{"name": "Smithfield Battery Energy Storage System (BESS)", "slug": "smithfield-battery-energy-storage-system-bess-6bbbdd4d-abb", "as_of": "2026-10-17T19:03:30.269561+00:00", "depth": "basic", "facts": {"date": {"value": "Constructed and commissioned in 2025; achieved full commercial operations status on 14 November 2025.", "rights": "facts_only", "source": {"url": "https://www.iberdrola.com.au/our-assets/asset-map/firming-assets/smithfield-bess", "name": "www.iberdrola.com.au", "origin": "live", "checksum": "679177dfaaeaa427404aff6a5db2cf98d33e72f5efa40054b3fdc7f08a9689a8", "observed_at": "2026-10-17T18:37:01.662897+00:00", "revision_id": "1226ab2e-8bae-4293-b6ec-4cabcabd41d0", "published_at": null}, "locator": "/html/body/main/div[3]/section/div/div/div/p", "claim_id": "2406edb9-984b-4859-88b6-a91aabdfb558", "modality": "actual", "confidence": 0.9, "valid_from": null, "attribution": "www.iberdrola.com.au", "evidence_id": "19134d5a-8915-462a-a8aa-5eef2577e436", "valid_until": null, "assertion_id": "e141c77a-accc-482b-b785-a5f8aee99670", "temporal_expression": "", "extraction_confidence": 0.9}, "name": {"value": "Smithfield Battery Energy Storage System (BESS)", "rights": "facts_only", "source": {"url": "https://www.iberdrola.com.au/our-assets/asset-map/firming-assets/smithfield-bess", "name": "www.iberdrola.com.au", "origin": "live", "checksum": "679177dfaaeaa427404aff6a5db2cf98d33e72f5efa40054b3fdc7f08a9689a8", "observed_at": "2026-10-17T18:37:01.662897+00:00", "revision_id": "1226ab2e-8bae-4293-b6ec-4cabcabd41d0", "published_at": null}, "locator": "/html/body/main/div[1]/section/div[2]/div/div/div/h2", "claim_id": "ab65f1e0-7c4b-4275-bafb-69c8f3a79b47", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.iberdrola.com.au", "evidence_id": "139cb08a-35b1-479c-995f-602b50ce3756", "valid_until": null, "assertion_id": "9faa747e-2bf7-44b6-b651-fd8e051b0538", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "Battery energy storage facility rated at 65 MW / 130 MWh; 65 MW installed capacity and two-hour storage duration.", "rights": "facts_only", "source": {"url": "https://www.iberdrola.com.au/our-assets/asset-map/firming-assets/smithfield-bess", "name": "www.iberdrola.com.au", "origin": "live", "checksum": "679177dfaaeaa427404aff6a5db2cf98d33e72f5efa40054b3fdc7f08a9689a8", "observed_at": "2026-10-17T18:37:01.662897+00:00", "revision_id": "1226ab2e-8bae-4293-b6ec-4cabcabd41d0", "published_at": null}, "locator": "/html/body/main/div[2]/section/div/div[2]/div[1]/div/h5", "claim_id": "2170ce3d-4dff-4773-95f1-55b621a16faa", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.iberdrola.com.au", "evidence_id": "74792a65-288a-4344-ba68-45b03f5e3d14", "valid_until": null, "assertion_id": "a00323a8-cbc5-4a88-a60d-9b7ce589613c", "temporal_expression": "", "extraction_confidence": 0.9}, "activity": {"value": "Actively participates in all Frequency Control Ancillary Services (FCAS) markets.", "rights": "facts_only", "source": {"url": "https://www.iberdrola.com.au/our-assets/asset-map/firming-assets/smithfield-bess", "name": "www.iberdrola.com.au", "origin": "live", "checksum": "679177dfaaeaa427404aff6a5db2cf98d33e72f5efa40054b3fdc7f08a9689a8", "observed_at": "2026-10-17T18:37:01.662897+00:00", "revision_id": "1226ab2e-8bae-4293-b6ec-4cabcabd41d0", "published_at": null}, "locator": "/html/body/main/div[3]/section/div/div/div/p", "claim_id": "ca2b4f15-d48c-4be2-a41e-2510a021ce9a", "modality": "actual", "confidence": 0.9, "valid_from": null, "attribution": "www.iberdrola.com.au", "evidence_id": "19134d5a-8915-462a-a8aa-5eef2577e436", "valid_until": null, "assertion_id": "3e87f178-7f30-48dc-8fb4-eb07fe735393", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Smithfield, NSW, on Darug land, approximately 30 km from the Sydney CBD.", "rights": "facts_only", "source": {"url": "https://www.iberdrola.com.au/our-assets/asset-map/firming-assets/smithfield-bess", "name": "www.iberdrola.com.au", "origin": "live", "checksum": "679177dfaaeaa427404aff6a5db2cf98d33e72f5efa40054b3fdc7f08a9689a8", "observed_at": "2026-10-17T18:37:01.662897+00:00", "revision_id": "1226ab2e-8bae-4293-b6ec-4cabcabd41d0", "published_at": null}, "locator": "/html/body/main/div[3]/section/div/div/div/p", "claim_id": "37d37fe5-3eeb-42f1-bc80-57691b21b2ca", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.iberdrola.com.au", "evidence_id": "19134d5a-8915-462a-a8aa-5eef2577e436", "valid_until": null, "assertion_id": "0445ae8b-9ca4-4a1d-b274-64d3badeb870", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "4a3a7ec9-5b43-4e0c-bce2-926f33423585", "publication": {"local_only": false, "reviewed_at": "2026-10-17T19:04:34.129804+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "Smithfield BESS is a 65 MW / 130 MWh battery storage facility in Smithfield, NSW, on Darug land, approximately 30 km from the Sydney CBD. The source reports that it was constructed and commissioned in 2025, reached full commercial operations on 14 November 2025, and participates in all FCAS markets.", "schema_version": "1.0", "public_unknowns": ["Source observed 17 October 2026: the supplied text does not specify the asset owner or operator, procurement status, budget, supplier packages, or a next project milestone. The source does not establish an open buying window."], "evidence_observed_at": "2026-10-17T18:37:01.662897+00:00", "knowledge_reviewed_at": "2026-10-17T19:03:30.507590+00:00", "decisive_evidence_observed_at": "2026-10-17T18:37:01.662897+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Smithfield Battery Energy Storage System (BESS)", "original_project_title": "Smithfield Battery Energy Storage System (BESS)", "canonical_url": "https://capexcue.com/projects/smithfield-battery-energy-storage-system-bess-6bbbdd4d-abb/", "release": {"id": "a4c410ea-10f1-43c0-8c5e-d8d5ac36f095", "number": 1, "published_at": "2026-10-17T19:05:06.470011+00:00"}, "release_reference": "release 1 (a4c410ea-10f1-43c0-8c5e-d8d5ac36f095)", "current_dossier_url": "https://capexcue.com/projects/smithfield-battery-energy-storage-system-bess-6bbbdd4d-abb/", "citation": "CapexCue \u2014 Smithfield Battery Energy Storage System (BESS) \u2014 dossier released 2026-10-17T19:05:06.470011+00:00, release 1 (a4c410ea-10f1-43c0-8c5e-d8d5ac36f095) \u2014 https://capexcue.com/projects/smithfield-battery-energy-storage-system-bess-6bbbdd4d-abb/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 113, "start": 0, "sources": [{"url": "https://www.iberdrola.com.au/our-assets/asset-map/firming-assets/smithfield-bess", "name": "www.iberdrola.com.au", "origin": "live", "checksum": "679177dfaaeaa427404aff6a5db2cf98d33e72f5efa40054b3fdc7f08a9689a8", "observed_at": "2026-10-17T18:37:01.662897+00:00", "revision_id": "1226ab2e-8bae-4293-b6ec-4cabcabd41d0", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "Battery energy storage facility rated at 65 MW / 130 MWh; 65 MW installed capacity and two-hour storage duration.", "statement": "Battery energy storage facility rated at 65 MW / 130 MWh; 65 MW installed capacity and two-hour storage duration.", "qualifications": {"attribution": "www.iberdrola.com.au"}}, "label": "Energy", "icon": "energy"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 113, "start": 0, "sources": [{"url": "https://www.iberdrola.com.au/our-assets/asset-map/firming-assets/smithfield-bess", "name": "www.iberdrola.com.au", "origin": "live", "checksum": "679177dfaaeaa427404aff6a5db2cf98d33e72f5efa40054b3fdc7f08a9689a8", "observed_at": "2026-10-17T18:37:01.662897+00:00", "revision_id": "1226ab2e-8bae-4293-b6ec-4cabcabd41d0", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "Battery energy storage facility rated at 65 MW / 130 MWh; 65 MW installed capacity and two-hour storage duration.", "statement": "Battery energy storage facility rated at 65 MW / 130 MWh; 65 MW installed capacity and two-hour storage duration.", "qualifications": {"attribution": "www.iberdrola.com.au"}}}, "input_hash": "2fb205cece1244d6cd26c147abf2ba52290e5c7e8d298526f23d6e1cd9956e20", "release_id": "a4c410ea-10f1-43c0-8c5e-d8d5ac36f095", "type_codes": ["battery_storage"], "field_states": {"type": {"state": "accepted", "reason": "Smithfield, New South Wales near Sydney identifies Australia."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "Smithfield, New South Wales near Sydney identifies Australia."}, "category": {"state": "accepted", "reason": "Smithfield, New South Wales near Sydney identifies Australia."}}, "region_codes": ["oceania"], "release_hash": "f3e665d60b14a1bbb840556da08144390b2fc7cdaae035224f75ff22ea112e9f", "assessment_id": "1440c239-d702-4e3c-8bbf-c511467fc109", "country_codes": ["AU"], "assessment_hash": "08fdf19a86ee96c3ad600511c4fbd7387fae04a953a405bc26233f201b586c94", "country_label": "Australia", "region_label": "Oceania", "type_labels": ["Battery Storage"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}