{"name": "Botley West Solar Farm", "slug": "rr22-botley-west", "as_of": "2026-10-01T03:25:23.218117+00:00", "depth": "basic", "facts": {"name": {"value": "Botley West Solar Farm", "rights": "facts_only", "source": {"url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN010147", "name": "Planning Inspectorate", "origin": "live", "checksum": "282d8ba746f2787986c45bc44f56c79bc4b5d00309a67a25478991ebe32abfdc", "observed_at": "2026-10-01T02:16:06.518112+00:00", "revision_id": "62f40e31-064d-4c9a-b25f-33cd7040cde2", "published_at": null}, "locator": "native-name-name", "claim_id": "d5c0a908-1775-43a7-a326-21d6740e4deb", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "Planning Inspectorate", "evidence_id": "c1343e5a-d8f1-4008-93ed-ae057432ed56", "valid_until": null, "assertion_id": "5c433dbc-d90c-40f7-aeed-b3a6c4f83a15", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "Solar photovoltaic array and connection infrastructure, with a maximum intended generation capacity of 840MW.", "rights": "facts_only", "source": {"url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN010147", "name": "Planning Inspectorate", "origin": "live", "checksum": "282d8ba746f2787986c45bc44f56c79bc4b5d00309a67a25478991ebe32abfdc", "observed_at": "2026-10-01T02:16:06.518112+00:00", "revision_id": "62f40e31-064d-4c9a-b25f-33cd7040cde2", "published_at": null}, "locator": "native-scope-scope", "claim_id": "94a4449d-3127-462f-ae46-1c31841faf99", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "Planning Inspectorate", "evidence_id": "9dbf864b-e085-4a6f-83b8-76086b6af795", "valid_until": null, "assertion_id": "51bc48e2-dcd9-42c1-98d3-6b358b821d91", "temporal_expression": "", "extraction_confidence": 0.9}, "delivery": {"value": "This project is at the decision stage. The date set for this to be completed is 10 November 2026", "rights": "facts_only", "source": {"url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN010147", "name": "Planning Inspectorate", "origin": "live", "checksum": "282d8ba746f2787986c45bc44f56c79bc4b5d00309a67a25478991ebe32abfdc", "observed_at": "2026-10-01T02:16:06.518112+00:00", "revision_id": "62f40e31-064d-4c9a-b25f-33cd7040cde2", "published_at": null}, "locator": "native-delivery-adverse_context", "claim_id": "e7a4fc65-c333-4a70-a320-d986da0b149a", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "Planning Inspectorate", "evidence_id": "2b8da7f7-e813-4af2-8d9d-e2435d3ae50f", "valid_until": null, "assertion_id": "18d87266-ce43-4af2-a23b-d2a750cea195", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Land in West Oxfordshire, Cherwell and Vale of White Horse Districts, across approx 1400 hectares", "rights": "facts_only", "source": {"url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN010147", "name": "Planning Inspectorate", "origin": "live", "checksum": "282d8ba746f2787986c45bc44f56c79bc4b5d00309a67a25478991ebe32abfdc", "observed_at": "2026-10-01T02:16:06.518112+00:00", "revision_id": "62f40e31-064d-4c9a-b25f-33cd7040cde2", "published_at": null}, "locator": "native-location-location", "claim_id": "8318893b-81c4-4120-9bc3-795884e4e770", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "Planning Inspectorate", "evidence_id": "198887ac-3df3-4cf5-8ed2-a012b5e8af29", "valid_until": null, "assertion_id": "3cccda5d-313b-4d5c-b17e-cc5194856c17", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "2d30d8a5-e1dd-4e9a-a564-53119b3ed7a6", "publication": {"local_only": false, "reviewed_at": "2026-10-16T15:38:48.795211+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "Botley West Solar Farm is a planned solar photovoltaic array and connection project, with a maximum intended generation capacity of 840MW, across approximately 1,400 hectares in West Oxfordshire, Cherwell and Vale of White Horse districts. The project information observed on 1 October 2026 reported it at the decision stage, with completion set for 10 November 2026. This does not establish that a decision has been made or that construction has begun.", "schema_version": "1.0", "public_unknowns": ["Only the supplied project-information text was reviewed; this was not a review of the complete source document.", "Email-containing and link-only paragraphs, linked documents and graphical content were not reviewed.", "Later project progress and procurement availability are not established."], "evidence_observed_at": "2026-10-01T02:16:06.518112+00:00", "knowledge_reviewed_at": "2026-10-16T15:38:48.795211+00:00", "decisive_evidence_observed_at": "2026-10-01T02:16:06.518112+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Botley West Solar Farm", "original_project_title": "Botley West Solar Farm", "canonical_url": "https://capexcue.com/projects/rr22-botley-west/", "release": {"id": "7ba50403-5880-44d8-83d6-5a9c542ef038", "number": 1, "published_at": "2026-10-16T15:38:49.136096+00:00"}, "release_reference": "release 1 (7ba50403-5880-44d8-83d6-5a9c542ef038)", "current_dossier_url": "https://capexcue.com/projects/rr22-botley-west/", "citation": "CapexCue \u2014 Botley West Solar Farm \u2014 dossier released 2026-10-16T15:38:49.136096+00:00, release 1 (7ba50403-5880-44d8-83d6-5a9c542ef038) \u2014 https://capexcue.com/projects/rr22-botley-west/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 109, "start": 0, "sources": [{"url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN010147", "name": "Planning Inspectorate", "origin": "live", "checksum": "282d8ba746f2787986c45bc44f56c79bc4b5d00309a67a25478991ebe32abfdc", "observed_at": "2026-10-01T02:16:06.518112+00:00", "revision_id": "62f40e31-064d-4c9a-b25f-33cd7040cde2", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "Solar photovoltaic array and connection infrastructure, with a maximum intended generation capacity of 840MW.", "statement": "Solar photovoltaic array and connection infrastructure, with a maximum intended generation capacity of 840MW.", "qualifications": {"attribution": "Planning Inspectorate"}}, "label": "Energy", "icon": "energy"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 109, "start": 0, "sources": [{"url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN010147", "name": "Planning Inspectorate", "origin": "live", "checksum": "282d8ba746f2787986c45bc44f56c79bc4b5d00309a67a25478991ebe32abfdc", "observed_at": "2026-10-01T02:16:06.518112+00:00", "revision_id": "62f40e31-064d-4c9a-b25f-33cd7040cde2", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "Solar photovoltaic array and connection infrastructure, with a maximum intended generation capacity of 840MW.", "statement": "Solar photovoltaic array and connection infrastructure, with a maximum intended generation capacity of 840MW.", "qualifications": {"attribution": "Planning Inspectorate"}}}, "input_hash": "c6fdc83c24de2079ab94890ba5f58e262ff82e7263e93ccf760b40264dc072c7", "release_id": "7ba50403-5880-44d8-83d6-5a9c542ef038", "type_codes": ["solar_pv"], "field_states": {"type": {"state": "accepted", "reason": "Oxfordshire is in the United Kingdom; the physical project is a planned solar PV array."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "Oxfordshire is in the United Kingdom; the physical project is a planned solar PV array."}, "category": {"state": "accepted", "reason": "Oxfordshire is in the United Kingdom; the physical project is a planned solar PV array."}}, "region_codes": ["europe"], "release_hash": "b744d5045998d199df1b09559785df3e0d73a884b090bfb96daa1da9e8fe5f8d", "assessment_id": "1c98abd7-f148-4df5-841c-66be5f1b1c9a", "country_codes": ["GB"], "assessment_hash": "788ad516d2356eb95197c3800ae6a32868885822123b4d4b9383f02bb2cf18b4", "country_label": "United Kingdom", "region_label": "Europe", "type_labels": ["Solar PV"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}