# Zac Cambacérès Nord (ZAC Cambacérès Nord)

Publisher: CapexCue
Canonical dossier: <https://capexcue.com/projects/zac-cambaceres-nord-zac-cambaceres-nord-be9a0fdc8cced24c/>
Dossier reference: release 1 (e3f2c954-be6b-4f0d-a318-21bba0268b48)

Released project intelligence

Oldest supporting observation: 2026-10-04T19:47:35.265140+00:00
Dossier released: 2026-10-16T16:37:26.882196+00:00
Source report dates and capture dates are listed per fact below; neither establishes an event date.

## Project summary

Zac Cambacérès Nord — Montpellier, France

The opinion describes Zac Cambacérès Nord as a northern urban development zone of approximately 60 hectares, around Montpellier Sud de France station. Its planned scope includes about 400,000 m² of floor area and an urban park. The revised programme is mainly tertiary activities and higher education, with about 300 homes south of the station. 

The opinion’s synthesis identifies Montpellier Méditerranée Métropole as maître d’ouvrage of the wider Cambacérès development and says it entrusted realization to SA3M. Its detailed presentation identifies SA3M’s maîtrise d’ouvrage of the ZAC. 

The environmental authority’s opinion, dated 26 June 2025, is neither favorable nor unfavorable and is not an authorization decision. It identifies health (noise and air quality), greenhouse-gas emissions, soil sealing, water conditions, landscape and biodiversity as key environmental issues. It also says the impact assessment is limited largely to ZAC works rather than the connected project as a whole; although the geothermal plant is recognized as part of the project, its impact assessment is not included.

## Evidence limits and unknowns

- The opinion reports that the first 65,000 m² should be delivered by the end of 2024, but does not confirm whether this occurred or establish current construction or occupancy status.
- The opinion says electronic public participation was planned but gives no schedule; its timing and outcome are not established there.
- Whether the impact assessment was subsequently completed for the connected project as a whole, including the geothermal plant, is not established by this opinion.
- The opinion is dated 26 June 2025; it does not establish changes after that date.

Current purchasing availability: unknown.
Source-dated plans do not establish current progress or available supplier packages.

## Project metadata

Country: France
Region: Europe
Physical assets: Not classified
Derived from the exact released evidence; unresolved fields remain unclassified.

## Project category

Other infrastructure
Derived from the reviewed scope statement; delivery stage remains unclassified.
An approximately 60-hectare northern urban development zone planned for about 400,000 m² of floor area and an urban park. Its revised programme is predominantly tertiary activities and higher education; about 300 homes are retained south of the station. The report describes the zone as organized around Montpellier Sud de France station, which was already built, while treating the station and other connected infrastructure as distinct linked operations.
Source: IGEDD environmental authority native opinion text — https://www.igedd.developpement-durable.gouv.fr/IMG/pdf/5_-_zac_cambaceres_a_montpellier_34__cle11e85d.pdf | published unknown | observed 2026-10-04T19:47:35.265140+00:00

Project overview
Oldest decisive evidence: 2026-10-04T19:47:35.265140+00:00
Newest evidence: 2026-10-04T19:47:35.265140+00:00
Knowledge reviewed: 2026-10-16T16:37:25.081225+00:00
Publication reviewed: 2026-10-16T16:37:25.081225+00:00

## Name
Zac Cambacérès Nord (ZAC Cambacérès Nord)
Status: reported
Attribution: IGEDD Autorité environnementale governmentauthoredopinion
Source: IGEDD environmental authority native opinion text — https://www.igedd.developpement-durable.gouv.fr/IMG/pdf/5_-_zac_cambaceres_a_montpellier_34__cle11e85d.pdf | published unknown | observed 2026-10-04T19:47:35.265140+00:00

## Scope
An approximately 60-hectare northern urban development zone planned for about 400,000 m² of floor area and an urban park. Its revised programme is predominantly tertiary activities and higher education; about 300 homes are retained south of the station. The report describes the zone as organized around Montpellier Sud de France station, which was already built, while treating the station and other connected infrastructure as distinct linked operations.
Status: planned
Attribution: IGEDD Autorité environnementale governmentauthoredopinion
Source: IGEDD environmental authority native opinion text — https://www.igedd.developpement-durable.gouv.fr/IMG/pdf/5_-_zac_cambaceres_a_montpellier_34__cle11e85d.pdf | published unknown | observed 2026-10-04T19:47:35.265140+00:00

## Ecology
The authority identifies population health (noise and air quality), greenhouse-gas emissions, soil sealing, water conditions, landscape and biodiversity as key environmental issues. It considers the impact assessment materially deficient, including because it is restricted largely to ZAC works rather than the connected project as a whole; the geothermal plant is acknowledged as part of the project, but its impact assessment is not included.
Status: reported
Attribution: IGEDD Autorité environnementale governmentauthoredopinion
Source: IGEDD environmental authority native opinion text — https://www.igedd.developpement-durable.gouv.fr/IMG/pdf/5_-_zac_cambaceres_a_montpellier_34__cle11e85d.pdf | published unknown | observed 2026-10-04T19:47:35.265140+00:00

## Delivery
The dossier said the first 65,000 m² should be delivered by the end of 2024, with 200,000 m² planned between the dossier’s present and 2033 and the remaining 135,000 m² between 2033 and 2038. The opinion does not confirm whether the first delivery occurred; these are reported programme dates, not verified completion status.
Status: planned
Attribution: IGEDD Autorité environnementale governmentauthoredopinion
Source: IGEDD environmental authority native opinion text — https://www.igedd.developpement-durable.gouv.fr/IMG/pdf/5_-_zac_cambaceres_a_montpellier_34__cle11e85d.pdf | published unknown | observed 2026-10-04T19:47:35.265140+00:00

## Location
Southeastern Montpellier, in the Hérault department, around Montpellier Sud de France station.
Status: reported
Attribution: IGEDD Autorité environnementale governmentauthoredopinion
Source: IGEDD environmental authority native opinion text — https://www.igedd.developpement-durable.gouv.fr/IMG/pdf/5_-_zac_cambaceres_a_montpellier_34__cle11e85d.pdf | published unknown | observed 2026-10-04T19:47:35.265140+00:00

## Regulatory
The ZAC was created on 29 October 2013 and its realization was authorized by prefectural order on 19 August 2015. The metropolitan council decided to modify the realization dossier on 19 July 2024. The 26 June 2025 environmental authority opinion concerns the updated dossier and is expressly neither favorable nor unfavorable; it is not an authorization decision. Electronic public participation was said to be planned, but no schedule was given.
Status: reported
Attribution: IGEDD Autorité environnementale governmentauthoredopinion
Source: IGEDD environmental authority native opinion text — https://www.igedd.developpement-durable.gouv.fr/IMG/pdf/5_-_zac_cambaceres_a_montpellier_34__cle11e85d.pdf | published unknown | observed 2026-10-04T19:47:35.265140+00:00


## Cite this dossier

CapexCue — Zac Cambacérès Nord (ZAC Cambacérès Nord) — dossier released 2026-10-16T16:37:26.882196+00:00, release 1 (e3f2c954-be6b-4f0d-a318-21bba0268b48) — https://capexcue.com/projects/zac-cambaceres-nord-zac-cambaceres-nord-be9a0fdc8cced24c/.

For current information and later dossier updates, visit <https://capexcue.com/projects/zac-cambaceres-nord-zac-cambaceres-nord-be9a0fdc8cced24c/>.
This file records the release identified above; the current dossier may change.