{"name": "Chinchilla Battery", "slug": "chinchilla-battery-ab67aef7-2e3", "as_of": "2026-10-17T11:40:49.360148+00:00", "depth": "basic", "facts": {"date": {"value": "Began operating in the National Electricity Market in July 2024; the fast facts section states that operations commenced in 2024.", "rights": "facts_only", "source": {"url": "https://www.csenergy.com.au/what-we-do/firming-and-storage/chinchilla-battery", "name": "www.csenergy.com.au", "origin": "live", "checksum": "097378a9797993128abe6bc12d5e7a114db7c71de84c03247fe0f76ec185900f", "observed_at": "2026-10-17T10:42:00.937710+00:00", "revision_id": "c2d66bee-ab3b-4efc-b58c-235a8222bbb7", "published_at": null}, "locator": "/html/body/form/main/div[2]/div[2]/article[2]/ul/li[4]", "claim_id": "7bd1b352-e406-40ed-aa23-50ed0848c990", "modality": "actual", "confidence": 0.9, "valid_from": null, "attribution": "www.csenergy.com.au", "evidence_id": "f1767199-1aec-4a3d-b3ba-449864d34d4b", "valid_until": null, "assertion_id": "a8941388-b176-484f-b043-e7b4b7f1b6bf", "temporal_expression": "", "extraction_confidence": 0.9}, "name": {"value": "Chinchilla Battery", "rights": "facts_only", "source": {"url": "https://www.csenergy.com.au/what-we-do/firming-and-storage/chinchilla-battery", "name": "www.csenergy.com.au", "origin": "live", "checksum": "097378a9797993128abe6bc12d5e7a114db7c71de84c03247fe0f76ec185900f", "observed_at": "2026-10-17T10:42:00.937710+00:00", "revision_id": "c2d66bee-ab3b-4efc-b58c-235a8222bbb7", "published_at": null}, "locator": "/html/body/form/main/div[2]/div[2]/article[2]/h1", "claim_id": "836deb41-ffd6-452d-a32c-95d1c7695a11", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.csenergy.com.au", "evidence_id": "30c8a167-3cb3-46e7-a35b-abb7d3258b2f", "valid_until": null, "assertion_id": "e9bf2e0c-92e5-42ee-bfcf-04f88cce6d3d", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "Grid-scale battery with 100 MW discharge capacity and 200 MWh storage capacity, comprising 80 Tesla Megapack 2 systems.", "rights": "facts_only", "source": {"url": "https://www.csenergy.com.au/what-we-do/firming-and-storage/chinchilla-battery", "name": "www.csenergy.com.au", "origin": "live", "checksum": "097378a9797993128abe6bc12d5e7a114db7c71de84c03247fe0f76ec185900f", "observed_at": "2026-10-17T10:42:00.937710+00:00", "revision_id": "c2d66bee-ab3b-4efc-b58c-235a8222bbb7", "published_at": null}, "locator": "/html/body/form/main/div[2]/div[2]/article[2]/ul/li[1]", "claim_id": "32374456-f4b8-4860-9c41-ae326a3e0370", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.csenergy.com.au", "evidence_id": "6b216cf2-ecf5-402b-8e3b-b6d31a0bfbde", "valid_until": null, "assertion_id": "e911f0c3-af8e-451c-9b17-c908e00acb22", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "At CS Energy's Kogan Creek site, next to Kogan Creek Power Station, near Chinchilla in the Western Downs.", "rights": "facts_only", "source": {"url": "https://www.csenergy.com.au/what-we-do/firming-and-storage/chinchilla-battery", "name": "www.csenergy.com.au", "origin": "live", "checksum": "097378a9797993128abe6bc12d5e7a114db7c71de84c03247fe0f76ec185900f", "observed_at": "2026-10-17T10:42:00.937710+00:00", "revision_id": "c2d66bee-ab3b-4efc-b58c-235a8222bbb7", "published_at": null}, "locator": "/html/body/form/main/div[2]/div[2]/article[2]/p[2]", "claim_id": "bf0b592d-cdbc-4ebf-b865-1480a2e0fec8", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.csenergy.com.au", "evidence_id": "06c0757f-397b-45ae-8d11-563dbb208332", "valid_until": null, "assertion_id": "ef202613-2b80-4ba9-b4cf-d85d34874087", "temporal_expression": "", "extraction_confidence": 0.9}, "contractor": {"value": "CS Energy worked with Tesla and Downer to deliver the battery.", "rights": "facts_only", "source": {"url": "https://www.csenergy.com.au/what-we-do/firming-and-storage/chinchilla-battery", "name": "www.csenergy.com.au", "origin": "live", "checksum": "097378a9797993128abe6bc12d5e7a114db7c71de84c03247fe0f76ec185900f", "observed_at": "2026-10-17T10:42:00.937710+00:00", "revision_id": "c2d66bee-ab3b-4efc-b58c-235a8222bbb7", "published_at": null}, "locator": "/html/body/form/main/div[2]/div[2]/article[2]/p[5]", "claim_id": "20650e0c-2dbc-4304-8bbe-8e9979499c9f", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.csenergy.com.au", "evidence_id": "d60b350a-18d9-4d88-be26-52e26b933817", "valid_until": null, "assertion_id": "8383c81a-68d6-458c-8a0f-783eb5301deb", "temporal_expression": "", "extraction_confidence": 0.9}, "investment": {"value": "$150 million investment, including substation works.", "rights": "facts_only", "source": {"url": "https://www.csenergy.com.au/what-we-do/firming-and-storage/chinchilla-battery", "name": "www.csenergy.com.au", "origin": "live", "checksum": "097378a9797993128abe6bc12d5e7a114db7c71de84c03247fe0f76ec185900f", "observed_at": "2026-10-17T10:42:00.937710+00:00", "revision_id": "c2d66bee-ab3b-4efc-b58c-235a8222bbb7", "published_at": null}, "locator": "/html/body/form/main/div[2]/div[2]/article[2]/ul/li[3]", "claim_id": "ba096d6b-50d1-48c1-be7f-cdf3bae59285", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.csenergy.com.au", "evidence_id": "23687c08-19e0-4c2d-9144-737a12669a20", "valid_until": null, "assertion_id": "c4d581bb-e75b-45d9-a128-e48d5d114b49", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "35af2847-702a-4449-b8fd-5a287f6282e8", "publication": {"local_only": false, "reviewed_at": "2026-10-17T11:42:03.936877+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "Chinchilla Battery is an operating grid-scale battery at CS Energy\u2019s Kogan Creek site, next to Kogan Creek Power Station near Chinchilla in the Western Downs. The source reports 100 MW discharge capacity, 200 MWh storage capacity and 80 Tesla Megapack 2 systems. It describes a $150 million investment, including substation works, and says the battery began operating in the National Electricity Market in July 2024. CS Energy reports working with Tesla and Downer to deliver the project.", "schema_version": "1.0", "public_unknowns": ["The supplied project material does not state whether procurement is currently open, whether any supplier packages remain, or whether there is a future buying window."], "evidence_observed_at": "2026-10-17T10:42:00.937710+00:00", "knowledge_reviewed_at": "2026-10-17T11:40:49.737584+00:00", "decisive_evidence_observed_at": "2026-10-17T10:42:00.937710+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Chinchilla Battery", "original_project_title": "Chinchilla Battery", "canonical_url": "https://capexcue.com/projects/chinchilla-battery-ab67aef7-2e3/", "release": {"id": "03529b19-3f1e-44de-8bc1-4b5b5fd80a44", "number": 1, "published_at": "2026-10-17T11:42:18.230523+00:00"}, "release_reference": "release 1 (03529b19-3f1e-44de-8bc1-4b5b5fd80a44)", "current_dossier_url": "https://capexcue.com/projects/chinchilla-battery-ab67aef7-2e3/", "citation": "CapexCue \u2014 Chinchilla Battery \u2014 dossier released 2026-10-17T11:42:18.230523+00:00, release 1 (03529b19-3f1e-44de-8bc1-4b5b5fd80a44) \u2014 https://capexcue.com/projects/chinchilla-battery-ab67aef7-2e3/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 119, "start": 0, "sources": [{"url": "https://www.csenergy.com.au/what-we-do/firming-and-storage/chinchilla-battery", "name": "www.csenergy.com.au", "origin": "live", "checksum": "097378a9797993128abe6bc12d5e7a114db7c71de84c03247fe0f76ec185900f", "observed_at": "2026-10-17T10:42:00.937710+00:00", "revision_id": "c2d66bee-ab3b-4efc-b58c-235a8222bbb7", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "Grid-scale battery with 100 MW discharge capacity and 200 MWh storage capacity, comprising 80 Tesla Megapack 2 systems.", "statement": "Grid-scale battery with 100 MW discharge capacity and 200 MWh storage capacity, comprising 80 Tesla Megapack 2 systems.", "qualifications": {"attribution": "www.csenergy.com.au"}}, "label": "Energy", "icon": "energy"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 119, "start": 0, "sources": [{"url": "https://www.csenergy.com.au/what-we-do/firming-and-storage/chinchilla-battery", "name": "www.csenergy.com.au", "origin": "live", "checksum": "097378a9797993128abe6bc12d5e7a114db7c71de84c03247fe0f76ec185900f", "observed_at": "2026-10-17T10:42:00.937710+00:00", "revision_id": "c2d66bee-ab3b-4efc-b58c-235a8222bbb7", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "Grid-scale battery with 100 MW discharge capacity and 200 MWh storage capacity, comprising 80 Tesla Megapack 2 systems.", "statement": "Grid-scale battery with 100 MW discharge capacity and 200 MWh storage capacity, comprising 80 Tesla Megapack 2 systems.", "qualifications": {"attribution": "www.csenergy.com.au"}}}, "input_hash": "e752915fdaf5eee6fddbc59369a5e547dc23df63feaceadc312dda7fdc16ad0e", "release_id": "03529b19-3f1e-44de-8bc1-4b5b5fd80a44", "type_codes": ["battery_storage"], "field_states": {"type": {"state": "accepted", "reason": "Kogan Creek and Chinchilla in Queensland, Australia; battery is separate from adjacent generation."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "Kogan Creek and Chinchilla in Queensland, Australia; battery is separate from adjacent generation."}, "category": {"state": "accepted", "reason": "Kogan Creek and Chinchilla in Queensland, Australia; battery is separate from adjacent generation."}}, "region_codes": ["oceania"], "release_hash": "b26c544c73879aeff44ae353986de899b60356e390e141cf7782871f3ba13fd0", "assessment_id": "4368a8c3-0b6b-4904-b586-6adc98782ace", "country_codes": ["AU"], "assessment_hash": "300f663758551a079c535336a49aff6ce785f472fdaef705881fe591e909897f", "country_label": "Australia", "region_label": "Oceania", "type_labels": ["Battery Storage"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}