{"name": "Fraser River Tunnel Project", "slug": "fraser-river-tunnel-project-9aca56be-355", "as_of": "2026-11-06T07:06:56.875858+00:00", "depth": "basic", "facts": {"name": {"value": "Fraser River Tunnel Project", "rights": "facts_only", "source": {"url": "https://www.infrastructurebc.com/project/fraser-river-tunnel-project/", "name": "Infrastructure BC, Fraser River Tunnel Project (retained observation 4 November 2026) (external transcript)", "origin": "snapshot", "checksum": "9027b8101d3bbfa0bed9cd81a299382d2e6a1ef5e4e038d2189c81e0bbc9d2a1", "observed_at": "2026-11-06T07:05:47.070799+00:00", "revision_id": "f52353aa-1d98-4a6f-b7d4-169f29d7e198", "published_at": null}, "locator": "bytes:85893:86210", "claim_id": "c060f3bf-28c5-49aa-a429-18b6ee41e15a", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "Infrastructure BC, Fraser River Tunnel Project (retained observation 4 November 2026) (external transcript)", "evidence_id": "16d7e702-de6d-4d68-a4af-980ba2c3ba9b", "valid_until": null, "assertion_id": "a892c72d-7abb-4af7-96ea-1392bbf6b1c7", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "Infrastructure BC describes a new eight-lane immersed tube tunnel that will replace the existing George Massey Tunnel. The new tunnel is described as having three vehicle lanes and one dedicated transit lane in each direction, plus a separated active transportation corridor for cyclists and pedestrians. The project also includes replacing the Deas Slough Bridge and decommissioning the existing tunnel once the new immersed tube tunnel is in operation.", "rights": "facts_only", "source": {"url": "https://www.infrastructurebc.com/project/fraser-river-tunnel-project/", "name": "Infrastructure BC, Fraser River Tunnel Project (retained observation 4 November 2026) (external transcript)", "origin": "snapshot", "checksum": "9027b8101d3bbfa0bed9cd81a299382d2e6a1ef5e4e038d2189c81e0bbc9d2a1", "observed_at": "2026-11-06T07:05:47.070799+00:00", "revision_id": "f52353aa-1d98-4a6f-b7d4-169f29d7e198", "published_at": null}, "locator": "bytes:85893:86210", "claim_id": "b0b77718-a71c-422b-8f1e-b7e18083b5d9", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "Infrastructure BC, Fraser River Tunnel Project (retained observation 4 November 2026) (external transcript)", "evidence_id": "16d7e702-de6d-4d68-a4af-980ba2c3ba9b", "valid_until": null, "assertion_id": "ced49db2-ee09-4652-bebd-036ea3fbdbfb", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Highway 99, with the existing George Massey Tunnel identified as the tunnel to be replaced.", "rights": "facts_only", "source": {"url": "https://www.infrastructurebc.com/project/fraser-river-tunnel-project/", "name": "Infrastructure BC, Fraser River Tunnel Project (retained observation 4 November 2026) (external transcript)", "origin": "snapshot", "checksum": "9027b8101d3bbfa0bed9cd81a299382d2e6a1ef5e4e038d2189c81e0bbc9d2a1", "observed_at": "2026-11-06T07:05:47.070799+00:00", "revision_id": "f52353aa-1d98-4a6f-b7d4-169f29d7e198", "published_at": null}, "locator": "bytes:85893:86210", "claim_id": "1db9e93b-9f56-4280-9e4f-c168c93bc3f7", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "Infrastructure BC, Fraser River Tunnel Project (retained observation 4 November 2026) (external transcript)", "evidence_id": "16d7e702-de6d-4d68-a4af-980ba2c3ba9b", "valid_until": null, "assertion_id": "9f767b26-bc0e-4fbe-a47a-56a540c694d2", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "4db516b2-f458-4c6c-881b-3a2424ea3c13", "publication": {"local_only": false, "reviewed_at": "2026-11-06T07:07:46.640477+00:00", "indexability": "noindex", "buying_window": "unknown", "decision_rule": "shared-basic-public-v1", "policy_version": "research-selected-basic-public-v1", "derived_metadata": {"type": {"state": "accepted", "values": ["road"], "support": ["scope"]}, "country": {"state": "unknown_after_assessment", "values": [], "support": ["location"]}, "category": {"state": "accepted", "value": "transport_logistics", "support": ["scope"]}}, "template_version": "dossier-v1"}, "public_summary": "Infrastructure BC describes the Fraser River Tunnel Project as a planned replacement for the George Massey Tunnel on Highway 99. The described scope includes a new eight-lane immersed tube tunnel, replacement of the Deas Slough Bridge, and decommissioning of the existing tunnel once the new tunnel is operating.", "schema_version": "1.0", "public_unknowns": ["The selected excerpts do not establish the country, publication date, schedule, cost, current progress, opening or completion date, or procurement status.", "Reading scope: this page is based on selected project-description and scope excerpts from Infrastructure BC. The original document was not supplied or authenticated, and the whole document was not reviewed."], "evidence_observed_at": "2026-11-04T14:04:22+00:00", "knowledge_reviewed_at": "2026-11-06T07:06:57.079277+00:00", "decisive_evidence_observed_at": "2026-11-04T14:04:22+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Fraser River Tunnel Project", "original_project_title": "Fraser River Tunnel Project", "canonical_url": "https://capexcue.com/projects/fraser-river-tunnel-project-9aca56be-355/", "release": {"id": "b04ea659-f8dd-4338-b3f7-f9b37c02d901", "number": 1, "published_at": "2026-11-06T07:07:46.927615+00:00"}, "release_reference": "release 1 (b04ea659-f8dd-4338-b3f7-f9b37c02d901)", "current_dossier_url": "https://capexcue.com/projects/fraser-river-tunnel-project-9aca56be-355/", "citation": "CapexCue \u2014 Fraser River Tunnel Project \u2014 dossier released 2026-11-06T07:07:46.927615+00:00, release 1 (b04ea659-f8dd-4338-b3f7-f9b37c02d901) \u2014 https://capexcue.com/projects/fraser-river-tunnel-project-9aca56be-355/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": null, "project_metadata": null, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}