{"name": "Visby waterworks upgrades (reconstruction of Visby waterworks).", "slug": "visby-waterworks-upgrades-reconstruction-of-visby-waterworks-456058f6-f7b", "as_of": "2026-10-19T05:18:17.872075+00:00", "depth": "basic", "facts": {"name": {"value": "Visby waterworks upgrades (reconstruction of Visby waterworks).", "rights": "facts_only", "source": {"url": "https://www.skanska.com/group/sv/media/pressmeddelanden/2026/skanska-bygger-om-visby-vattenverk-for-cirka-400-miljoner-kronor", "name": "www.skanska.com", "origin": "live", "checksum": "4c67e0a8cb8392b172c3090626dae63f675046fee3de2d006350eb6cccc710a6", "observed_at": "2026-10-19T05:13:37.609252+00:00", "revision_id": "b2dffc8a-b244-4b9d-86b3-e56bfaecca1b", "published_at": null}, "locator": "/html/body/div[2]/main/div[1]/div[2]/div[1]/h1", "claim_id": "89cab411-5c74-4e08-af50-356aefaf9246", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.skanska.com", "evidence_id": "03d72d7f-7e33-47e1-b168-640981b48ee3", "valid_until": null, "assertion_id": "0bbe13ca-25f8-4643-9fd8-cf9e5d567730", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "At Visby southern waterworks: demolition of existing buildings and extension and new construction of a process hall and distribution building. At Visby northern waterworks: new construction and commissioning of a process building, plus renovation and commissioning of the existing ozone plant.", "rights": "facts_only", "source": {"url": "https://www.skanska.com/group/sv/media/pressmeddelanden/2026/skanska-bygger-om-visby-vattenverk-for-cirka-400-miljoner-kronor", "name": "www.skanska.com", "origin": "live", "checksum": "4c67e0a8cb8392b172c3090626dae63f675046fee3de2d006350eb6cccc710a6", "observed_at": "2026-10-19T05:13:37.609252+00:00", "revision_id": "b2dffc8a-b244-4b9d-86b3-e56bfaecca1b", "published_at": null}, "locator": "/html/body/div[2]/main/div[2]/div[1]/div[1]/p[1]", "claim_id": "2f7fd23a-5966-4f70-a387-2e00b2b2a050", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "www.skanska.com", "evidence_id": "1135f611-3be5-4628-b31e-25af8d8a7e15", "valid_until": null, "assertion_id": "0b5493b0-5612-418b-80e3-cb5620f4949d", "temporal_expression": "", "extraction_confidence": 0.9}, "finance": {"value": "Total contract value is approximately 400 million kronor; this is stated as contract value, not total project financing.", "rights": "facts_only", "source": {"url": "https://www.skanska.com/group/sv/media/pressmeddelanden/2026/skanska-bygger-om-visby-vattenverk-for-cirka-400-miljoner-kronor", "name": "www.skanska.com", "origin": "live", "checksum": "4c67e0a8cb8392b172c3090626dae63f675046fee3de2d006350eb6cccc710a6", "observed_at": "2026-10-19T05:13:37.609252+00:00", "revision_id": "b2dffc8a-b244-4b9d-86b3-e56bfaecca1b", "published_at": null}, "locator": "/html/body/div[2]/main/div[1]/div[2]/div[1]/h1", "claim_id": "6476fa1c-575c-49d6-8878-f4b3dfc418dd", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.skanska.com", "evidence_id": "03d72d7f-7e33-47e1-b168-640981b48ee3", "valid_until": null, "assertion_id": "01d38641-7226-4e07-ac38-be1f89e2fa19", "temporal_expression": "", "extraction_confidence": 0.9}, "activity": {"value": "The measures are described as a long-term investment intended to strengthen drinking-water production capacity, security and quality, and provide greater system flexibility for future needs and challenges.", "rights": "facts_only", "source": {"url": "https://www.skanska.com/group/sv/media/pressmeddelanden/2026/skanska-bygger-om-visby-vattenverk-for-cirka-400-miljoner-kronor", "name": "www.skanska.com", "origin": "live", "checksum": "4c67e0a8cb8392b172c3090626dae63f675046fee3de2d006350eb6cccc710a6", "observed_at": "2026-10-19T05:13:37.609252+00:00", "revision_id": "b2dffc8a-b244-4b9d-86b3-e56bfaecca1b", "published_at": null}, "locator": "/html/body/div[2]/main/div[2]/div[1]/div[1]/p[2]", "claim_id": "637aa90a-98a8-42d4-b72a-b996fb8df9c9", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.skanska.com", "evidence_id": "f5d62e60-3660-478d-b694-fb41d6ccb82c", "valid_until": null, "assertion_id": "98f99588-82e3-4b73-baa4-ef81702c8f78", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Visby, Gotland; work at Visby southern waterworks and Visby northern waterworks.", "rights": "facts_only", "source": {"url": "https://www.skanska.com/group/sv/media/pressmeddelanden/2026/skanska-bygger-om-visby-vattenverk-for-cirka-400-miljoner-kronor", "name": "www.skanska.com", "origin": "live", "checksum": "4c67e0a8cb8392b172c3090626dae63f675046fee3de2d006350eb6cccc710a6", "observed_at": "2026-10-19T05:13:37.609252+00:00", "revision_id": "b2dffc8a-b244-4b9d-86b3-e56bfaecca1b", "published_at": null}, "locator": "/html/body/div[2]/main/div[2]/div[1]/div[1]/p[1]", "claim_id": "df1fba4c-c0d7-4848-b2e2-0769899eb66a", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.skanska.com", "evidence_id": "1135f611-3be5-4628-b31e-25af8d8a7e15", "valid_until": null, "assertion_id": "10135d31-9918-41a8-bced-42b01b7a1b4b", "temporal_expression": "", "extraction_confidence": 0.9}, "contractor": {"value": "Skanska; the source reports that it signed an agreement with Region Gotland to rebuild the waterworks.", "rights": "facts_only", "source": {"url": "https://www.skanska.com/group/sv/media/pressmeddelanden/2026/skanska-bygger-om-visby-vattenverk-for-cirka-400-miljoner-kronor", "name": "www.skanska.com", "origin": "live", "checksum": "4c67e0a8cb8392b172c3090626dae63f675046fee3de2d006350eb6cccc710a6", "observed_at": "2026-10-19T05:13:37.609252+00:00", "revision_id": "b2dffc8a-b244-4b9d-86b3-e56bfaecca1b", "published_at": null}, "locator": "/html/body/div[2]/main/div[1]/div[2]/div[2]/p", "claim_id": "55dda166-903a-4b26-b86a-6962e9b85acd", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.skanska.com", "evidence_id": "f5f8f067-90f7-44aa-842c-8a8b9bcb4121", "valid_until": null, "assertion_id": "b9accb5c-c791-4b4b-b2e0-1f9941aa8428", "temporal_expression": "", "extraction_confidence": 0.9}, "procurement": {"value": "The existing design-phase (phase 1) contract was supplemented by an agreement for the production phase (phase 2); the project is being carried out in partnering with Region Gotland.", "rights": "facts_only", "source": {"url": "https://www.skanska.com/group/sv/media/pressmeddelanden/2026/skanska-bygger-om-visby-vattenverk-for-cirka-400-miljoner-kronor", "name": "www.skanska.com", "origin": "live", "checksum": "4c67e0a8cb8392b172c3090626dae63f675046fee3de2d006350eb6cccc710a6", "observed_at": "2026-10-19T05:13:37.609252+00:00", "revision_id": "b2dffc8a-b244-4b9d-86b3-e56bfaecca1b", "published_at": null}, "locator": "/html/body/div[2]/main/div[2]/div[1]/div[1]/p[1]", "claim_id": "f1a7f2f1-440b-45e5-babd-601ddf4508c1", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.skanska.com", "evidence_id": "1135f611-3be5-4628-b31e-25af8d8a7e15", "valid_until": null, "assertion_id": "bedc38c5-9610-4e04-a30c-7f9bee02526e", "temporal_expression": "", "extraction_confidence": 0.9}, "next_milestone": {"value": "The source estimates that work at Visby northern waterworks will continue until autumn 2026; work at Visby southern waterworks is expected to start in autumn 2026 and be completed in 2028.", "rights": "facts_only", "source": {"url": "https://www.skanska.com/group/sv/media/pressmeddelanden/2026/skanska-bygger-om-visby-vattenverk-for-cirka-400-miljoner-kronor", "name": "www.skanska.com", "origin": "live", "checksum": "4c67e0a8cb8392b172c3090626dae63f675046fee3de2d006350eb6cccc710a6", "observed_at": "2026-10-19T05:13:37.609252+00:00", "revision_id": "b2dffc8a-b244-4b9d-86b3-e56bfaecca1b", "published_at": null}, "locator": "/html/body/div[2]/main/div[2]/div[1]/div[1]/p[3]", "claim_id": "c8473b82-868c-4b65-ab27-a9cf28bef0ff", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "www.skanska.com", "evidence_id": "481d6521-1552-4be7-9d18-e57f8960d3e9", "valid_until": null, "assertion_id": "0fd9fd63-d861-4af2-beb1-881ec906e637", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "32a85bc3-123a-4fd6-8a55-2ddf7acfd39e", "publication": {"local_only": false, "reviewed_at": "2026-10-19T05:22:09.413671+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "Skanska reports an agreement with Region Gotland to rebuild the Visby waterworks. Planned work covers demolition and new or extended buildings at the southern site, and a new process building plus renovation and commissioning of the existing ozone plant at the northern site. The reported total contract value is approximately 400 million kronor; this is contract value, not stated project financing. The source describes the investment as intended to strengthen drinking-water production capacity, security and quality, and system flexibility. Skanska estimates northern-site work will continue until autumn 2026; southern-site work is expected to start in autumn 2026 and finish in 2028.", "schema_version": "1.0", "public_unknowns": ["The supplied article text does not show a publication date: its date label appears without a displayed date value.", "The source does not specify equipment packages, technical specifications, equipment suppliers or an equipment procurement timetable.", "The production-phase agreement is reported as in place, but the source does not establish whether any separate supplier opportunity remains open."], "evidence_observed_at": "2026-10-19T05:13:37.609252+00:00", "knowledge_reviewed_at": "2026-10-19T05:18:18.092064+00:00", "decisive_evidence_observed_at": "2026-10-19T05:13:37.609252+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Visby waterworks upgrades (reconstruction of Visby waterworks).", "original_project_title": "Visby waterworks upgrades (reconstruction of Visby waterworks).", "canonical_url": "https://capexcue.com/projects/visby-waterworks-upgrades-reconstruction-of-visby-waterworks-456058f6-f7b/", "release": {"id": "a5c95cd2-3f7c-4e53-bf21-a096cc70752d", "number": 1, "published_at": "2026-10-19T05:22:51.312714+00:00"}, "release_reference": "release 1 (a5c95cd2-3f7c-4e53-bf21-a096cc70752d)", "current_dossier_url": "https://capexcue.com/projects/visby-waterworks-upgrades-reconstruction-of-visby-waterworks-456058f6-f7b/", "citation": "CapexCue \u2014 Visby waterworks upgrades (reconstruction of Visby waterworks). \u2014 dossier released 2026-10-19T05:22:51.312714+00:00, release 1 (a5c95cd2-3f7c-4e53-bf21-a096cc70752d) \u2014 https://capexcue.com/projects/visby-waterworks-upgrades-reconstruction-of-visby-waterworks-456058f6-f7b/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "codex_retained_dossier_curation", "value": "water_environment", "support": {"end": 293, "start": 0, "sources": [{"url": "https://www.skanska.com/group/sv/media/pressmeddelanden/2026/skanska-bygger-om-visby-vattenverk-for-cirka-400-miljoner-kronor", "name": "www.skanska.com", "origin": "live", "checksum": "4c67e0a8cb8392b172c3090626dae63f675046fee3de2d006350eb6cccc710a6", "observed_at": "2026-10-19T05:13:37.609252+00:00", "revision_id": "b2dffc8a-b244-4b9d-86b3-e56bfaecca1b", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "At Visby southern waterworks: demolition of existing buildings and extension and new construction of a process hall and distribution building. At Visby northern waterworks: new construction and commissioning of a process building, plus renovation and commissioning of the existing ozone plant.", "statement": "At Visby southern waterworks: demolition of existing buildings and extension and new construction of a process hall and distribution building. At Visby northern waterworks: new construction and commissioning of a process building, plus renovation and commissioning of the existing ozone plant.", "qualifications": {"attribution": "www.skanska.com"}}, "label": "Water and environment", "icon": "water"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "codex_retained_dossier_curation", "value": "water_environment", "support": {"end": 293, "start": 0, "sources": [{"url": "https://www.skanska.com/group/sv/media/pressmeddelanden/2026/skanska-bygger-om-visby-vattenverk-for-cirka-400-miljoner-kronor", "name": "www.skanska.com", "origin": "live", "checksum": "4c67e0a8cb8392b172c3090626dae63f675046fee3de2d006350eb6cccc710a6", "observed_at": "2026-10-19T05:13:37.609252+00:00", "revision_id": "b2dffc8a-b244-4b9d-86b3-e56bfaecca1b", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "At Visby southern waterworks: demolition of existing buildings and extension and new construction of a process hall and distribution building. At Visby northern waterworks: new construction and commissioning of a process building, plus renovation and commissioning of the existing ozone plant.", "statement": "At Visby southern waterworks: demolition of existing buildings and extension and new construction of a process hall and distribution building. At Visby northern waterworks: new construction and commissioning of a process building, plus renovation and commissioning of the existing ozone plant.", "qualifications": {"attribution": "www.skanska.com"}}}, "input_hash": "c98395ca904d7b3a00e303dfee178857dc40506de53bbdd6f2825d85c6476413", "release_id": "a5c95cd2-3f7c-4e53-bf21-a096cc70752d", "type_codes": ["drinking_water"], "field_states": {"type": {"state": "accepted", "reason": "Visby, Gotland identifies Sweden; waterworks process/distribution and ozone-treatment upgrades are explicit."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "Visby, Gotland identifies Sweden; waterworks process/distribution and ozone-treatment upgrades are explicit."}, "category": {"state": "accepted", "reason": "Visby, Gotland identifies Sweden; waterworks process/distribution and ozone-treatment upgrades are explicit."}}, "region_codes": ["europe"], "release_hash": "cd5fb42cbc0b711d35d955c3ca97463c095efcc191b0c67248aca99b0ed94cd5", "assessment_id": "7bbf49e9-81ba-405f-858e-f77b77af95d4", "country_codes": ["SE"], "assessment_hash": "1855e2dee584a4178dbd53867fbbc3a8e63c5d9093002754b5362dfd3ac99f20", "country_label": "Sweden", "region_label": "Europe", "type_labels": ["Drinking Water"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}