{"name": "Muchea Battery.", "slug": "muchea-battery-f0cd1710-9f3", "as_of": "2026-10-17T12:50:37.858131+00:00", "depth": "basic", "facts": {"date": {"value": "The announcement is dated Sydney & Paris, 1 October 2025.", "rights": "facts_only", "source": {"url": "https://australia.neoen.com/en/news/2025/neoen-launches-first-6-hour-battery-in-muchea-delivers-collie-battery-2-both-in-western-australia/", "name": "australia.neoen.com", "origin": "live", "checksum": "65260241bc636c1ef384e4743a3f57f6ad72e7a2d2bd9f2264cb5b08e6205aa0", "observed_at": "2026-10-17T12:41:56.358285+00:00", "revision_id": "7a046d5c-e713-4879-a8b1-50862acc4743", "published_at": null}, "locator": "/html/body/main/div[2]/div[1]/text-position:11", "claim_id": "7e75cc6d-34c0-44d9-936f-17c1e6ddcba6", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "australia.neoen.com", "evidence_id": "e659c5ad-4d8d-42fb-8b91-ccc327a37365", "valid_until": null, "assertion_id": "8dd7c060-7d6e-4413-b930-250add036fae", "temporal_expression": "", "extraction_confidence": 0.9}, "name": {"value": "Muchea Battery.", "rights": "facts_only", "source": {"url": "https://australia.neoen.com/en/news/2025/neoen-launches-first-6-hour-battery-in-muchea-delivers-collie-battery-2-both-in-western-australia/", "name": "australia.neoen.com", "origin": "live", "checksum": "65260241bc636c1ef384e4743a3f57f6ad72e7a2d2bd9f2264cb5b08e6205aa0", "observed_at": "2026-10-17T12:41:56.358285+00:00", "revision_id": "7a046d5c-e713-4879-a8b1-50862acc4743", "published_at": null}, "locator": "/html/body/main/div[2]/div[2]/text-position:13", "claim_id": "e796435d-fe31-4b05-b64c-e3abc6949497", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "australia.neoen.com", "evidence_id": "9b733b7c-eee8-47bd-95ff-b157101a2d61", "valid_until": null, "assertion_id": "d7e2f632-788a-4e47-ae0c-2b917f3cb5c6", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "A planned 164 MW / 905 MWh battery comprising 252 Tesla Megapack 2XL units, connecting to the existing Muchea substation.", "rights": "facts_only", "source": {"url": "https://australia.neoen.com/en/news/2025/neoen-launches-first-6-hour-battery-in-muchea-delivers-collie-battery-2-both-in-western-australia/", "name": "australia.neoen.com", "origin": "live", "checksum": "65260241bc636c1ef384e4743a3f57f6ad72e7a2d2bd9f2264cb5b08e6205aa0", "observed_at": "2026-10-17T12:41:56.358285+00:00", "revision_id": "7a046d5c-e713-4879-a8b1-50862acc4743", "published_at": null}, "locator": "/html/body/main/div[2]/article/p[1]", "claim_id": "a9fd9842-01ca-4fc0-a022-de6ce16440f9", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "australia.neoen.com", "evidence_id": "7c870692-d155-4ff6-9ffd-fbccc5ee6d9f", "valid_until": null, "assertion_id": "a9f096e9-eb53-4ea8-8f2c-ef278087beab", "temporal_expression": "", "extraction_confidence": 0.9}, "sector": {"value": "Battery energy storage.", "rights": "facts_only", "source": {"url": "https://australia.neoen.com/en/news/2025/neoen-launches-first-6-hour-battery-in-muchea-delivers-collie-battery-2-both-in-western-australia/", "name": "australia.neoen.com", "origin": "live", "checksum": "65260241bc636c1ef384e4743a3f57f6ad72e7a2d2bd9f2264cb5b08e6205aa0", "observed_at": "2026-10-17T12:41:56.358285+00:00", "revision_id": "7a046d5c-e713-4879-a8b1-50862acc4743", "published_at": null}, "locator": "/html/body/main/div[2]/article/ul/li[2]", "claim_id": "b2a56ead-0506-42fd-aa3b-05fc0d8de786", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "australia.neoen.com", "evidence_id": "cfb58d25-e942-426c-b1f7-9ef22b9f542b", "valid_until": null, "assertion_id": "e8284b59-81c9-4e31-b4f5-b5f2ae925e28", "temporal_expression": "", "extraction_confidence": 0.9}, "activity": {"value": "Neoen reported that it had provided notices to proceed to Tesla and UGL, signalling the start of construction.", "rights": "facts_only", "source": {"url": "https://australia.neoen.com/en/news/2025/neoen-launches-first-6-hour-battery-in-muchea-delivers-collie-battery-2-both-in-western-australia/", "name": "australia.neoen.com", "origin": "live", "checksum": "65260241bc636c1ef384e4743a3f57f6ad72e7a2d2bd9f2264cb5b08e6205aa0", "observed_at": "2026-10-17T12:41:56.358285+00:00", "revision_id": "7a046d5c-e713-4879-a8b1-50862acc4743", "published_at": null}, "locator": "/html/body/main/div[2]/article/ul/li[1]", "claim_id": "6bccfb6b-745c-4e94-851f-8e8c92dfbe92", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "australia.neoen.com", "evidence_id": "a0ba5455-5be1-4359-b729-34fa040912af", "valid_until": null, "assertion_id": "8974cfff-f437-485b-a136-a05a3df56d07", "temporal_expression": "", "extraction_confidence": 0.9}, "delivery": {"value": "Once operational, the battery is planned to provide grid-stability and reliability services during Western Australia\u2019s evening peaks.", "rights": "facts_only", "source": {"url": "https://australia.neoen.com/en/news/2025/neoen-launches-first-6-hour-battery-in-muchea-delivers-collie-battery-2-both-in-western-australia/", "name": "australia.neoen.com", "origin": "live", "checksum": "65260241bc636c1ef384e4743a3f57f6ad72e7a2d2bd9f2264cb5b08e6205aa0", "observed_at": "2026-10-17T12:41:56.358285+00:00", "revision_id": "7a046d5c-e713-4879-a8b1-50862acc4743", "published_at": null}, "locator": "/html/body/main/div[2]/article/p[2]", "claim_id": "dc226533-dd0d-489e-89b4-d2b03a3175d8", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "australia.neoen.com", "evidence_id": "c6cff696-374b-4519-ad78-1ef94401fa0d", "valid_until": null, "assertion_id": "7854d75c-515e-41b2-b460-4bd90f47eb20", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Muchea, Western Australia, within the Shire of Chittering and on Whadjuk Country; planned connection to Western Power\u2019s existing Muchea substation in the South-West Interconnected System (SWIS).", "rights": "facts_only", "source": {"url": "https://australia.neoen.com/en/news/2025/neoen-launches-first-6-hour-battery-in-muchea-delivers-collie-battery-2-both-in-western-australia/", "name": "australia.neoen.com", "origin": "live", "checksum": "65260241bc636c1ef384e4743a3f57f6ad72e7a2d2bd9f2264cb5b08e6205aa0", "observed_at": "2026-10-17T12:41:56.358285+00:00", "revision_id": "7a046d5c-e713-4879-a8b1-50862acc4743", "published_at": null}, "locator": "/html/body/main/div[2]/div[2]/text-position:13", "claim_id": "26c85519-8da6-4597-9e83-cf258cdce9c3", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "australia.neoen.com", "evidence_id": "9b733b7c-eee8-47bd-95ff-b157101a2d61", "valid_until": null, "assertion_id": "3325b659-81bd-49d4-9ea2-bc6f1bac7615", "temporal_expression": "", "extraction_confidence": 0.9}, "developer": {"value": "Neoen.", "rights": "facts_only", "source": {"url": "https://australia.neoen.com/en/news/2025/neoen-launches-first-6-hour-battery-in-muchea-delivers-collie-battery-2-both-in-western-australia/", "name": "australia.neoen.com", "origin": "live", "checksum": "65260241bc636c1ef384e4743a3f57f6ad72e7a2d2bd9f2264cb5b08e6205aa0", "observed_at": "2026-10-17T12:41:56.358285+00:00", "revision_id": "7a046d5c-e713-4879-a8b1-50862acc4743", "published_at": null}, "locator": "/html/body/main/div[2]/article/p[1]", "claim_id": "51729929-f2bb-45cc-9d99-6fec394c4a01", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "australia.neoen.com", "evidence_id": "7c870692-d155-4ff6-9ffd-fbccc5ee6d9f", "valid_until": null, "assertion_id": "a2001bd7-4e89-4012-af19-92df3aa78b32", "temporal_expression": "", "extraction_confidence": 0.9}, "contractor": {"value": "UGL is identified as the construction contractor.", "rights": "facts_only", "source": {"url": "https://australia.neoen.com/en/news/2025/neoen-launches-first-6-hour-battery-in-muchea-delivers-collie-battery-2-both-in-western-australia/", "name": "australia.neoen.com", "origin": "live", "checksum": "65260241bc636c1ef384e4743a3f57f6ad72e7a2d2bd9f2264cb5b08e6205aa0", "observed_at": "2026-10-17T12:41:56.358285+00:00", "revision_id": "7a046d5c-e713-4879-a8b1-50862acc4743", "published_at": null}, "locator": "/html/body/main/div[2]/article/ul/li[1]", "claim_id": "dd1a8591-c5b8-4651-b80b-efe5c633ecb6", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "australia.neoen.com", "evidence_id": "a0ba5455-5be1-4359-b729-34fa040912af", "valid_until": null, "assertion_id": "b76c8719-4fee-4f0b-a8d8-61d0c11f06b3", "temporal_expression": "", "extraction_confidence": 0.9}, "source_program": {"value": "Backed by the Australian Government\u2019s Capacity Investment Scheme; the article also says Muchea holds a Capacity Investment Scheme Agreement.", "rights": "facts_only", "source": {"url": "https://australia.neoen.com/en/news/2025/neoen-launches-first-6-hour-battery-in-muchea-delivers-collie-battery-2-both-in-western-australia/", "name": "australia.neoen.com", "origin": "live", "checksum": "65260241bc636c1ef384e4743a3f57f6ad72e7a2d2bd9f2264cb5b08e6205aa0", "observed_at": "2026-10-17T12:41:56.358285+00:00", "revision_id": "7a046d5c-e713-4879-a8b1-50862acc4743", "published_at": null}, "locator": "/html/body/main/div[2]/article/ul/li[2]", "claim_id": "ce7bfb2d-cee8-4bfa-881a-239c43a12159", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "australia.neoen.com", "evidence_id": "cfb58d25-e942-426c-b1f7-9ef22b9f542b", "valid_until": null, "assertion_id": "f6a5cd59-3fa0-4261-9389-bf1e2e76bd81", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "2a905c87-771e-4bb7-98ba-3c25c47f0b0d", "publication": {"local_only": false, "reviewed_at": "2026-10-17T12:51:57.928603+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "Neoen\u2019s announcement dated 1 October 2025 describes Muchea Battery as a planned 164 MW / 905 MWh installation of 252 Tesla Megapack 2XL units in Muchea, with a planned connection to the existing Muchea substation. Neoen reported issuing notices to proceed to Tesla and UGL, signalling the start of construction. The announcement says the project is backed by the Australian Government\u2019s Capacity Investment Scheme and is planned to provide grid-stability and reliability services during evening peaks once operational.", "schema_version": "1.0", "public_unknowns": ["The 1 October 2025 announcement reports the start of construction but does not establish current construction status, current procurement availability, an open supplier package, or a project budget."], "evidence_observed_at": "2026-10-17T12:41:56.358285+00:00", "knowledge_reviewed_at": "2026-10-17T12:50:38.161248+00:00", "decisive_evidence_observed_at": "2026-10-17T12:41:56.358285+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Muchea Battery.", "original_project_title": "Muchea Battery.", "canonical_url": "https://capexcue.com/projects/muchea-battery-f0cd1710-9f3/", "release": {"id": "b216df4f-cfc5-46ae-9474-48256c31d139", "number": 1, "published_at": "2026-10-17T12:52:42.001134+00:00"}, "release_reference": "release 1 (b216df4f-cfc5-46ae-9474-48256c31d139)", "current_dossier_url": "https://capexcue.com/projects/muchea-battery-f0cd1710-9f3/", "citation": "CapexCue \u2014 Muchea Battery. \u2014 dossier released 2026-10-17T12:52:42.001134+00:00, release 1 (b216df4f-cfc5-46ae-9474-48256c31d139) \u2014 https://capexcue.com/projects/muchea-battery-f0cd1710-9f3/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 23, "start": 0, "sources": [{"url": "https://australia.neoen.com/en/news/2025/neoen-launches-first-6-hour-battery-in-muchea-delivers-collie-battery-2-both-in-western-australia/", "name": "australia.neoen.com", "origin": "live", "checksum": "65260241bc636c1ef384e4743a3f57f6ad72e7a2d2bd9f2264cb5b08e6205aa0", "observed_at": "2026-10-17T12:41:56.358285+00:00", "revision_id": "7a046d5c-e713-4879-a8b1-50862acc4743", "published_at": null}], "modality": "reported", "predicate": "sector", "raw_value": "Battery energy storage.", "statement": "Battery energy storage.", "qualifications": {"attribution": "australia.neoen.com"}}, "label": "Energy", "icon": "energy"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 23, "start": 0, "sources": [{"url": "https://australia.neoen.com/en/news/2025/neoen-launches-first-6-hour-battery-in-muchea-delivers-collie-battery-2-both-in-western-australia/", "name": "australia.neoen.com", "origin": "live", "checksum": "65260241bc636c1ef384e4743a3f57f6ad72e7a2d2bd9f2264cb5b08e6205aa0", "observed_at": "2026-10-17T12:41:56.358285+00:00", "revision_id": "7a046d5c-e713-4879-a8b1-50862acc4743", "published_at": null}], "modality": "reported", "predicate": "sector", "raw_value": "Battery energy storage.", "statement": "Battery energy storage.", "qualifications": {"attribution": "australia.neoen.com"}}}, "input_hash": "73eab93b368722562535ce2bcc243bc28ef7751c67d57d132e7db0e581d32c9e", "release_id": "b216df4f-cfc5-46ae-9474-48256c31d139", "type_codes": ["battery_storage"], "field_states": {"type": {"state": "accepted", "reason": "supported_physical_components"}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "Muchea, Western Australia is explicit; connection to an existing substation is ancillary."}, "category": {"state": "accepted", "reason": "supported_primary_category"}}, "region_codes": ["oceania"], "release_hash": "68aee7cc7a57a01cd56987b31d8b4eb8fd63f18b1b7459ee6ae0fed8ddcf2f54", "assessment_id": "936e4edc-3f2b-4e2d-a6e6-fc32eaf55fe9", "country_codes": ["AU"], "assessment_hash": "ef70a6e990c382726984e3e40b9759a0fe874895418ca22857c70289c3862411", "country_label": "Australia", "region_label": "Oceania", "type_labels": ["Battery Storage"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}