{"name": "Lighthouse Green Fuels Project", "slug": "lighthouse-green-fuels-project-379ecd19ae13b094", "as_of": "2026-10-01T06:51:42.016592+00:00", "depth": "basic", "facts": {"name": {"value": "Lighthouse Green Fuels Project", "rights": "facts_only", "source": {"url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN0110025", "name": "Planning Inspectorate", "origin": "live", "checksum": "046ee3b967798d203ad4f93400e9762046e2e72d16b6408437ac1e1da5558f3e", "observed_at": "2026-10-01T02:15:46.856664+00:00", "revision_id": "2e051776-84cc-4a96-b3d0-3bb6c811b200", "published_at": null}, "locator": "/html/head/title", "claim_id": "f4ec8be9-d4df-4ce5-9479-1dc509291d26", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "Planning Inspectorate", "evidence_id": "b1cbca23-7c6a-4bca-ab89-8fa39c7b0bdc", "valid_until": null, "assertion_id": "061e54b2-4365-4dbc-b48d-68e078c39930", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "The described development comprises the SAF production, pre-treatment, processing and storage plant; marine infrastructure and pipelines for exporting finished product to marine or rail loading infrastructure; a biomass-fired CHP plant with electrical output up to approximately 200 MWe and additional steam production; utility pipelines, wastewater treatment and discharge, an electricity connection, an air separation unit, bulk storage for feedstock, intermediates and product, and associated and ancillary infrastructure.", "rights": "facts_only", "source": {"url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN0110025", "name": "Planning Inspectorate", "origin": "live", "checksum": "046ee3b967798d203ad4f93400e9762046e2e72d16b6408437ac1e1da5558f3e", "observed_at": "2026-10-01T02:15:46.856664+00:00", "revision_id": "2e051776-84cc-4a96-b3d0-3bb6c811b200", "published_at": null}, "locator": "/html/body/div[2]/main/div/div[2]/section[2]/p[3]", "claim_id": "a2da8964-7cca-49d8-9b6d-e96ec51689ec", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "Planning Inspectorate", "evidence_id": "35983942-7c5d-4672-8b3d-bcb13c1af520", "valid_until": null, "assertion_id": "3acbdd36-a700-45d6-831c-28d276b474b4", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "The project land is described as being in the boroughs of Stockton-on-Tees and Redcar and Cleveland, Teesside. The proposed Main Site is on the north bank of the River Tees, south of Seal Sands Road. The page says displayed boundaries are illustrative and points to the latest relevant plans and drawings for exact boundaries.", "rights": "facts_only", "source": {"url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN0110025", "name": "Planning Inspectorate", "origin": "live", "checksum": "046ee3b967798d203ad4f93400e9762046e2e72d16b6408437ac1e1da5558f3e", "observed_at": "2026-10-01T02:15:46.856664+00:00", "revision_id": "2e051776-84cc-4a96-b3d0-3bb6c811b200", "published_at": null}, "locator": "/html/body/div[2]/main/div/div[2]/p[1]", "claim_id": "66db3281-fae1-4530-b96e-88979111b17f", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "Planning Inspectorate", "evidence_id": "add61176-6020-4e33-8bc3-c222eeb97be3", "valid_until": null, "assertion_id": "99b4a812-ba0d-4d3f-9e73-707cf75dc5f2", "temporal_expression": "", "extraction_confidence": 0.9}, "developer": {"value": "The supplied text does not identify the developer. It contains a link labelled \u201cView the developer's website,\u201d but the linked page was not acquired or interpreted.", "rights": "facts_only", "source": {"url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN0110025", "name": "Planning Inspectorate", "origin": "live", "checksum": "046ee3b967798d203ad4f93400e9762046e2e72d16b6408437ac1e1da5558f3e", "observed_at": "2026-10-01T02:15:46.856664+00:00", "revision_id": "2e051776-84cc-4a96-b3d0-3bb6c811b200", "published_at": null}, "locator": "/html/body/div[2]/main/div/div[2]/section[2]/a/text-position:85", "claim_id": "060e1cfc-4cc6-4406-9e62-2e381c234545", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "Planning Inspectorate", "evidence_id": "fdfc483d-4bbc-44ba-a7c6-5a27916ae728", "valid_until": null, "assertion_id": "a3eac999-6252-4af1-bf79-5ff51d248529", "temporal_expression": "", "extraction_confidence": 0.9}, "regulatory": {"value": "The page identifies the application type as \u201cGenerating Stations.\u201d It reports that the application was received on 21 September 2026 and that the project was at the acceptance stage as of the latest update. Comments were not available at that stage; receipt of the application does not mean it had been accepted for examination.", "rights": "facts_only", "source": {"url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN0110025", "name": "Planning Inspectorate", "origin": "live", "checksum": "046ee3b967798d203ad4f93400e9762046e2e72d16b6408437ac1e1da5558f3e", "observed_at": "2026-10-01T02:15:46.856664+00:00", "revision_id": "2e051776-84cc-4a96-b3d0-3bb6c811b200", "published_at": null}, "locator": "/html/body/div[2]/main/div/div[2]/section[2]/p[1]", "claim_id": "d0c89c32-4ab5-4dd4-941b-1e35a87cc08d", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "Planning Inspectorate", "evidence_id": "8c80ecef-7af4-4901-9fd3-85636f366659", "valid_until": null, "assertion_id": "5caddf17-482c-463c-ab6b-2618d3ce8969", "temporal_expression": "", "extraction_confidence": 0.9}, "next_milestone": {"value": "A decision on whether to accept the application for examination was due by 19 October 2026. This is a stated deadline, not evidence that the application was accepted.", "rights": "facts_only", "source": {"url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN0110025", "name": "Planning Inspectorate", "origin": "live", "checksum": "046ee3b967798d203ad4f93400e9762046e2e72d16b6408437ac1e1da5558f3e", "observed_at": "2026-10-01T02:15:46.856664+00:00", "revision_id": "2e051776-84cc-4a96-b3d0-3bb6c811b200", "published_at": null}, "locator": "/html/body/div[2]/main/div/div[2]/section[3]/p[2]", "claim_id": "3e572e0a-b46a-4363-9e6f-8383489c6e81", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "Planning Inspectorate", "evidence_id": "4a3d8faf-550e-4ec9-ac40-9a84034ecc3b", "valid_until": null, "assertion_id": "48cc4db8-1465-4d25-97d9-65e6b25946ff", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "3165ffc8-e9cb-49b6-9eb2-65db93aa9177", "publication": {"local_only": false, "reviewed_at": "2026-10-15T16:08:37.090467+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "The Lighthouse Green Fuels Project is a proposed SAF production development with processing, storage, export and utility infrastructure. Its described scope includes a biomass-fired CHP plant with electrical output up to approximately 200 MWe and additional steam for SAF production. The proposed Main Site is on the north bank of the River Tees, south of Seal Sands Road, in Stockton-on-Tees and Redcar and Cleveland, Teesside. The displayed boundaries are illustrative; the page directs readers to relevant plans and drawings for exact boundaries.\n\nThe Planning Inspectorate\u2019s update dated 30 September 2026 says the application had been received on 21 September and was at the acceptance stage. A decision on acceptance was due by 19 October 2026; the page does not confirm that it was accepted. Comments were not available at that stage. The page names LGF Projects Limited as applicant, but does not identify it as the developer; it includes a link labelled as the developer\u2019s website.", "schema_version": "1.0", "public_unknowns": ["The supplied page does not report the outcome of the acceptance decision; the stated 19 October 2026 deadline is not confirmation of acceptance.", "Exact project boundaries are not established in the supplied text; the page describes displayed boundaries as illustrative and refers readers to relevant plans and drawings.", "The developer\u2019s identity is not established by the supplied text. It identifies LGF Projects Limited as applicant and includes a developer-website link, but the linked page was not acquired or interpreted.", "Financing, procurement arrangements, contract packages and purchasing timing are not stated in the project-information content supplied.", "The supplied text does not expressly state the country."], "evidence_observed_at": "2026-10-01T02:15:46.856664+00:00", "knowledge_reviewed_at": "2026-10-15T16:08:37.090467+00:00", "decisive_evidence_observed_at": "2026-10-01T02:15:46.856664+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Lighthouse Green Fuels Project", "original_project_title": "Lighthouse Green Fuels Project", "canonical_url": "https://capexcue.com/projects/lighthouse-green-fuels-project-379ecd19ae13b094/", "release": {"id": "9daab6af-3628-4f14-a38e-b1f351660cd0", "number": 1, "published_at": "2026-10-15T16:08:37.342764+00:00"}, "release_reference": "release 1 (9daab6af-3628-4f14-a38e-b1f351660cd0)", "current_dossier_url": "https://capexcue.com/projects/lighthouse-green-fuels-project-379ecd19ae13b094/", "citation": "CapexCue \u2014 Lighthouse Green Fuels Project \u2014 dossier released 2026-10-15T16:08:37.342764+00:00, release 1 (9daab6af-3628-4f14-a38e-b1f351660cd0) \u2014 https://capexcue.com/projects/lighthouse-green-fuels-project-379ecd19ae13b094/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 525, "start": 0, "sources": [{"url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN0110025", "name": "Planning Inspectorate", "origin": "live", "checksum": "046ee3b967798d203ad4f93400e9762046e2e72d16b6408437ac1e1da5558f3e", "observed_at": "2026-10-01T02:15:46.856664+00:00", "revision_id": "2e051776-84cc-4a96-b3d0-3bb6c811b200", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "The described development comprises the SAF production, pre-treatment, processing and storage plant; marine infrastructure and pipelines for exporting finished product to marine or rail loading infrastructure; a biomass-fired CHP plant with electrical output up to approximately 200 MWe and additional steam production; utility pipelines, wastewater treatment and discharge, an electricity connection, an air separation unit, bulk storage for feedstock, intermediates and product, and associated and ancillary infrastructure.", "statement": "The described development comprises the SAF production, pre-treatment, processing and storage plant; marine infrastructure and pipelines for exporting finished product to marine or rail loading infrastructure; a biomass-fired CHP plant with electrical output up to approximately 200 MWe and additional steam production; utility pipelines, wastewater treatment and discharge, an electricity connection, an air separation unit, bulk storage for feedstock, intermediates and product, and associated and ancillary infrastructure.", "qualifications": {"attribution": "Planning Inspectorate"}}, "label": "Energy", "icon": "energy"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 525, "start": 0, "sources": [{"url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN0110025", "name": "Planning Inspectorate", "origin": "live", "checksum": "046ee3b967798d203ad4f93400e9762046e2e72d16b6408437ac1e1da5558f3e", "observed_at": "2026-10-01T02:15:46.856664+00:00", "revision_id": "2e051776-84cc-4a96-b3d0-3bb6c811b200", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "The described development comprises the SAF production, pre-treatment, processing and storage plant; marine infrastructure and pipelines for exporting finished product to marine or rail loading infrastructure; a biomass-fired CHP plant with electrical output up to approximately 200 MWe and additional steam production; utility pipelines, wastewater treatment and discharge, an electricity connection, an air separation unit, bulk storage for feedstock, intermediates and product, and associated and ancillary infrastructure.", "statement": "The described development comprises the SAF production, pre-treatment, processing and storage plant; marine infrastructure and pipelines for exporting finished product to marine or rail loading infrastructure; a biomass-fired CHP plant with electrical output up to approximately 200 MWe and additional steam production; utility pipelines, wastewater treatment and discharge, an electricity connection, an air separation unit, bulk storage for feedstock, intermediates and product, and associated and ancillary infrastructure.", "qualifications": {"attribution": "Planning Inspectorate"}}}, "input_hash": "239bf5995d5555518e0ad1817f73638a65fc465a669e9f84a0b59ee5fea3d7e0", "release_id": "9daab6af-3628-4f14-a38e-b1f351660cd0", "type_codes": [], "field_states": {"type": {"state": "unknown_after_assessment", "reason": "Teesside is in the United Kingdom; sustainable aviation fuel and biomass CHP are energy assets, but neither has a registered type."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "Teesside is in the United Kingdom; sustainable aviation fuel and biomass CHP are energy assets, but neither has a registered type."}, "category": {"state": "accepted", "reason": "Teesside is in the United Kingdom; sustainable aviation fuel and biomass CHP are energy assets, but neither has a registered type."}}, "region_codes": ["europe"], "release_hash": "e5e5ef4964c5a037d42fb41323438872a7cb4dc6f2b0b7624428fd5213dea4c8", "assessment_id": "0c3b6e27-4709-48fc-85fe-1e9e20874f5d", "country_codes": ["GB"], "assessment_hash": "9c8982d101ad8b711eb6c6d922986102abf1c301d63fd325463117ecc961aaa8", "country_label": "United Kingdom", "region_label": "Europe", "type_labels": []}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}