# Eastern North Dakota Alternate Water Supply Project; the body also refers to it as the Eastern North Dakota Water Supply Project.

Publisher: CapexCue
Canonical dossier: <https://capexcue.com/projects/eastern-north-dakota-alternate-water-supply-project-the-body-also-refers-to-it-as-the-eastern-north-dakota-water-supply-proje-970ac047f98bdf1e/>
Dossier reference: release 1 (c7a85d15-063a-412c-b8ed-ae0976ce7bab)

Released project intelligence

Oldest supporting observation: 2026-10-02T13:34:55.307187+00:00
Dossier released: 2026-10-15T16:44:01.759960+00:00
Source report dates and capture dates are listed per fact below; neither establishes an event date.

## Project summary

Reclamation’s page reports that its Jan. 15, 2021 record of decision selected an alternative for the project. The described plan is phased: Phase 1 includes a McClusky Canal intake, pump station, biota water treatment plant, and buried pipelines; Phase 2 adds infrastructure for Missouri River water. The stated limit is up to 165 cfs from each source, but no more than 165 cfs combined. Water is planned to pass through treatment before delivery to the state-led Red River Valley Water Supply Project. The page labels itself “Last Updated” 4/3/25; that label does not establish current construction or operating status.

## Evidence limits and unknowns

- Construction start, completion, operating dates, and current project status are not reported; the page describes planned infrastructure and records the 2021 decision, not implementation progress.
- The route is described as northern, but no precise pipeline alignment or facility sites are given.
- The reviewed project text does not state a budget, funding arrangement, contractor, procurement process, or procurement package. It says a repayment contract and permits will be issued but gives no issuance status or date.
- Linked EIS volumes and the record of decision are listed but are not assessed in this summary. The page’s 4/3/25 update label is not identified as a publication date or project milestone.

Current purchasing availability: unknown.
Source-dated plans do not establish current progress or available supplier packages.

## Project metadata

Country: United States
Region: North America
Physical assets: Drinking Water
Derived from the exact released evidence; unresolved fields remain unclassified.

## Project category

Water and environment
Derived from the reviewed scope statement; delivery stage remains unclassified.
The selected alternative describes infrastructure using existing Garrison Diversion Unit facilities. Phase 1 includes a McClusky Canal intake, pump station, biota water treatment plant, and buried pipelines. Phase 2 includes infrastructure for Missouri River water. The stated capacity language is up to 165 cfs from the McClusky Canal and up to 165 cfs from the Missouri River, with a maximum total combination of 165 cfs.
Source: US Bureau of Reclamation screened government project narrative — https://www.usbr.gov/gp/dkao/nepa/endaws/index.html | published unknown | observed 2026-10-02T13:34:55.307187+00:00

Project overview
Oldest decisive evidence: 2026-10-02T13:34:55.307187+00:00
Newest evidence: 2026-10-02T13:34:55.307187+00:00
Knowledge reviewed: 2026-10-15T16:44:01.394333+00:00
Publication reviewed: 2026-10-15T16:44:01.394333+00:00

## Name
Eastern North Dakota Alternate Water Supply Project; the body also refers to it as the Eastern North Dakota Water Supply Project.
Status: reported
Attribution: US Bureau of Reclamation own-government project narrative
Source: US Bureau of Reclamation screened government project narrative — https://www.usbr.gov/gp/dkao/nepa/endaws/index.html | published unknown | observed 2026-10-02T13:34:55.307187+00:00

## Scope
The selected alternative describes infrastructure using existing Garrison Diversion Unit facilities. Phase 1 includes a McClusky Canal intake, pump station, biota water treatment plant, and buried pipelines. Phase 2 includes infrastructure for Missouri River water. The stated capacity language is up to 165 cfs from the McClusky Canal and up to 165 cfs from the Missouri River, with a maximum total combination of 165 cfs.
Status: planned
Attribution: US Bureau of Reclamation own-government project narrative
Source: US Bureau of Reclamation screened government project narrative — https://www.usbr.gov/gp/dkao/nepa/endaws/index.html | published unknown | observed 2026-10-02T13:34:55.307187+00:00

## Activity
The selected alternative involves construction of water-supply infrastructure. The page does not report whether construction has begun or been completed.
Status: planned
Attribution: US Bureau of Reclamation own-government project narrative
Source: US Bureau of Reclamation screened government project narrative — https://www.usbr.gov/gp/dkao/nepa/endaws/index.html | published unknown | observed 2026-10-02T13:34:55.307187+00:00

## Delivery
Designed to deliver a bulk water supply for municipal and rural water needs in central and eastern North Dakota. The page says water will pass through a biota water treatment plant before delivery to the state Red River Valley Water Supply Project. A commissioner is quoted describing the intended supply as reliable and affordable for farmers, ranchers, and families in half of North Dakota.
Status: planned
Attribution: US Bureau of Reclamation own-government project narrative
Source: US Bureau of Reclamation screened government project narrative — https://www.usbr.gov/gp/dkao/nepa/endaws/index.html | published unknown | observed 2026-10-02T13:34:55.307187+00:00

## Location
The project is identified with eastern North Dakota, and its stated purpose is to serve municipal and rural water needs in central and eastern North Dakota. The page describes a northern pipeline route but gives no precise alignment. It identifies the McClusky Canal and Missouri River as water sources.
Status: reported
Attribution: US Bureau of Reclamation own-government project narrative
Source: US Bureau of Reclamation screened government project narrative — https://www.usbr.gov/gp/dkao/nepa/endaws/index.html | published unknown | observed 2026-10-02T13:34:55.307187+00:00

## Regulatory
The final environmental impact statement was released Dec. 4, 2020. Reclamation signed a record of decision Jan. 15, 2021, selecting the preferred alternative; the page says that signing completed the National Environmental Policy Act requirements. A heading names a draft EIS public meeting dated June 18, 2020, but the supplied text does not establish whether it was held. Reclamation says it will issue a repayment contract for McClusky Canal water use and other permits to construct and maintain facilities on its right of way; their issuance and dates are not reported.
Status: reported
Attribution: US Bureau of Reclamation own-government project narrative
Source: US Bureau of Reclamation screened government project narrative — https://www.usbr.gov/gp/dkao/nepa/endaws/index.html | published unknown | observed 2026-10-02T13:34:55.307187+00:00


## Cite this dossier

CapexCue — Eastern North Dakota Alternate Water Supply Project; the body also refers to it as the Eastern North Dakota Water Supply Project. — dossier released 2026-10-15T16:44:01.759960+00:00, release 1 (c7a85d15-063a-412c-b8ed-ae0976ce7bab) — https://capexcue.com/projects/eastern-north-dakota-alternate-water-supply-project-the-body-also-refers-to-it-as-the-eastern-north-dakota-water-supply-proje-970ac047f98bdf1e/.

For current information and later dossier updates, visit <https://capexcue.com/projects/eastern-north-dakota-alternate-water-supply-project-the-body-also-refers-to-it-as-the-eastern-north-dakota-water-supply-proje-970ac047f98bdf1e/>.
This file records the release identified above; the current dossier may change.