{"name": "Awaroa Sill, Ruam\u0101hanga Awa", "slug": "awaroa-sill-ruamahanga-awa-d9e17d53f819d40a", "as_of": "2026-10-02T16:54:36.039459+00:00", "depth": "basic", "facts": {"name": {"value": "Awaroa Sill, Ruam\u0101hanga Awa", "rights": "facts_only", "source": {"url": "https://www.gw.govt.nz/your-region/emergency-and-hazard-management/flood-protection/our-work/flood-resilience-projects/", "name": "Greater Wellington Regional Council own-text flood protection records", "origin": "live", "checksum": "c71ee05576091953862c696126b62fc0aa9a0b98afa09e4c4bc9809c3eaab9bd", "observed_at": "2026-10-02T13:30:32.524561+00:00", "revision_id": "df3369cd-e75f-4ca2-9568-33269d722921", "published_at": null}, "locator": "/html/body/main/div[2]/div/div[1]/div/div[2]/div/div[6]/button/h3", "claim_id": "260e7e32-b583-41ea-b74d-8d8b83813ee3", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "Greater Wellington Regional Council project narrative", "evidence_id": "dc728f5f-f350-4350-a561-8879c3ff7d9d", "valid_until": null, "assertion_id": "82726943-b67d-4fc1-9639-0eda4cd694db", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "The proposal is to reposition the existing sill farther back from the river edge and build 10 rock groynes, each of 200 tonnes, in front of it. The stated purpose of the groynes is to deflect flow away from the sill and reduce further lateral movement of the channel.", "rights": "facts_only", "source": {"url": "https://www.gw.govt.nz/your-region/emergency-and-hazard-management/flood-protection/our-work/flood-resilience-projects/", "name": "Greater Wellington Regional Council own-text flood protection records", "origin": "live", "checksum": "c71ee05576091953862c696126b62fc0aa9a0b98afa09e4c4bc9809c3eaab9bd", "observed_at": "2026-10-02T13:30:32.524561+00:00", "revision_id": "df3369cd-e75f-4ca2-9568-33269d722921", "published_at": null}, "locator": "/html/body/main/div[2]/div/div[1]/div/div[2]/div/div[6]/div/p[2]", "claim_id": "1f988f65-b31c-41cb-a9a6-47559ccf2b3a", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "Greater Wellington Regional Council project narrative", "evidence_id": "678dfc8d-4eb1-4b9f-95b6-8dd9d33d7a4e", "valid_until": null, "assertion_id": "fb1e4bec-07a6-445a-9f41-d08b9436f947", "temporal_expression": "", "extraction_confidence": 0.9}, "country": {"value": "New Zealand, as stated in the surrounding flood-resilience programme context.", "rights": "facts_only", "source": {"url": "https://www.gw.govt.nz/your-region/emergency-and-hazard-management/flood-protection/our-work/flood-resilience-projects/", "name": "Greater Wellington Regional Council own-text flood protection records", "origin": "live", "checksum": "c71ee05576091953862c696126b62fc0aa9a0b98afa09e4c4bc9809c3eaab9bd", "observed_at": "2026-10-02T13:30:32.524561+00:00", "revision_id": "df3369cd-e75f-4ca2-9568-33269d722921", "published_at": null}, "locator": "/html/body/main/div[2]/div/div[1]/div/div[1]/div/p[1]", "claim_id": "05d97108-e275-4f33-8da7-79781945ffad", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "Greater Wellington Regional Council project narrative", "evidence_id": "fb4c10ec-2b46-400b-8ec2-e82131700d14", "valid_until": null, "assertion_id": "6a809f9e-4983-4b8b-8623-65b0b914fe0f", "temporal_expression": "", "extraction_confidence": 0.9}, "activity": {"value": "The page says lateral river erosion has undermined the bank and reached the edge of the existing sill. The sill controls the volume and speed of water entering the spillway, particularly during high flow, reducing downstream flood risk.", "rights": "facts_only", "source": {"url": "https://www.gw.govt.nz/your-region/emergency-and-hazard-management/flood-protection/our-work/flood-resilience-projects/", "name": "Greater Wellington Regional Council own-text flood protection records", "origin": "live", "checksum": "c71ee05576091953862c696126b62fc0aa9a0b98afa09e4c4bc9809c3eaab9bd", "observed_at": "2026-10-02T13:30:32.524561+00:00", "revision_id": "df3369cd-e75f-4ca2-9568-33269d722921", "published_at": null}, "locator": "/html/body/main/div[2]/div/div[1]/div/div[2]/div/div[6]/div/p[1]", "claim_id": "81c5c9b1-8f9f-4e44-ae00-7bf18cddefdf", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "Greater Wellington Regional Council project narrative", "evidence_id": "b130a5e7-23f6-43a9-9cc9-abd8eff9c38d", "valid_until": null, "assertion_id": "7840912e-24ad-4931-8ab2-a09c6cc765d2", "temporal_expression": "", "extraction_confidence": 0.9}, "delivery": {"value": "The page reports that enabling works have begun and that the project is due to be completed in 2026. The completion statement is a forecast, not confirmation of completion.", "rights": "facts_only", "source": {"url": "https://www.gw.govt.nz/your-region/emergency-and-hazard-management/flood-protection/our-work/flood-resilience-projects/", "name": "Greater Wellington Regional Council own-text flood protection records", "origin": "live", "checksum": "c71ee05576091953862c696126b62fc0aa9a0b98afa09e4c4bc9809c3eaab9bd", "observed_at": "2026-10-02T13:30:32.524561+00:00", "revision_id": "df3369cd-e75f-4ca2-9568-33269d722921", "published_at": null}, "locator": "/html/body/main/div[2]/div/div[1]/div/div[2]/div/div[6]/div/p[3]", "claim_id": "948ed46a-0acf-4dfc-aa3f-a5eedf9e565e", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "Greater Wellington Regional Council project narrative", "evidence_id": "5ad3de2e-9bae-446c-9a6b-0fa9fa4dbc74", "valid_until": null, "assertion_id": "f1481f36-e250-4a61-9686-49e88d714972", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "At the existing Awaroa spillway sill on the Ruam\u0101hanga Awa. The broader programme is described as spanning Wairarapa and \u014ctaki, but this section gives no coordinates or more precise site boundaries.", "rights": "facts_only", "source": {"url": "https://www.gw.govt.nz/your-region/emergency-and-hazard-management/flood-protection/our-work/flood-resilience-projects/", "name": "Greater Wellington Regional Council own-text flood protection records", "origin": "live", "checksum": "c71ee05576091953862c696126b62fc0aa9a0b98afa09e4c4bc9809c3eaab9bd", "observed_at": "2026-10-02T13:30:32.524561+00:00", "revision_id": "df3369cd-e75f-4ca2-9568-33269d722921", "published_at": null}, "locator": "/html/body/main/div[2]/div/div[1]/div/div[2]/div/div[6]/button/h3", "claim_id": "7a384e20-0d84-4922-b0ae-f5ac5656a1a8", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "Greater Wellington Regional Council project narrative", "evidence_id": "dc728f5f-f350-4350-a561-8879c3ff7d9d", "valid_until": null, "assertion_id": "e1a65578-416d-44f5-87c9-810bb0803e54", "temporal_expression": "", "extraction_confidence": 0.9}, "contractor": {"value": "Shared programme context only: Mills Albert is described as appointed lead contractor for Greater Wellington\u2019s flood-resilience projects. The supplied text does not expressly confirm the contractor appointment or contract scope for Awaroa Sill.", "rights": "facts_only", "source": {"url": "https://www.gw.govt.nz/your-region/emergency-and-hazard-management/flood-protection/our-work/flood-resilience-projects/", "name": "Greater Wellington Regional Council own-text flood protection records", "origin": "live", "checksum": "c71ee05576091953862c696126b62fc0aa9a0b98afa09e4c4bc9809c3eaab9bd", "observed_at": "2026-10-02T13:30:32.524561+00:00", "revision_id": "df3369cd-e75f-4ca2-9568-33269d722921", "published_at": null}, "locator": "/html/body/main/div[2]/div/div[1]/div/div[3]/div/p[6]", "claim_id": "2c5b8704-dc6b-4b1b-b4ee-4e1eeb32d21c", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "Greater Wellington Regional Council project narrative", "evidence_id": "e7f6cb19-6187-4ac1-8856-efa9cc616811", "valid_until": null, "assertion_id": "5551ff5a-32c3-4f8d-8d1e-1cb12572e0f9", "temporal_expression": "", "extraction_confidence": 0.9}, "investment": {"value": "Programme-level context: Greater Wellington and MBIE\u2019s Regional Economic Development and Investment Unit, K\u0101noa, agreed to co-fund 16 flood-resilience projects. The page does not give an Awaroa Sill-specific allocation or cost.", "rights": "facts_only", "source": {"url": "https://www.gw.govt.nz/your-region/emergency-and-hazard-management/flood-protection/our-work/flood-resilience-projects/", "name": "Greater Wellington Regional Council own-text flood protection records", "origin": "live", "checksum": "c71ee05576091953862c696126b62fc0aa9a0b98afa09e4c4bc9809c3eaab9bd", "observed_at": "2026-10-02T13:30:32.524561+00:00", "revision_id": "df3369cd-e75f-4ca2-9568-33269d722921", "published_at": null}, "locator": "/html/body/main/div[2]/div/div[1]/div/div[1]/div/p[3]", "claim_id": "e429ab13-219c-404d-a48c-8bb16345af69", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "Greater Wellington Regional Council project narrative", "evidence_id": "b24fa223-7680-4897-b285-2e5b7cb674b4", "valid_until": null, "assertion_id": "6c170543-c373-4918-ae03-e59deacecd7b", "temporal_expression": "", "extraction_confidence": 0.9}, "regulatory": {"value": "The project is presented among the programme\u2019s sites; the introductory programme text says all projects have been granted resource consent. No consent details or dates are given for this site.", "rights": "facts_only", "source": {"url": "https://www.gw.govt.nz/your-region/emergency-and-hazard-management/flood-protection/our-work/flood-resilience-projects/", "name": "Greater Wellington Regional Council own-text flood protection records", "origin": "live", "checksum": "c71ee05576091953862c696126b62fc0aa9a0b98afa09e4c4bc9809c3eaab9bd", "observed_at": "2026-10-02T13:30:32.524561+00:00", "revision_id": "df3369cd-e75f-4ca2-9568-33269d722921", "published_at": null}, "locator": "/html/body/main/div[2]/div/div[1]/div/div[1]/div/p[4]", "claim_id": "36f2cc06-4136-4b71-be52-4d5091a320a4", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "Greater Wellington Regional Council project narrative", "evidence_id": "1874db75-0c05-4e1f-8454-d5e8c2aafa5a", "valid_until": null, "assertion_id": "68897a21-2cd3-4c43-9a83-1cfc680169ee", "temporal_expression": "", "extraction_confidence": 0.9}, "next_milestone": {"value": "Completion is due in 2026, according to the project section; no intermediate milestone is specified.", "rights": "facts_only", "source": {"url": "https://www.gw.govt.nz/your-region/emergency-and-hazard-management/flood-protection/our-work/flood-resilience-projects/", "name": "Greater Wellington Regional Council own-text flood protection records", "origin": "live", "checksum": "c71ee05576091953862c696126b62fc0aa9a0b98afa09e4c4bc9809c3eaab9bd", "observed_at": "2026-10-02T13:30:32.524561+00:00", "revision_id": "df3369cd-e75f-4ca2-9568-33269d722921", "published_at": null}, "locator": "/html/body/main/div[2]/div/div[1]/div/div[2]/div/div[6]/div/p[3]", "claim_id": "5012f347-952b-4d4f-aed2-f6f63096ae3e", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "Greater Wellington Regional Council project narrative", "evidence_id": "5ad3de2e-9bae-446c-9a6b-0fa9fa4dbc74", "valid_until": null, "assertion_id": "fb9bd2bd-3f98-492f-a2c3-19ae45084e8d", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "3af7e9eb-0b20-46a8-bb92-e83b0f0b9f98", "publication": {"local_only": false, "reviewed_at": "2026-10-15T17:22:40.540853+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "Greater Wellington identifies Awaroa Sill on the Ruam\u0101hanga Awa as an existing spillway structure affected by river erosion along the bank. The page describes the sill\u2019s role in controlling flow into the spillway during high flow and reducing downstream flood risk. \n\nThe stated plan is to move the sill farther from the river edge and construct 10 rock groynes, each weighing 200 tonnes, to divert flow and limit further lateral channel movement. The page reports that enabling works have begun and forecasts completion in 2026; it does not confirm completion. \n\nIn programme-level context, Greater Wellington and K\u0101noa agreed to co-fund 16 flood-resilience projects following Budget 2024. The introductory text also says all programme projects have resource consent. Neither statement provides an Awaroa-specific funding allocation or consent details.", "schema_version": "1.0", "public_unknowns": ["Exact site boundaries, coordinates, land ownership and access arrangements are not provided.", "The project-specific budget or funding allocation, contract award, procurement package and purchasing timetable are not stated. The contractor information is programme-level and does not confirm an Awaroa Sill contract.", "The page does not say when enabling works began or provide a later project-specific progress update confirming whether the proposed works have proceeded, changed or been completed. Completion in 2026 is presented as due, not achieved.", "Detailed engineering design, quantities beyond the stated groyne number and weight, and ecological effects or mitigation are not supplied.", "The supplied text gives no date for an Awaroa-specific update. The visible 29 May 2026 update timestamp belongs to the shared communities section, not the Awaroa project entry.", "This evidence covers the selected project section, front matter and shared sections, not the complete source page or independent corroboration. Other project sections and linked materials were not supplied for review."], "evidence_observed_at": "2026-10-02T13:30:32.524561+00:00", "knowledge_reviewed_at": "2026-10-15T17:22:40.540853+00:00", "decisive_evidence_observed_at": "2026-10-02T13:30:32.524561+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Awaroa Sill, Ruam\u0101hanga Awa", "original_project_title": "Awaroa Sill, Ruam\u0101hanga Awa", "canonical_url": "https://capexcue.com/projects/awaroa-sill-ruamahanga-awa-d9e17d53f819d40a/", "release": {"id": "450ff4c0-6ba4-453b-90c5-16f568a3b684", "number": 1, "published_at": "2026-10-15T17:22:40.981500+00:00"}, "release_reference": "release 1 (450ff4c0-6ba4-453b-90c5-16f568a3b684)", "current_dossier_url": "https://capexcue.com/projects/awaroa-sill-ruamahanga-awa-d9e17d53f819d40a/", "citation": "CapexCue \u2014 Awaroa Sill, Ruam\u0101hanga Awa \u2014 dossier released 2026-10-15T17:22:40.981500+00:00, release 1 (450ff4c0-6ba4-453b-90c5-16f568a3b684) \u2014 https://capexcue.com/projects/awaroa-sill-ruamahanga-awa-d9e17d53f819d40a/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "codex_retained_dossier_curation", "value": "water_environment", "support": {"end": 267, "start": 0, "sources": [{"url": "https://www.gw.govt.nz/your-region/emergency-and-hazard-management/flood-protection/our-work/flood-resilience-projects/", "name": "Greater Wellington Regional Council own-text flood protection records", "origin": "live", "checksum": "c71ee05576091953862c696126b62fc0aa9a0b98afa09e4c4bc9809c3eaab9bd", "observed_at": "2026-10-02T13:30:32.524561+00:00", "revision_id": "df3369cd-e75f-4ca2-9568-33269d722921", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "The proposal is to reposition the existing sill farther back from the river edge and build 10 rock groynes, each of 200 tonnes, in front of it. The stated purpose of the groynes is to deflect flow away from the sill and reduce further lateral movement of the channel.", "statement": "The proposal is to reposition the existing sill farther back from the river edge and build 10 rock groynes, each of 200 tonnes, in front of it. The stated purpose of the groynes is to deflect flow away from the sill and reduce further lateral movement of the channel.", "qualifications": {"attribution": "Greater Wellington Regional Council project narrative"}}, "label": "Water and environment", "icon": "water"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "codex_retained_dossier_curation", "value": "water_environment", "support": {"end": 267, "start": 0, "sources": [{"url": "https://www.gw.govt.nz/your-region/emergency-and-hazard-management/flood-protection/our-work/flood-resilience-projects/", "name": "Greater Wellington Regional Council own-text flood protection records", "origin": "live", "checksum": "c71ee05576091953862c696126b62fc0aa9a0b98afa09e4c4bc9809c3eaab9bd", "observed_at": "2026-10-02T13:30:32.524561+00:00", "revision_id": "df3369cd-e75f-4ca2-9568-33269d722921", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "The proposal is to reposition the existing sill farther back from the river edge and build 10 rock groynes, each of 200 tonnes, in front of it. The stated purpose of the groynes is to deflect flow away from the sill and reduce further lateral movement of the channel.", "statement": "The proposal is to reposition the existing sill farther back from the river edge and build 10 rock groynes, each of 200 tonnes, in front of it. The stated purpose of the groynes is to deflect flow away from the sill and reduce further lateral movement of the channel.", "qualifications": {"attribution": "Greater Wellington Regional Council project narrative"}}}, "input_hash": "fa36e80b5a8122623c3de816c9b4e6ead983fd5b959ebddb7bedd6504e60e595", "release_id": "450ff4c0-6ba4-453b-90c5-16f568a3b684", "type_codes": [], "field_states": {"type": {"state": "unknown_after_assessment", "reason": "New Zealand flood-resilience sill and river-bank protection; no registered flood-defence type."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "New Zealand flood-resilience sill and river-bank protection; no registered flood-defence type."}, "category": {"state": "accepted", "reason": "New Zealand flood-resilience sill and river-bank protection; no registered flood-defence type."}}, "region_codes": ["oceania"], "release_hash": "da94b66953cc852752a4d2c9892d96852c79cc817e682db662cc142ea2f89ad0", "assessment_id": "33a51fb8-10c7-4e73-ada6-b3db25bbf380", "country_codes": ["NZ"], "assessment_hash": "738743f3a3cf890d897ca641a23f5a1a934742683c31e0c5925324732a6f2757", "country_label": "New Zealand", "region_label": "Oceania", "type_labels": []}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}