{"name": "Summerfield Battery Energy Storage System (Summerfield BESS).", "slug": "summerfield-battery-energy-storage-system-summerfield-bess-15d21973-adf", "as_of": "2026-10-17T12:56:10.726971+00:00", "depth": "basic", "facts": {"date": {"value": "The announcement is dated 13 April 2026.", "rights": "facts_only", "source": {"url": "https://www.palisadegroup.com/palisade-signs-transaction-to-acquire-second-large-scale-battery-through-intera-renewables/", "name": "www.palisadegroup.com", "origin": "live", "checksum": "b64e7154292b3c9e2928aac341d351221189ece4dd063f81a4e853d617ffec68", "observed_at": "2026-10-17T12:42:03.061033+00:00", "revision_id": "8a7c635b-e5e6-4255-b7d0-a330be9c4207", "published_at": null}, "locator": "/html/body/div/main/div[2]/div/article/div/div[1]/text-position:9", "claim_id": "8d340ae2-3e3a-447d-be04-7d18e15ffac9", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.palisadegroup.com", "evidence_id": "5defba1c-a93c-47e4-af73-72f173665191", "valid_until": null, "assertion_id": "0f0ffba8-cd8c-45db-80aa-c0ac5bbc936c", "temporal_expression": "", "extraction_confidence": 0.9}, "name": {"value": "Summerfield Battery Energy Storage System (Summerfield BESS).", "rights": "facts_only", "source": {"url": "https://www.palisadegroup.com/palisade-signs-transaction-to-acquire-second-large-scale-battery-through-intera-renewables/", "name": "www.palisadegroup.com", "origin": "live", "checksum": "b64e7154292b3c9e2928aac341d351221189ece4dd063f81a4e853d617ffec68", "observed_at": "2026-10-17T12:42:03.061033+00:00", "revision_id": "8a7c635b-e5e6-4255-b7d0-a330be9c4207", "published_at": null}, "locator": "/html/body/div/main/div[2]/div/article/div/p[1]", "claim_id": "c2bc2bea-abee-4979-ad31-5707cb94caf8", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.palisadegroup.com", "evidence_id": "b9bf4f11-a9fa-48c0-810a-014145292fd7", "valid_until": null, "assertion_id": "0371de51-e938-42ab-8777-24d0539e71b0", "temporal_expression": "", "extraction_confidence": 0.9}, "owner": {"value": "Palisade Investment Partners reached an agreement to acquire a 100% interest from CIP through Intera Renewables; the article does not report that the acquisition was completed.", "rights": "facts_only", "source": {"url": "https://www.palisadegroup.com/palisade-signs-transaction-to-acquire-second-large-scale-battery-through-intera-renewables/", "name": "www.palisadegroup.com", "origin": "live", "checksum": "b64e7154292b3c9e2928aac341d351221189ece4dd063f81a4e853d617ffec68", "observed_at": "2026-10-17T12:42:03.061033+00:00", "revision_id": "8a7c635b-e5e6-4255-b7d0-a330be9c4207", "published_at": null}, "locator": "/html/body/div/main/div[2]/div/article/div/div[1]/text-position:9", "claim_id": "fbfc36c4-2afb-487b-a016-2e70bdc6c0e7", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "www.palisadegroup.com", "evidence_id": "5defba1c-a93c-47e4-af73-72f173665191", "valid_until": null, "assertion_id": "2b0e5f7d-bcc5-4d92-9ade-a8cec88de856", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "Battery energy storage system rated at 240 MWac / 960 MWh.", "rights": "facts_only", "source": {"url": "https://www.palisadegroup.com/palisade-signs-transaction-to-acquire-second-large-scale-battery-through-intera-renewables/", "name": "www.palisadegroup.com", "origin": "live", "checksum": "b64e7154292b3c9e2928aac341d351221189ece4dd063f81a4e853d617ffec68", "observed_at": "2026-10-17T12:42:03.061033+00:00", "revision_id": "8a7c635b-e5e6-4255-b7d0-a330be9c4207", "published_at": null}, "locator": "/html/body/div/main/div[2]/div/article/div/p[2]", "claim_id": "ed5a2ccb-0c2f-4718-853e-397a131729ca", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.palisadegroup.com", "evidence_id": "55de4d6d-d111-4965-be5e-8c78677b500b", "valid_until": null, "assertion_id": "8f766c0b-28f0-4ef9-97dc-b5b4716b50ac", "temporal_expression": "", "extraction_confidence": 0.9}, "sector": {"value": "Energy storage.", "rights": "facts_only", "source": {"url": "https://www.palisadegroup.com/palisade-signs-transaction-to-acquire-second-large-scale-battery-through-intera-renewables/", "name": "www.palisadegroup.com", "origin": "live", "checksum": "b64e7154292b3c9e2928aac341d351221189ece4dd063f81a4e853d617ffec68", "observed_at": "2026-10-17T12:42:03.061033+00:00", "revision_id": "8a7c635b-e5e6-4255-b7d0-a330be9c4207", "published_at": null}, "locator": "/html/body/div/main/div[2]/div/article/div/p[2]", "claim_id": "05523636-d6bf-4218-90ac-1aed450e4b0d", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.palisadegroup.com", "evidence_id": "55de4d6d-d111-4965-be5e-8c78677b500b", "valid_until": null, "assertion_id": "abba125d-0b5e-4fd3-bd9d-fd0cf6d0ad0b", "temporal_expression": "", "extraction_confidence": 0.9}, "activity": {"value": "Construction commenced in February 2025.", "rights": "facts_only", "source": {"url": "https://www.palisadegroup.com/palisade-signs-transaction-to-acquire-second-large-scale-battery-through-intera-renewables/", "name": "www.palisadegroup.com", "origin": "live", "checksum": "b64e7154292b3c9e2928aac341d351221189ece4dd063f81a4e853d617ffec68", "observed_at": "2026-10-17T12:42:03.061033+00:00", "revision_id": "8a7c635b-e5e6-4255-b7d0-a330be9c4207", "published_at": null}, "locator": "/html/body/div/main/div[2]/div/article/div/p[2]", "claim_id": "aa8a074e-8e04-4a39-861f-f7319e587669", "modality": "actual", "confidence": 0.9, "valid_from": null, "attribution": "www.palisadegroup.com", "evidence_id": "55de4d6d-d111-4965-be5e-8c78677b500b", "valid_until": null, "assertion_id": "7561f2e9-b5eb-4ca8-a7c7-1ad7125e98db", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Approximately 50 km east of Adelaide, South Australia, Australia.", "rights": "facts_only", "source": {"url": "https://www.palisadegroup.com/palisade-signs-transaction-to-acquire-second-large-scale-battery-through-intera-renewables/", "name": "www.palisadegroup.com", "origin": "live", "checksum": "b64e7154292b3c9e2928aac341d351221189ece4dd063f81a4e853d617ffec68", "observed_at": "2026-10-17T12:42:03.061033+00:00", "revision_id": "8a7c635b-e5e6-4255-b7d0-a330be9c4207", "published_at": null}, "locator": "/html/body/div/main/div[2]/div/article/div/p[2]", "claim_id": "c72050b8-2c79-46dc-af45-42c56bb9a725", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.palisadegroup.com", "evidence_id": "55de4d6d-d111-4965-be5e-8c78677b500b", "valid_until": null, "assertion_id": "a2611ee2-7495-4315-84b4-2ed7ca06b9e4", "temporal_expression": "", "extraction_confidence": 0.9}, "developer": {"value": "Copenhagen Infrastructure Partners (CIP) developed the project.", "rights": "facts_only", "source": {"url": "https://www.palisadegroup.com/palisade-signs-transaction-to-acquire-second-large-scale-battery-through-intera-renewables/", "name": "www.palisadegroup.com", "origin": "live", "checksum": "b64e7154292b3c9e2928aac341d351221189ece4dd063f81a4e853d617ffec68", "observed_at": "2026-10-17T12:42:03.061033+00:00", "revision_id": "8a7c635b-e5e6-4255-b7d0-a330be9c4207", "published_at": null}, "locator": "/html/body/div/main/div[2]/div/article/div/p[2]", "claim_id": "c88cda56-b32c-4210-8fd7-ef6b56666e83", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.palisadegroup.com", "evidence_id": "55de4d6d-d111-4965-be5e-8c78677b500b", "valid_until": null, "assertion_id": "985251ff-b3bc-46fc-9e05-dfb2f183016d", "temporal_expression": "", "extraction_confidence": 0.9}, "next_milestone": {"value": "Commercial operations were scheduled to commence in late 2026.", "rights": "facts_only", "source": {"url": "https://www.palisadegroup.com/palisade-signs-transaction-to-acquire-second-large-scale-battery-through-intera-renewables/", "name": "www.palisadegroup.com", "origin": "live", "checksum": "b64e7154292b3c9e2928aac341d351221189ece4dd063f81a4e853d617ffec68", "observed_at": "2026-10-17T12:42:03.061033+00:00", "revision_id": "8a7c635b-e5e6-4255-b7d0-a330be9c4207", "published_at": null}, "locator": "/html/body/div/main/div[2]/div/article/div/p[2]", "claim_id": "e9e414d0-df0d-4910-a128-8a06819b4f34", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "www.palisadegroup.com", "evidence_id": "55de4d6d-d111-4965-be5e-8c78677b500b", "valid_until": null, "assertion_id": "51583c3f-03ae-42f2-908e-9091b7ed9dc7", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "2f927377-6958-44b3-8a3a-2741f30fa313", "publication": {"local_only": false, "reviewed_at": "2026-10-17T12:57:39.927355+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "Summerfield BESS is a 240 MWac / 960 MWh battery energy storage project approximately 50 km east of Adelaide, South Australia. Construction commenced in February 2025. The announcement dated 13 April 2026 reports that Palisade had agreed to acquire a 100% interest from CIP through Intera, but does not report completion. It describes the project as partway through construction, while a quoted CIP statement says construction was substantially complete. Commercial operations were scheduled for late 2026.", "schema_version": "1.0", "public_unknowns": ["The supplied announcement, dated 13 April 2026, does not establish whether the acquisition subsequently closed or provide a later construction or operations update. It does not state procurement or tender status, project budget, EPC, or equipment suppliers."], "evidence_observed_at": "2026-10-17T12:42:03.061033+00:00", "knowledge_reviewed_at": "2026-10-17T12:56:11.056828+00:00", "decisive_evidence_observed_at": "2026-10-17T12:42:03.061033+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Summerfield Battery Energy Storage System (Summerfield BESS).", "original_project_title": "Summerfield Battery Energy Storage System (Summerfield BESS).", "canonical_url": "https://capexcue.com/projects/summerfield-battery-energy-storage-system-summerfield-bess-15d21973-adf/", "release": {"id": "c19dbce0-468c-41da-b67b-5f0da6735826", "number": 1, "published_at": "2026-10-17T12:58:31.033964+00:00"}, "release_reference": "release 1 (c19dbce0-468c-41da-b67b-5f0da6735826)", "current_dossier_url": "https://capexcue.com/projects/summerfield-battery-energy-storage-system-summerfield-bess-15d21973-adf/", "citation": "CapexCue \u2014 Summerfield Battery Energy Storage System (Summerfield BESS). \u2014 dossier released 2026-10-17T12:58:31.033964+00:00, release 1 (c19dbce0-468c-41da-b67b-5f0da6735826) \u2014 https://capexcue.com/projects/summerfield-battery-energy-storage-system-summerfield-bess-15d21973-adf/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "metadata_assessment", "value": "energy", "support": {"end": 15, "start": 0, "sources": [{"url": "https://www.palisadegroup.com/palisade-signs-transaction-to-acquire-second-large-scale-battery-through-intera-renewables/", "name": "www.palisadegroup.com", "origin": "live", "checksum": "b64e7154292b3c9e2928aac341d351221189ece4dd063f81a4e853d617ffec68", "observed_at": "2026-10-17T12:42:03.061033+00:00", "revision_id": "8a7c635b-e5e6-4255-b7d0-a330be9c4207", "published_at": null}], "modality": "reported", "predicate": "sector", "raw_value": "Energy storage.", "statement": "Energy storage.", "qualifications": {"attribution": "www.palisadegroup.com"}}, "label": "Energy", "icon": "energy"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "metadata_assessment", "value": "energy", "support": {"end": 15, "start": 0, "sources": [{"url": "https://www.palisadegroup.com/palisade-signs-transaction-to-acquire-second-large-scale-battery-through-intera-renewables/", "name": "www.palisadegroup.com", "origin": "live", "checksum": "b64e7154292b3c9e2928aac341d351221189ece4dd063f81a4e853d617ffec68", "observed_at": "2026-10-17T12:42:03.061033+00:00", "revision_id": "8a7c635b-e5e6-4255-b7d0-a330be9c4207", "published_at": null}], "modality": "reported", "predicate": "sector", "raw_value": "Energy storage.", "statement": "Energy storage.", "qualifications": {"attribution": "www.palisadegroup.com"}}}, "input_hash": "ccb3c6adf88ef85a8c5455fc522cc243b40bc30b0872654d49e4c9d8ae98bdc3", "release_id": "c19dbce0-468c-41da-b67b-5f0da6735826", "type_codes": ["battery_storage"], "field_states": {"type": {"state": "accepted", "reason": "supported_physical_components"}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "supported_physical_country"}, "category": {"state": "accepted", "reason": "supported_primary_category"}}, "region_codes": ["oceania"], "release_hash": "8bcc46c762af60d718af062b720fb27d4f95dff90ffae03886b9449be8b1bc20", "assessment_id": "8e00e6c2-8a09-41c9-a5fc-8787a656e6d4", "country_codes": ["AU"], "assessment_hash": "4ca7992479628af7fdc0a51dca7f92f8820eb8a46567fd01e08283aff680dd6c", "country_label": "Australia", "region_label": "Oceania", "type_labels": ["Battery Storage"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}