{"name": "Zac Cambac\u00e9r\u00e8s Nord (ZAC Cambac\u00e9r\u00e8s Nord)", "slug": "zac-cambaceres-nord-zac-cambaceres-nord-be9a0fdc8cced24c", "as_of": "2026-10-04T21:03:40.477721+00:00", "depth": "basic", "facts": {"name": {"value": "Zac Cambac\u00e9r\u00e8s Nord (ZAC Cambac\u00e9r\u00e8s Nord)", "rights": "facts_only", "source": {"url": "https://www.igedd.developpement-durable.gouv.fr/IMG/pdf/5_-_zac_cambaceres_a_montpellier_34__cle11e85d.pdf", "name": "IGEDD environmental authority native opinion text", "origin": "live", "checksum": "372ba62bea730c65d9c141c45e792aa413472c5e883491f85243f84906c62394", "observed_at": "2026-10-04T19:47:35.265140+00:00", "revision_id": "2165aba5-52b8-4978-b41a-2130d03c346a", "published_at": null}, "locator": "page:3", "claim_id": "7d6051ca-049b-41ca-bb11-08145a312a6a", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "IGEDD Autorit\u00e9 environnementale governmentauthoredopinion", "evidence_id": "1b6ff740-cbf5-4f2d-8cc9-accfd709db0d", "valid_until": null, "assertion_id": "cc817fe9-1655-406b-88f8-6ed73457068b", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "An approximately 60-hectare northern urban development zone planned for about 400,000 m\u00b2 of floor area and an urban park. Its revised programme is predominantly tertiary activities and higher education; about 300 homes are retained south of the station. The report describes the zone as organized around Montpellier Sud de France station, which was already built, while treating the station and other connected infrastructure as distinct linked operations.", "rights": "facts_only", "source": {"url": "https://www.igedd.developpement-durable.gouv.fr/IMG/pdf/5_-_zac_cambaceres_a_montpellier_34__cle11e85d.pdf", "name": "IGEDD environmental authority native opinion text", "origin": "live", "checksum": "372ba62bea730c65d9c141c45e792aa413472c5e883491f85243f84906c62394", "observed_at": "2026-10-04T19:47:35.265140+00:00", "revision_id": "2165aba5-52b8-4978-b41a-2130d03c346a", "published_at": null}, "locator": "page:3", "claim_id": "6c2dfe47-c445-4f67-975c-ae1d3d0d6998", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "IGEDD Autorit\u00e9 environnementale governmentauthoredopinion", "evidence_id": "1b6ff740-cbf5-4f2d-8cc9-accfd709db0d", "valid_until": null, "assertion_id": "a48e84bb-1308-4d3d-8bd6-eba469d44cd0", "temporal_expression": "", "extraction_confidence": 0.9}, "ecology": {"value": "The authority identifies population health (noise and air quality), greenhouse-gas emissions, soil sealing, water conditions, landscape and biodiversity as key environmental issues. It considers the impact assessment materially deficient, including because it is restricted largely to ZAC works rather than the connected project as a whole; the geothermal plant is acknowledged as part of the project, but its impact assessment is not included.", "rights": "facts_only", "source": {"url": "https://www.igedd.developpement-durable.gouv.fr/IMG/pdf/5_-_zac_cambaceres_a_montpellier_34__cle11e85d.pdf", "name": "IGEDD environmental authority native opinion text", "origin": "live", "checksum": "372ba62bea730c65d9c141c45e792aa413472c5e883491f85243f84906c62394", "observed_at": "2026-10-04T19:47:35.265140+00:00", "revision_id": "2165aba5-52b8-4978-b41a-2130d03c346a", "published_at": null}, "locator": "page:3", "claim_id": "c81bd92c-fce0-4232-a8eb-2a52056d01d5", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "IGEDD Autorit\u00e9 environnementale governmentauthoredopinion", "evidence_id": "1b6ff740-cbf5-4f2d-8cc9-accfd709db0d", "valid_until": null, "assertion_id": "f30e9788-069e-45a9-bd3f-995efdc4f86a", "temporal_expression": "", "extraction_confidence": 0.9}, "delivery": {"value": "The dossier said the first 65,000 m\u00b2 should be delivered by the end of 2024, with 200,000 m\u00b2 planned between the dossier\u2019s present and 2033 and the remaining 135,000 m\u00b2 between 2033 and 2038. The opinion does not confirm whether the first delivery occurred; these are reported programme dates, not verified completion status.", "rights": "facts_only", "source": {"url": "https://www.igedd.developpement-durable.gouv.fr/IMG/pdf/5_-_zac_cambaceres_a_montpellier_34__cle11e85d.pdf", "name": "IGEDD environmental authority native opinion text", "origin": "live", "checksum": "372ba62bea730c65d9c141c45e792aa413472c5e883491f85243f84906c62394", "observed_at": "2026-10-04T19:47:35.265140+00:00", "revision_id": "2165aba5-52b8-4978-b41a-2130d03c346a", "published_at": null}, "locator": "page:5", "claim_id": "66baee71-daa9-40a3-bfc6-7a63e12b4e3c", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "IGEDD Autorit\u00e9 environnementale governmentauthoredopinion", "evidence_id": "6f9b92b9-32f2-4299-9435-f03ba4817471", "valid_until": null, "assertion_id": "4d32bdf7-80a3-49f3-8e57-f0fc27468550", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Southeastern Montpellier, in the H\u00e9rault department, around Montpellier Sud de France station.", "rights": "facts_only", "source": {"url": "https://www.igedd.developpement-durable.gouv.fr/IMG/pdf/5_-_zac_cambaceres_a_montpellier_34__cle11e85d.pdf", "name": "IGEDD environmental authority native opinion text", "origin": "live", "checksum": "372ba62bea730c65d9c141c45e792aa413472c5e883491f85243f84906c62394", "observed_at": "2026-10-04T19:47:35.265140+00:00", "revision_id": "2165aba5-52b8-4978-b41a-2130d03c346a", "published_at": null}, "locator": "page:3", "claim_id": "5b788125-f89d-463c-bab4-6e881ca7168a", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "IGEDD Autorit\u00e9 environnementale governmentauthoredopinion", "evidence_id": "1b6ff740-cbf5-4f2d-8cc9-accfd709db0d", "valid_until": null, "assertion_id": "ee572d09-0c21-4d38-9234-6cdd99afbc41", "temporal_expression": "", "extraction_confidence": 0.9}, "regulatory": {"value": "The ZAC was created on 29 October 2013 and its realization was authorized by prefectural order on 19 August 2015. The metropolitan council decided to modify the realization dossier on 19 July 2024. The 26 June 2025 environmental authority opinion concerns the updated dossier and is expressly neither favorable nor unfavorable; it is not an authorization decision. Electronic public participation was said to be planned, but no schedule was given.", "rights": "facts_only", "source": {"url": "https://www.igedd.developpement-durable.gouv.fr/IMG/pdf/5_-_zac_cambaceres_a_montpellier_34__cle11e85d.pdf", "name": "IGEDD environmental authority native opinion text", "origin": "live", "checksum": "372ba62bea730c65d9c141c45e792aa413472c5e883491f85243f84906c62394", "observed_at": "2026-10-04T19:47:35.265140+00:00", "revision_id": "2165aba5-52b8-4978-b41a-2130d03c346a", "published_at": null}, "locator": "page:2", "claim_id": "9b18cbca-74d6-43b9-95fa-31f726e34b8c", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "IGEDD Autorit\u00e9 environnementale governmentauthoredopinion", "evidence_id": "02fd6c34-6ef4-40d9-bc7d-c80a7faa74a1", "valid_until": null, "assertion_id": "d835b3ab-6421-48ab-8dd1-524e3eff0998", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "3de8cc35-3bcd-4278-9793-9c735e0885f7", "publication": {"local_only": false, "reviewed_at": "2026-10-16T16:37:25.081225+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "Zac Cambac\u00e9r\u00e8s Nord \u2014 Montpellier, France\n\nThe opinion describes Zac Cambac\u00e9r\u00e8s Nord as a northern urban development zone of approximately 60 hectares, around Montpellier Sud de France station. Its planned scope includes about 400,000 m\u00b2 of floor area and an urban park. The revised programme is mainly tertiary activities and higher education, with about 300 homes south of the station. \n\nThe opinion\u2019s synthesis identifies Montpellier M\u00e9diterran\u00e9e M\u00e9tropole as ma\u00eetre d\u2019ouvrage of the wider Cambac\u00e9r\u00e8s development and says it entrusted realization to SA3M. Its detailed presentation identifies SA3M\u2019s ma\u00eetrise d\u2019ouvrage of the ZAC. \n\nThe environmental authority\u2019s opinion, dated 26 June 2025, is neither favorable nor unfavorable and is not an authorization decision. It identifies health (noise and air quality), greenhouse-gas emissions, soil sealing, water conditions, landscape and biodiversity as key environmental issues. It also says the impact assessment is limited largely to ZAC works rather than the connected project as a whole; although the geothermal plant is recognized as part of the project, its impact assessment is not included.", "schema_version": "1.0", "public_unknowns": ["The opinion reports that the first 65,000 m\u00b2 should be delivered by the end of 2024, but does not confirm whether this occurred or establish current construction or occupancy status.", "The opinion says electronic public participation was planned but gives no schedule; its timing and outcome are not established there.", "Whether the impact assessment was subsequently completed for the connected project as a whole, including the geothermal plant, is not established by this opinion.", "The opinion is dated 26 June 2025; it does not establish changes after that date."], "evidence_observed_at": "2026-10-04T19:47:35.265140+00:00", "knowledge_reviewed_at": "2026-10-16T16:37:25.081225+00:00", "decisive_evidence_observed_at": "2026-10-04T19:47:35.265140+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Zac Cambac\u00e9r\u00e8s Nord (ZAC Cambac\u00e9r\u00e8s Nord)", "original_project_title": "Zac Cambac\u00e9r\u00e8s Nord (ZAC Cambac\u00e9r\u00e8s Nord)", "canonical_url": "https://capexcue.com/projects/zac-cambaceres-nord-zac-cambaceres-nord-be9a0fdc8cced24c/", "release": {"id": "e3f2c954-be6b-4f0d-a318-21bba0268b48", "number": 1, "published_at": "2026-10-16T16:37:26.882196+00:00"}, "release_reference": "release 1 (e3f2c954-be6b-4f0d-a318-21bba0268b48)", "current_dossier_url": "https://capexcue.com/projects/zac-cambaceres-nord-zac-cambaceres-nord-be9a0fdc8cced24c/", "citation": "CapexCue \u2014 Zac Cambac\u00e9r\u00e8s Nord (ZAC Cambac\u00e9r\u00e8s Nord) \u2014 dossier released 2026-10-16T16:37:26.882196+00:00, release 1 (e3f2c954-be6b-4f0d-a318-21bba0268b48) \u2014 https://capexcue.com/projects/zac-cambaceres-nord-zac-cambaceres-nord-be9a0fdc8cced24c/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "codex_retained_dossier_curation", "value": "other_infrastructure", "support": {"end": 456, "start": 0, "sources": [{"url": "https://www.igedd.developpement-durable.gouv.fr/IMG/pdf/5_-_zac_cambaceres_a_montpellier_34__cle11e85d.pdf", "name": "IGEDD environmental authority native opinion text", "origin": "live", "checksum": "372ba62bea730c65d9c141c45e792aa413472c5e883491f85243f84906c62394", "observed_at": "2026-10-04T19:47:35.265140+00:00", "revision_id": "2165aba5-52b8-4978-b41a-2130d03c346a", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "An approximately 60-hectare northern urban development zone planned for about 400,000 m\u00b2 of floor area and an urban park. Its revised programme is predominantly tertiary activities and higher education; about 300 homes are retained south of the station. The report describes the zone as organized around Montpellier Sud de France station, which was already built, while treating the station and other connected infrastructure as distinct linked operations.", "statement": "An approximately 60-hectare northern urban development zone planned for about 400,000 m\u00b2 of floor area and an urban park. Its revised programme is predominantly tertiary activities and higher education; about 300 homes are retained south of the station. The report describes the zone as organized around Montpellier Sud de France station, which was already built, while treating the station and other connected infrastructure as distinct linked operations.", "qualifications": {"attribution": "IGEDD Autorit\u00e9 environnementale governmentauthoredopinion"}}, "label": "Other infrastructure", "icon": "grid"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "codex_retained_dossier_curation", "value": "other_infrastructure", "support": {"end": 456, "start": 0, "sources": [{"url": "https://www.igedd.developpement-durable.gouv.fr/IMG/pdf/5_-_zac_cambaceres_a_montpellier_34__cle11e85d.pdf", "name": "IGEDD environmental authority native opinion text", "origin": "live", "checksum": "372ba62bea730c65d9c141c45e792aa413472c5e883491f85243f84906c62394", "observed_at": "2026-10-04T19:47:35.265140+00:00", "revision_id": "2165aba5-52b8-4978-b41a-2130d03c346a", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "An approximately 60-hectare northern urban development zone planned for about 400,000 m\u00b2 of floor area and an urban park. Its revised programme is predominantly tertiary activities and higher education; about 300 homes are retained south of the station. The report describes the zone as organized around Montpellier Sud de France station, which was already built, while treating the station and other connected infrastructure as distinct linked operations.", "statement": "An approximately 60-hectare northern urban development zone planned for about 400,000 m\u00b2 of floor area and an urban park. Its revised programme is predominantly tertiary activities and higher education; about 300 homes are retained south of the station. The report describes the zone as organized around Montpellier Sud de France station, which was already built, while treating the station and other connected infrastructure as distinct linked operations.", "qualifications": {"attribution": "IGEDD Autorit\u00e9 environnementale governmentauthoredopinion"}}}, "input_hash": "c127483590e98bda8625a2f4c1eefe4178bc2294f6c67e39857d3611868fc621", "release_id": "e3f2c954-be6b-4f0d-a318-21bba0268b48", "type_codes": [], "field_states": {"type": {"state": "unknown_after_assessment", "reason": "Montpellier identifies France; mixed tertiary/higher-education/housing urban development is distinct from the already built station. No single registered urban-development type."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "Montpellier identifies France; mixed tertiary/higher-education/housing urban development is distinct from the already built station. No single registered urban-development type."}, "category": {"state": "accepted", "reason": "Montpellier identifies France; mixed tertiary/higher-education/housing urban development is distinct from the already built station. No single registered urban-development type."}}, "region_codes": ["europe"], "release_hash": "d9c3943e6c380f920de06a0ce286440cd35242055ea515d3deb1c0b8c604d31c", "assessment_id": "26114f94-bb81-4f97-952e-f10e1bb0be85", "country_codes": ["FR"], "assessment_hash": "9a992ed64ce419bb2e62a65619c3544cfd6a4dfb8e11bb97b4e28b6c987dc83a", "country_label": "France", "region_label": "Europe", "type_labels": []}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}