{"name": "Rogun Hydropower Plant (HPP)", "slug": "rogun-hydropower-plant-hpp-91641fc4-a81", "as_of": "2026-10-15T11:37:54.436641+00:00", "depth": "basic", "facts": {"date": {"value": "June 30, 2026 \u2014 date of the reported Board approval of second-phase financing.", "rights": "facts_only", "source": {"url": "https://www.worldbank.org/en/news/press-release/2026/06/30/advancing-energy-security-and-jobs-through-the-transformative-rogun-hydropower-project", "name": "www.worldbank.org", "origin": "live", "checksum": "8e24df8b73e11ebdecdd48c0600219bd19b86e9ea7835962cc17cb130966ac85", "observed_at": "2026-10-15T11:37:04.659684+00:00", "revision_id": "861421af-b3ca-44e7-9968-fcf9f2fdbab5", "published_at": null}, "locator": "/html/body/main/div[1]/div[4]/div[17]/div[2]/text-position:197", "claim_id": "03df9e17-1950-4bb8-87ac-6917bfcf5f72", "modality": "actual", "confidence": 0.9, "valid_from": null, "attribution": "www.worldbank.org", "evidence_id": "866ff472-f209-44cb-a6c7-e6ae455bb0b5", "valid_until": null, "assertion_id": "866ae4f8-eeb1-422f-b162-ab6728e1cdb0", "temporal_expression": "", "extraction_confidence": 0.9}, "name": {"value": "Rogun Hydropower Plant (HPP)", "rights": "facts_only", "source": {"url": "https://www.worldbank.org/en/news/press-release/2026/06/30/advancing-energy-security-and-jobs-through-the-transformative-rogun-hydropower-project", "name": "www.worldbank.org", "origin": "live", "checksum": "8e24df8b73e11ebdecdd48c0600219bd19b86e9ea7835962cc17cb130966ac85", "observed_at": "2026-10-15T11:37:04.659684+00:00", "revision_id": "861421af-b3ca-44e7-9968-fcf9f2fdbab5", "published_at": null}, "locator": "/html/body/main/div[2]/div[4]/div[2]/div/p[1]", "claim_id": "fdcc3ee8-b4d6-41eb-9f9e-f24e46049c64", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.worldbank.org", "evidence_id": "0d345f59-4186-4020-b1f5-d081d7dc7c37", "valid_until": null, "assertion_id": "8560af45-c447-4094-95ea-d083a13fa2a2", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "The second phase of financing will fund civil works, electromechanical equipment for power generation, and implementation support, including quality control, safety, environmental and social measures (including resettlement and livelihood restoration), and monitoring and forecasting for reservoir operations and downstream flood-risk management.", "rights": "facts_only", "source": {"url": "https://www.worldbank.org/en/news/press-release/2026/06/30/advancing-energy-security-and-jobs-through-the-transformative-rogun-hydropower-project", "name": "www.worldbank.org", "origin": "live", "checksum": "8e24df8b73e11ebdecdd48c0600219bd19b86e9ea7835962cc17cb130966ac85", "observed_at": "2026-10-15T11:37:04.659684+00:00", "revision_id": "861421af-b3ca-44e7-9968-fcf9f2fdbab5", "published_at": null}, "locator": "/html/body/main/div[1]/div[4]/div[4]/div[2]/text-position:99", "claim_id": "0cc56e79-1f8b-4a52-aac8-68696a4871b0", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "www.worldbank.org", "evidence_id": "f6e0566e-a660-4f24-9758-e1d6e316ca83", "valid_until": null, "assertion_id": "df30caff-ff7d-49a2-8046-d15a34fddc2f", "temporal_expression": "", "extraction_confidence": 0.9}, "sector": {"value": "Hydropower and renewable electricity generation.", "rights": "facts_only", "source": {"url": "https://www.worldbank.org/en/news/press-release/2026/06/30/advancing-energy-security-and-jobs-through-the-transformative-rogun-hydropower-project", "name": "www.worldbank.org", "origin": "live", "checksum": "8e24df8b73e11ebdecdd48c0600219bd19b86e9ea7835962cc17cb130966ac85", "observed_at": "2026-10-15T11:37:04.659684+00:00", "revision_id": "861421af-b3ca-44e7-9968-fcf9f2fdbab5", "published_at": null}, "locator": "/html/body/main/div[1]/div[4]/div[5]/div[2]/ul/li[3]", "claim_id": "9dbf40d7-5e56-4ce9-8136-41ab4ed3696b", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.worldbank.org", "evidence_id": "9d620f19-df2e-4436-b568-8e306913f847", "valid_until": null, "assertion_id": "f611776b-84ac-4bc2-a08b-cb6d6cd33d81", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Tajikistan", "rights": "facts_only", "source": {"url": "https://www.worldbank.org/en/news/press-release/2026/06/30/advancing-energy-security-and-jobs-through-the-transformative-rogun-hydropower-project", "name": "www.worldbank.org", "origin": "live", "checksum": "8e24df8b73e11ebdecdd48c0600219bd19b86e9ea7835962cc17cb130966ac85", "observed_at": "2026-10-15T11:37:04.659684+00:00", "revision_id": "861421af-b3ca-44e7-9968-fcf9f2fdbab5", "published_at": null}, "locator": "/html/body/main/div[1]/div[4]/div[5]/div[2]/ul/li[2]", "claim_id": "c94fec1c-f314-4d2d-b125-9887b24348b2", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.worldbank.org", "evidence_id": "7d48756e-58e9-4957-9cfa-36f30796b09f", "valid_until": null, "assertion_id": "831ef98a-9a2d-4b2c-aff4-644918bcab0a", "temporal_expression": "", "extraction_confidence": 0.9}, "source_program": {"value": "The related World Bank project is titled \u201cSustainable Financing for Rogun HPP - Phase 2\u201d (P513856).", "rights": "facts_only", "source": {"url": "https://www.worldbank.org/en/news/press-release/2026/06/30/advancing-energy-security-and-jobs-through-the-transformative-rogun-hydropower-project", "name": "www.worldbank.org", "origin": "live", "checksum": "8e24df8b73e11ebdecdd48c0600219bd19b86e9ea7835962cc17cb130966ac85", "observed_at": "2026-10-15T11:37:04.659684+00:00", "revision_id": "861421af-b3ca-44e7-9968-fcf9f2fdbab5", "published_at": null}, "locator": "/html/body/main/div[2]/div[11]/div[4]/div[1]/text-position:489", "claim_id": "b76a6651-cd84-4568-9ad7-fcd61da249ac", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.worldbank.org", "evidence_id": "9e68a8ce-e0ad-4c64-8533-4e3ea8a5fbf2", "valid_until": null, "assertion_id": "f0386ce6-a3ad-4901-ab5b-a3cc971ed3a9", "temporal_expression": "", "extraction_confidence": 0.9}, "financing_stage": {"value": "The World Bank Board of Executive Directors approved the second phase of financing on June 30, 2026.", "rights": "facts_only", "source": {"url": "https://www.worldbank.org/en/news/press-release/2026/06/30/advancing-energy-security-and-jobs-through-the-transformative-rogun-hydropower-project", "name": "www.worldbank.org", "origin": "live", "checksum": "8e24df8b73e11ebdecdd48c0600219bd19b86e9ea7835962cc17cb130966ac85", "observed_at": "2026-10-15T11:37:04.659684+00:00", "revision_id": "861421af-b3ca-44e7-9968-fcf9f2fdbab5", "published_at": null}, "locator": "/html/body/main/div[1]/div[4]/div[17]/div[2]/text-position:197", "claim_id": "8277178a-9983-4eed-bcf8-2402879eaa1b", "modality": "actual", "confidence": 0.9, "valid_from": null, "attribution": "www.worldbank.org", "evidence_id": "866ff472-f209-44cb-a6c7-e6ae455bb0b5", "valid_until": null, "assertion_id": "29c02b3e-74be-44c0-a5f3-145a6563f773", "temporal_expression": "", "extraction_confidence": 0.9}, "financing_amount": {"value": "The second-phase funding is supported by a $300 million IDA grant; the source does not identify this as the total cost of the plant.", "rights": "facts_only", "source": {"url": "https://www.worldbank.org/en/news/press-release/2026/06/30/advancing-energy-security-and-jobs-through-the-transformative-rogun-hydropower-project", "name": "www.worldbank.org", "origin": "live", "checksum": "8e24df8b73e11ebdecdd48c0600219bd19b86e9ea7835962cc17cb130966ac85", "observed_at": "2026-10-15T11:37:04.659684+00:00", "revision_id": "861421af-b3ca-44e7-9968-fcf9f2fdbab5", "published_at": null}, "locator": "/html/body/main/div[2]/div[4]/div[2]/div/p[5]", "claim_id": "8e42c6b9-7108-4fa4-a081-9306012ab51d", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.worldbank.org", "evidence_id": "a7581e59-474a-4db1-b7ab-bb76bb61501d", "valid_until": null, "assertion_id": "aaf484e0-94f0-4eeb-97b9-879f285e08ec", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "410c1ca7-2d64-4679-9809-7802cc29ff6f", "publication": {"local_only": false, "reviewed_at": "2026-10-15T14:03:32.919031+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "The Rogun Hydropower Plant (HPP) in Tajikistan has a second phase of financing approved by the World Bank Board on June 30, 2026. Planned funding supports civil works, power-generation electromechanical equipment, and implementation measures that include quality control, safety, environmental and social measures, and monitoring and forecasting for reservoir operations and downstream flood-risk management. The $300 million IDA grant supports this phase; the release does not identify it as the plant\u2019s total cost. \n\nThe release describes more than 30,000 direct and indirect jobs and improved electricity access for 10 million people as expected benefits, not achieved outcomes.", "schema_version": "1.0", "public_unknowns": ["The supplied World Bank release, dated June 30, 2026 and last updated July 6, 2026, does not specify a more precise plant location, plant-wide total cost, contractor, operator, procurement schedule, or current package availability."], "evidence_observed_at": "2026-10-15T11:37:04.659684+00:00", "knowledge_reviewed_at": "2026-10-15T11:37:54.921986+00:00", "decisive_evidence_observed_at": "2026-10-15T11:37:04.659684+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Rogun Hydropower Plant (HPP)", "original_project_title": "Rogun Hydropower Plant (HPP)", "canonical_url": "https://capexcue.com/projects/rogun-hydropower-plant-hpp-91641fc4-a81/", "release": {"id": "ec7716b3-93ee-4461-9ab3-a644e5373574", "number": 1, "published_at": "2026-10-15T14:03:33.421555+00:00"}, "release_reference": "release 1 (ec7716b3-93ee-4461-9ab3-a644e5373574)", "current_dossier_url": "https://capexcue.com/projects/rogun-hydropower-plant-hpp-91641fc4-a81/", "citation": "CapexCue \u2014 Rogun Hydropower Plant (HPP) \u2014 dossier released 2026-10-15T14:03:33.421555+00:00, release 1 (ec7716b3-93ee-4461-9ab3-a644e5373574) \u2014 https://capexcue.com/projects/rogun-hydropower-plant-hpp-91641fc4-a81/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 346, "start": 0, "sources": [{"url": "https://www.worldbank.org/en/news/press-release/2026/06/30/advancing-energy-security-and-jobs-through-the-transformative-rogun-hydropower-project", "name": "www.worldbank.org", "origin": "live", "checksum": "8e24df8b73e11ebdecdd48c0600219bd19b86e9ea7835962cc17cb130966ac85", "observed_at": "2026-10-15T11:37:04.659684+00:00", "revision_id": "861421af-b3ca-44e7-9968-fcf9f2fdbab5", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "The second phase of financing will fund civil works, electromechanical equipment for power generation, and implementation support, including quality control, safety, environmental and social measures (including resettlement and livelihood restoration), and monitoring and forecasting for reservoir operations and downstream flood-risk management.", "statement": "The second phase of financing will fund civil works, electromechanical equipment for power generation, and implementation support, including quality control, safety, environmental and social measures (including resettlement and livelihood restoration), and monitoring and forecasting for reservoir operations and downstream flood-risk management.", "qualifications": {"attribution": "www.worldbank.org"}}, "label": "Energy", "icon": "energy"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 346, "start": 0, "sources": [{"url": "https://www.worldbank.org/en/news/press-release/2026/06/30/advancing-energy-security-and-jobs-through-the-transformative-rogun-hydropower-project", "name": "www.worldbank.org", "origin": "live", "checksum": "8e24df8b73e11ebdecdd48c0600219bd19b86e9ea7835962cc17cb130966ac85", "observed_at": "2026-10-15T11:37:04.659684+00:00", "revision_id": "861421af-b3ca-44e7-9968-fcf9f2fdbab5", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "The second phase of financing will fund civil works, electromechanical equipment for power generation, and implementation support, including quality control, safety, environmental and social measures (including resettlement and livelihood restoration), and monitoring and forecasting for reservoir operations and downstream flood-risk management.", "statement": "The second phase of financing will fund civil works, electromechanical equipment for power generation, and implementation support, including quality control, safety, environmental and social measures (including resettlement and livelihood restoration), and monitoring and forecasting for reservoir operations and downstream flood-risk management.", "qualifications": {"attribution": "www.worldbank.org"}}}, "input_hash": "04d86ee4bd8e1d44fd29fd273d5b9c8d9e12f02c34009938172b5c2c47cb6d7c", "release_id": "ec7716b3-93ee-4461-9ab3-a644e5373574", "type_codes": ["hydropower"], "field_states": {"type": {"state": "accepted", "reason": "Tajikistan is explicit; Rogun hydroelectric financing covers physical generation works and safeguards, not a new completion claim."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "Tajikistan is explicit; Rogun hydroelectric financing covers physical generation works and safeguards, not a new completion claim."}, "category": {"state": "accepted", "reason": "Tajikistan is explicit; Rogun hydroelectric financing covers physical generation works and safeguards, not a new completion claim."}}, "region_codes": ["asia"], "release_hash": "468bfb516af472d61d6771f6cb5a5bda47d5e7ea1344ee9da254aee810825c39", "assessment_id": "21f79a9e-c558-4e50-9f3c-e23c08266e42", "country_codes": ["TJ"], "assessment_hash": "1bb01f27db1c13cb5e82fb0db4893e2fb2585bd58d0d0f11cce7a9b32a0a9ac6", "country_label": "Tajikistan", "region_label": "Asia", "type_labels": ["Hydropower"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}