# Construction of the Gafsa multidisciplinary hospital (page title); the project description refers to it as the Gafsa regional hospital.

Publisher: CapexCue
Canonical dossier: <https://capexcue.com/projects/construction-of-the-gafsa-multidisciplinary-hospital-page-title-the-project-description-refers-to-it-as-the-gafsa-region-cc4aeaf6-2c3/>
Dossier reference: release 1 (f5412e42-5609-4a5d-9f8c-f67dcfd37b37)

Released project intelligence

Oldest supporting observation: 2026-10-18T21:57:16.968447+00:00
Dossier released: 2026-10-18T22:30:26.574218+00:00
Source report dates and capture dates are listed per fact below; neither establishes an event date.

## Project summary

The project page describes the Gafsa multidisciplinary hospital in Tunisia as a roughly 410-bed regional public hospital, including 30 day places, planned for a 14-hectare site. SCET-TUNISIE reports architectural and technical studies and works supervision, including building services such as HVAC, plumbing, fire protection and medical gases. The page lists the period/status as “2024- En cours,” a cost of €66,300,000, and Agence Française de Développement under financing.

## Evidence limits and unknowns

- In the page snapshot observed 2026-10-18 (publication date not provided), the reviewed project text does not establish tender or procurement status, supplier availability, or whether equipment packages are separately tendered.

Current purchasing availability: unknown.
Source-dated plans do not establish current progress or available supplier packages.

## Project metadata

Country: Tunisia
Region: Middle East North Africa
Physical assets: Hospital
Derived from the exact released evidence; unresolved fields remain unclassified.

## Project category

Social infrastructure
Derived from the reviewed name statement; delivery stage remains unclassified.
Construction of the Gafsa multidisciplinary hospital (page title); the project description refers to it as the Gafsa regional hospital.
Source: www.scet-tunisie.com — https://www.scet-tunisie.com/projets/construction-de-lhopital-pluridisciplinaire-de-gafsa | published unknown | observed 2026-10-18T21:57:16.968447+00:00

Project overview
Oldest decisive evidence: 2026-10-18T21:57:16.968447+00:00
Newest evidence: 2026-10-18T21:57:16.968447+00:00
Knowledge reviewed: 2026-10-18T22:28:39.246300+00:00
Publication reviewed: 2026-10-18T22:30:12.847085+00:00

## Date
Project period/status shown as “2024- En cours” (2024—ongoing).
Status: reported
Attribution: www.scet-tunisie.com
Source: www.scet-tunisie.com — https://www.scet-tunisie.com/projets/construction-de-lhopital-pluridisciplinaire-de-gafsa | published unknown | observed 2026-10-18T21:57:16.968447+00:00

## Name
Construction of the Gafsa multidisciplinary hospital (page title); the project description refers to it as the Gafsa regional hospital.
Status: reported
Attribution: www.scet-tunisie.com
Source: www.scet-tunisie.com — https://www.scet-tunisie.com/projets/construction-de-lhopital-pluridisciplinaire-de-gafsa | published unknown | observed 2026-10-18T21:57:16.968447+00:00

## Scope
The page describes a hospital of approximately 38,419 m² gross floor area, approximately 410 beds including 30 day places, planned for a 14-hectare site.
Status: reported
Attribution: www.scet-tunisie.com
Source: www.scet-tunisie.com — https://www.scet-tunisie.com/projets/construction-de-lhopital-pluridisciplinaire-de-gafsa | published unknown | observed 2026-10-18T21:57:16.968447+00:00

## Sector
Regional public administrative hospital, described as under the oversight of the Ministry of Public Health.
Status: reported
Attribution: www.scet-tunisie.com
Source: www.scet-tunisie.com — https://www.scet-tunisie.com/projets/construction-de-lhopital-pluridisciplinaire-de-gafsa | published unknown | observed 2026-10-18T21:57:16.968447+00:00

## Finance
Agence Française de Développement is listed under “Financement.”
Status: reported
Attribution: www.scet-tunisie.com
Source: www.scet-tunisie.com — https://www.scet-tunisie.com/projets/construction-de-lhopital-pluridisciplinaire-de-gafsa | published unknown | observed 2026-10-18T21:57:16.968447+00:00

## Activity
SCET-TUNISIE reports architectural and technical studies and works supervision, covering architecture; civil works; external works and networks; HVAC, ventilation, plumbing, fire protection and medical gases; electrical systems; low-current systems; and HQE certification.
Status: reported
Attribution: www.scet-tunisie.com
Source: www.scet-tunisie.com — https://www.scet-tunisie.com/projets/construction-de-lhopital-pluridisciplinaire-de-gafsa | published unknown | observed 2026-10-18T21:57:16.968447+00:00

## Location
Gafsa, Tunisia.
Status: reported
Attribution: www.scet-tunisie.com
Source: www.scet-tunisie.com — https://www.scet-tunisie.com/projets/construction-de-lhopital-pluridisciplinaire-de-gafsa | published unknown | observed 2026-10-18T21:57:16.968447+00:00

## Investment
Listed project cost: €66,300,000.
Status: reported
Attribution: www.scet-tunisie.com
Source: www.scet-tunisie.com — https://www.scet-tunisie.com/projets/construction-de-lhopital-pluridisciplinaire-de-gafsa | published unknown | observed 2026-10-18T21:57:16.968447+00:00


## Cite this dossier

CapexCue — Construction of the Gafsa multidisciplinary hospital (page title); the project description refers to it as the Gafsa regional hospital. — dossier released 2026-10-18T22:30:26.574218+00:00, release 1 (f5412e42-5609-4a5d-9f8c-f67dcfd37b37) — https://capexcue.com/projects/construction-of-the-gafsa-multidisciplinary-hospital-page-title-the-project-description-refers-to-it-as-the-gafsa-region-cc4aeaf6-2c3/.

For current information and later dossier updates, visit <https://capexcue.com/projects/construction-of-the-gafsa-multidisciplinary-hospital-page-title-the-project-description-refers-to-it-as-the-gafsa-region-cc4aeaf6-2c3/>.
This file records the release identified above; the current dossier may change.