227716780f6ecd/", "citation": "CapexCue \u2014 Listed as \u201cN25 Midleton to Youghal (bypasses Castlemartyr)\u201d. The description qualifies the bypass scope: bypasses of Castlemartyr and Killeagh are potential options for further assessment, not confirmed components. \u2014 dossier released 2026-10-15T18:34:11.019405+00:00, release 1 (36375219-1cb2-4942-a21e-b38b5f26b486) \u2014 https://capexcue.com/projects/listed-as-n25-midleton-to-youghal-bypasses-castlemartyr-the-description-qualifies-the-bypass-scope-bypasses-of-castlemartyr-a-7b227716780f6ecd/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "codex_retained_dossier_curation", "value": "transport_logistics", "support": {"end": 432, "start": 0, "sources": [{"url": "https://www.tii.ie/media/hmqmkadl/final_full-report_major-roads-and-greenways-projects-active-list_2024.pdf", "name": "Transport Infrastructure Ireland", "origin": "live", "checksum": "638add5d529c54253168c16467650d9eb7d5e652c1e1d45002cd80328b0fb384", "observed_at": "2026-10-01T00:25:54.677513+00:00", "revision_id": "075a5e4b-2d97-4edc-bcee-f53d612f6b06", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "A project on the N25 from Lakeview Roundabout in Midleton to the Youghal Bypass at Ballyvergan. The listed road length is circa 20 km but is to be determined, and the cross-section is undetermined. Route options are under development. The page says potential Castlemartyr and Killeagh bypasses are to be assessed further alongside potential multi-modal transport solutions; it does not establish a final alignment or selected scope.", "statement": "A project on the N25 from Lakeview Roundabout in Midleton to the Youghal Bypass at Ballyvergan. The listed road length is circa 20 km but is to be determined, and the cross-section is undetermined. Route options are under development. The page says potential Castlemartyr and Killeagh bypasses are to be assessed further alongside potential multi-modal transport solutions; it does not establish a final alignment or selected scope.", "qualifications": {"attribution": "Transport Infrastructure Ireland"}}, "label": "Transport and logistics", "icon": "bridge"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "codex_retained_dossier_curation", "value": "transport_logistics", "support": {"end": 432, "start": 0, "sources": [{"url": "https://www.tii.ie/media/hmqmkadl/final_full-report_major-roads-and-greenways-projects-active-list_2024.pdf", "name": "Transport Infrastructure Ireland", "origin": "live", "checksum": "638add5d529c54253168c16467650d9eb7d5e652c1e1d45002cd80328b0fb384", "observed_at": "2026-10-01T00:25:54.677513+00:00", "revision_id": "075a5e4b-2d97-4edc-bcee-f53d612f6b06", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "A project on the N25 from Lakeview Roundabout in Midleton to the Youghal Bypass at Ballyvergan. The listed road length is circa 20 km but is to be determined, and the cross-section is undetermined. Route options are under development. The page says potential Castlemartyr and Killeagh bypasses are to be assessed further alongside potential multi-modal transport solutions; it does not establish a final alignment or selected scope.", "statement": "A project on the N25 from Lakeview Roundabout in Midleton to the Youghal Bypass at Ballyvergan. The listed road length is circa 20 km but is to be determined, and the cross-section is undetermined. Route options are under development. The page says potential Castlemartyr and Killeagh bypasses are to be assessed further alongside potential multi-modal transport solutions; it does not establish a final alignment or selected scope.", "qualifications": {"attribution": "Transport Infrastructure Ireland"}}}, "input_hash": "52cb1f41186d5ad15450b722bd0461c181ed8856050c6fdddaa3a7e99a914da3", "release_id": "36375219-1cb2-4942-a21e-b38b5f26b486", "type_codes": ["road"], "field_states": {"type": {"state": "accepted", "reason": "Irish N25 road-corridor project; bypass alternatives, alignment, length and cross-section remain unselected."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "supported_physical_country"}, "category": {"state": "accepted", "reason": "Irish N25 road-corridor project; bypass alternatives, alignment, length and cross-section remain unselected."}}, "region_codes": ["europe"], "release_hash": "e10844aba2d4f50a0dcc3fcc81bbb4638dd9b524fdca116aa71153efb65b2074", "assessment_id": "1af659fe-1a62-4ee8-b18e-9c6c7421495e", "country_codes": ["IE"], "assessment_hash": "230b19e7479f60ec3eca02c04d6e20be739fc156cf6fdb32b11680b3d230d0bf", "country_label": "Ireland", "region_label": "Europe", "type_labels": ["Road"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}