{"name": "Petrobrazi refinery photovoltaic project", "slug": "petrobrazi-refinery-photovoltaic-project-ede3e430-e77", "as_of": "2026-10-18T15:50:48.348573+00:00", "depth": "basic", "facts": {"date": {"value": "The announcement is dated 13 February 2026.", "rights": "facts_only", "source": {"url": "https://www.omvpetrom.com/ro/media/stiri-recente/2026/omv-petrom-demareaza-un-proiect-fotovoltaic-la-rafinaria-petrobrazi", "name": "www.omvpetrom.com", "origin": "live", "checksum": "6b39b91266fbc4e2a644a82a16d36992ab65ede455052a7564d518268b2cb5fb", "observed_at": "2026-10-18T08:42:42.557791+00:00", "revision_id": "83465a27-c146-4779-a5e7-761859d9cd5c", "published_at": null}, "locator": "/html/body/main/section[2]/div/div/div[1]/div/p[1]", "claim_id": "9689d10f-3016-4c16-a492-6341550a377d", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.omvpetrom.com", "evidence_id": "649e9366-18cf-4f8e-b74f-8eaf93daafd9", "valid_until": null, "assertion_id": "27f47f75-0700-42b3-a2fe-a126ba982b90", "temporal_expression": "", "extraction_confidence": 0.9}, "name": {"value": "Petrobrazi refinery photovoltaic project", "rights": "facts_only", "source": {"url": "https://www.omvpetrom.com/ro/media/stiri-recente/2026/omv-petrom-demareaza-un-proiect-fotovoltaic-la-rafinaria-petrobrazi", "name": "www.omvpetrom.com", "origin": "live", "checksum": "6b39b91266fbc4e2a644a82a16d36992ab65ede455052a7564d518268b2cb5fb", "observed_at": "2026-10-18T08:42:42.557791+00:00", "revision_id": "83465a27-c146-4779-a5e7-761859d9cd5c", "published_at": null}, "locator": "/html/body/main/section[1]/div/h1", "claim_id": "7232c5ee-3bd2-4faa-ba78-9a2563dc0bc7", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.omvpetrom.com", "evidence_id": "8fcf01c0-1676-4677-9164-90d11a6c3b00", "valid_until": null, "assertion_id": "03771ec4-c374-4409-96fc-4bd5c1ed26d2", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "A planned photovoltaic park with approximately 7 MW of installed capacity, covering about 110,000 m\u00b2 within the refinery and supplying renewable electricity for the refinery\u2019s internal consumption. The described scope includes equipment and materials procurement, construction and installation, and integration with the refinery\u2019s electrical infrastructure, including connection to its internal grid.", "rights": "facts_only", "source": {"url": "https://www.omvpetrom.com/ro/media/stiri-recente/2026/omv-petrom-demareaza-un-proiect-fotovoltaic-la-rafinaria-petrobrazi", "name": "www.omvpetrom.com", "origin": "live", "checksum": "6b39b91266fbc4e2a644a82a16d36992ab65ede455052a7564d518268b2cb5fb", "observed_at": "2026-10-18T08:42:42.557791+00:00", "revision_id": "83465a27-c146-4779-a5e7-761859d9cd5c", "published_at": null}, "locator": "/html/body/main/div[1]/article/div[2]/div/section/div/div/div/div/ul/li[1]", "claim_id": "9a83ea6d-ad33-492c-83a3-69c536a07818", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "www.omvpetrom.com", "evidence_id": "da21717a-603b-472d-b32c-0eff508b15b3", "valid_until": null, "assertion_id": "97b79ed6-c4e8-4ca5-a125-d61229c2b90f", "temporal_expression": "", "extraction_confidence": 0.9}, "sector": {"value": "Renewable electricity generation for refinery self-consumption.", "rights": "facts_only", "source": {"url": "https://www.omvpetrom.com/ro/media/stiri-recente/2026/omv-petrom-demareaza-un-proiect-fotovoltaic-la-rafinaria-petrobrazi", "name": "www.omvpetrom.com", "origin": "live", "checksum": "6b39b91266fbc4e2a644a82a16d36992ab65ede455052a7564d518268b2cb5fb", "observed_at": "2026-10-18T08:42:42.557791+00:00", "revision_id": "83465a27-c146-4779-a5e7-761859d9cd5c", "published_at": null}, "locator": "/html/body/main/div[1]/article/div[2]/div/section/div/div/div/div/ul/li[1]", "claim_id": "00c257a8-858a-406a-bba0-44683601eadd", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "www.omvpetrom.com", "evidence_id": "da21717a-603b-472d-b32c-0eff508b15b3", "valid_until": null, "assertion_id": "0d426cf3-2c29-402b-a26f-c896e3c28b15", "temporal_expression": "", "extraction_confidence": 0.9}, "finance": {"value": "The project is co-financed through the Modernization Fund.", "rights": "facts_only", "source": {"url": "https://www.omvpetrom.com/ro/media/stiri-recente/2026/omv-petrom-demareaza-un-proiect-fotovoltaic-la-rafinaria-petrobrazi", "name": "www.omvpetrom.com", "origin": "live", "checksum": "6b39b91266fbc4e2a644a82a16d36992ab65ede455052a7564d518268b2cb5fb", "observed_at": "2026-10-18T08:42:42.557791+00:00", "revision_id": "83465a27-c146-4779-a5e7-761859d9cd5c", "published_at": null}, "locator": "/html/body/main/div[1]/article/div[2]/div/section/div/div/div/div/ul/li[3]", "claim_id": "4d25add6-de0c-4144-832b-0f286bcf264b", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.omvpetrom.com", "evidence_id": "9a8d204f-618a-4db9-a180-8c886223fd19", "valid_until": null, "assertion_id": "52dd660c-f397-49ac-a78d-1bc5e4ef22c1", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Within the Petrobrazi refinery site; the source does not specify a city or country.", "rights": "facts_only", "source": {"url": "https://www.omvpetrom.com/ro/media/stiri-recente/2026/omv-petrom-demareaza-un-proiect-fotovoltaic-la-rafinaria-petrobrazi", "name": "www.omvpetrom.com", "origin": "live", "checksum": "6b39b91266fbc4e2a644a82a16d36992ab65ede455052a7564d518268b2cb5fb", "observed_at": "2026-10-18T08:42:42.557791+00:00", "revision_id": "83465a27-c146-4779-a5e7-761859d9cd5c", "published_at": null}, "locator": "/html/body/main/section[1]/div/h1", "claim_id": "68d7e89c-73df-46f8-96f4-8a58485fd89e", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.omvpetrom.com", "evidence_id": "8fcf01c0-1676-4677-9164-90d11a6c3b00", "valid_until": null, "assertion_id": "cb7cc83e-66dd-4263-89ef-5f0a4bcc4f9f", "temporal_expression": "", "extraction_confidence": 0.9}, "operator": {"value": "OMV Petrom is to operate the park.", "rights": "facts_only", "source": {"url": "https://www.omvpetrom.com/ro/media/stiri-recente/2026/omv-petrom-demareaza-un-proiect-fotovoltaic-la-rafinaria-petrobrazi", "name": "www.omvpetrom.com", "origin": "live", "checksum": "6b39b91266fbc4e2a644a82a16d36992ab65ede455052a7564d518268b2cb5fb", "observed_at": "2026-10-18T08:42:42.557791+00:00", "revision_id": "83465a27-c146-4779-a5e7-761859d9cd5c", "published_at": null}, "locator": "/html/body/main/div[1]/article/div[2]/div/section/div/div/div/div/p[5]", "claim_id": "08f619b3-7980-4931-9de0-1aa437986cd0", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "www.omvpetrom.com", "evidence_id": "384b8952-ed49-41d3-a539-49249b1c2915", "valid_until": null, "assertion_id": "e8b0acb7-5b9d-4c3e-b949-0560f2cce79a", "temporal_expression": "", "extraction_confidence": 0.9}, "developer": {"value": "OMV Petrom is to construct the photovoltaic park.", "rights": "facts_only", "source": {"url": "https://www.omvpetrom.com/ro/media/stiri-recente/2026/omv-petrom-demareaza-un-proiect-fotovoltaic-la-rafinaria-petrobrazi", "name": "www.omvpetrom.com", "origin": "live", "checksum": "6b39b91266fbc4e2a644a82a16d36992ab65ede455052a7564d518268b2cb5fb", "observed_at": "2026-10-18T08:42:42.557791+00:00", "revision_id": "83465a27-c146-4779-a5e7-761859d9cd5c", "published_at": null}, "locator": "/html/body/main/div[1]/article/div[2]/div/section/div/div/div/div/p[1]", "claim_id": "44053a16-adac-4e19-8b6d-8efb750cfd0f", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "www.omvpetrom.com", "evidence_id": "4f2b56eb-bf3f-446d-9df6-12da804ca40d", "valid_until": null, "assertion_id": "c92a0a31-16c5-45eb-b2d9-26f018de359e", "temporal_expression": "", "extraction_confidence": 0.9}, "investment": {"value": "Project budget of up to RON 45.4 million, including VAT.", "rights": "facts_only", "source": {"url": "https://www.omvpetrom.com/ro/media/stiri-recente/2026/omv-petrom-demareaza-un-proiect-fotovoltaic-la-rafinaria-petrobrazi", "name": "www.omvpetrom.com", "origin": "live", "checksum": "6b39b91266fbc4e2a644a82a16d36992ab65ede455052a7564d518268b2cb5fb", "observed_at": "2026-10-18T08:42:42.557791+00:00", "revision_id": "83465a27-c146-4779-a5e7-761859d9cd5c", "published_at": null}, "locator": "/html/body/main/div[1]/article/div[2]/div/section/div/div/div/div/p[4]", "claim_id": "e672ef85-3e05-4717-98f2-a29e745f7d08", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.omvpetrom.com", "evidence_id": "df6ca7b5-943c-4af6-b98d-bf7a189d2f81", "valid_until": null, "assertion_id": "eb6cbcdf-8041-414f-938c-75ccffabb044", "temporal_expression": "", "extraction_confidence": 0.9}, "procurement": {"value": "The Procurement, Construction and Commissioning contract was reported as awarded. The source does not identify the contractor.", "rights": "facts_only", "source": {"url": "https://www.omvpetrom.com/ro/media/stiri-recente/2026/omv-petrom-demareaza-un-proiect-fotovoltaic-la-rafinaria-petrobrazi", "name": "www.omvpetrom.com", "origin": "live", "checksum": "6b39b91266fbc4e2a644a82a16d36992ab65ede455052a7564d518268b2cb5fb", "observed_at": "2026-10-18T08:42:42.557791+00:00", "revision_id": "83465a27-c146-4779-a5e7-761859d9cd5c", "published_at": null}, "locator": "/html/body/main/div[1]/article/div[2]/div/section/div/div/div/div/p[5]", "claim_id": "46f5bd77-ea6e-4146-b6a7-42ad8c147380", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.omvpetrom.com", "evidence_id": "384b8952-ed49-41d3-a539-49249b1c2915", "valid_until": null, "assertion_id": "4288ff8c-57de-4a95-9ab9-c3510f7237f8", "temporal_expression": "", "extraction_confidence": 0.9}, "next_milestone": {"value": "Construction was expected to start in the period following the announcement and be completed during 2026.", "rights": "facts_only", "source": {"url": "https://www.omvpetrom.com/ro/media/stiri-recente/2026/omv-petrom-demareaza-un-proiect-fotovoltaic-la-rafinaria-petrobrazi", "name": "www.omvpetrom.com", "origin": "live", "checksum": "6b39b91266fbc4e2a644a82a16d36992ab65ede455052a7564d518268b2cb5fb", "observed_at": "2026-10-18T08:42:42.557791+00:00", "revision_id": "83465a27-c146-4779-a5e7-761859d9cd5c", "published_at": null}, "locator": "/html/body/main/section[2]/div/div/div[1]/div/p[1]", "claim_id": "42383eef-c415-42f4-903e-7fab484e9120", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "www.omvpetrom.com", "evidence_id": "649e9366-18cf-4f8e-b74f-8eaf93daafd9", "valid_until": null, "assertion_id": "490b0637-a69c-4010-8e05-4e064edc1d20", "temporal_expression": "", "extraction_confidence": 0.9}, "financing_amount": {"value": "RON 8.4 million is stated as provided through the Modernization Fund.", "rights": "facts_only", "source": {"url": "https://www.omvpetrom.com/ro/media/stiri-recente/2026/omv-petrom-demareaza-un-proiect-fotovoltaic-la-rafinaria-petrobrazi", "name": "www.omvpetrom.com", "origin": "live", "checksum": "6b39b91266fbc4e2a644a82a16d36992ab65ede455052a7564d518268b2cb5fb", "observed_at": "2026-10-18T08:42:42.557791+00:00", "revision_id": "83465a27-c146-4779-a5e7-761859d9cd5c", "published_at": null}, "locator": "/html/body/main/div[1]/article/div[2]/div/section/div/div/div/div/p[4]", "claim_id": "2b138db0-04ba-4bbd-90ed-e2adf17b2258", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.omvpetrom.com", "evidence_id": "df6ca7b5-943c-4af6-b98d-bf7a189d2f81", "valid_until": null, "assertion_id": "8372f977-70f1-43cf-b9b2-d47c4159e402", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "5187df6e-ea11-4f52-9b8c-a8f103d56f85", "publication": {"local_only": false, "reviewed_at": "2026-10-18T15:52:38.015885+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "OMV Petrom\u2019s announcement dated 13 February 2026 describes a planned photovoltaic park within the Petrobrazi refinery site, with approximately 7 MW of installed capacity and an intended role supplying the refinery\u2019s internal electricity use. The reported budget is up to RON 45.4 million including VAT, with RON 8.4 million stated as provided through the Modernization Fund. The Procurement, Construction and Commissioning contract was reported as awarded; the announcement expected construction to start in the following period and finish during 2026. These are source-dated plans, not confirmation of current project progress or completion.", "schema_version": "1.0", "public_unknowns": ["The source does not specify a city or country, detailed equipment specifications, or the awarded contractor.", "The announcement does not confirm whether the stated construction schedule was achieved or whether any supplier scope remains available."], "evidence_observed_at": "2026-10-18T08:42:42.557791+00:00", "knowledge_reviewed_at": "2026-10-18T15:50:48.816327+00:00", "decisive_evidence_observed_at": "2026-10-18T08:42:42.557791+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Petrobrazi refinery photovoltaic project", "original_project_title": "Petrobrazi refinery photovoltaic project", "canonical_url": "https://capexcue.com/projects/petrobrazi-refinery-photovoltaic-project-ede3e430-e77/", "release": {"id": "1e2be05b-1582-4c9c-a2b5-6dfa629b8e35", "number": 1, "published_at": "2026-10-18T15:54:04.386783+00:00"}, "release_reference": "release 1 (1e2be05b-1582-4c9c-a2b5-6dfa629b8e35)", "current_dossier_url": "https://capexcue.com/projects/petrobrazi-refinery-photovoltaic-project-ede3e430-e77/", "citation": "CapexCue \u2014 Petrobrazi refinery photovoltaic project \u2014 dossier released 2026-10-18T15:54:04.386783+00:00, release 1 (1e2be05b-1582-4c9c-a2b5-6dfa629b8e35) \u2014 https://capexcue.com/projects/petrobrazi-refinery-photovoltaic-project-ede3e430-e77/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 400, "start": 0, "sources": [{"url": "https://www.omvpetrom.com/ro/media/stiri-recente/2026/omv-petrom-demareaza-un-proiect-fotovoltaic-la-rafinaria-petrobrazi", "name": "www.omvpetrom.com", "origin": "live", "checksum": "6b39b91266fbc4e2a644a82a16d36992ab65ede455052a7564d518268b2cb5fb", "observed_at": "2026-10-18T08:42:42.557791+00:00", "revision_id": "83465a27-c146-4779-a5e7-761859d9cd5c", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "A planned photovoltaic park with approximately 7 MW of installed capacity, covering about 110,000 m\u00b2 within the refinery and supplying renewable electricity for the refinery\u2019s internal consumption. The described scope includes equipment and materials procurement, construction and installation, and integration with the refinery\u2019s electrical infrastructure, including connection to its internal grid.", "statement": "A planned photovoltaic park with approximately 7 MW of installed capacity, covering about 110,000 m\u00b2 within the refinery and supplying renewable electricity for the refinery\u2019s internal consumption. The described scope includes equipment and materials procurement, construction and installation, and integration with the refinery\u2019s electrical infrastructure, including connection to its internal grid.", "qualifications": {"attribution": "www.omvpetrom.com"}}, "label": "Energy", "icon": "energy"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 400, "start": 0, "sources": [{"url": "https://www.omvpetrom.com/ro/media/stiri-recente/2026/omv-petrom-demareaza-un-proiect-fotovoltaic-la-rafinaria-petrobrazi", "name": "www.omvpetrom.com", "origin": "live", "checksum": "6b39b91266fbc4e2a644a82a16d36992ab65ede455052a7564d518268b2cb5fb", "observed_at": "2026-10-18T08:42:42.557791+00:00", "revision_id": "83465a27-c146-4779-a5e7-761859d9cd5c", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "A planned photovoltaic park with approximately 7 MW of installed capacity, covering about 110,000 m\u00b2 within the refinery and supplying renewable electricity for the refinery\u2019s internal consumption. The described scope includes equipment and materials procurement, construction and installation, and integration with the refinery\u2019s electrical infrastructure, including connection to its internal grid.", "statement": "A planned photovoltaic park with approximately 7 MW of installed capacity, covering about 110,000 m\u00b2 within the refinery and supplying renewable electricity for the refinery\u2019s internal consumption. The described scope includes equipment and materials procurement, construction and installation, and integration with the refinery\u2019s electrical infrastructure, including connection to its internal grid.", "qualifications": {"attribution": "www.omvpetrom.com"}}}, "input_hash": "3376d10086b5964c52b9b8e29b7672460e2b8714bd21206f2dd5cd2c6e0d4bd6", "release_id": "1e2be05b-1582-4c9c-a2b5-6dfa629b8e35", "type_codes": ["solar_pv"], "field_states": {"type": {"state": "accepted", "reason": "The named Petrobrazi refinery identifies Romania; this project is its PV park rather than the entire refinery."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "The named Petrobrazi refinery identifies Romania; this project is its PV park rather than the entire refinery."}, "category": {"state": "accepted", "reason": "The named Petrobrazi refinery identifies Romania; this project is its PV park rather than the entire refinery."}}, "region_codes": ["europe"], "release_hash": "ee0c5be540a31f1bf3aa935107d77323c2672557c41d4be8fd8b9e45e248bc4c", "assessment_id": "83b6d29e-6e8e-4964-9305-fa0b88a92f1a", "country_codes": ["RO"], "assessment_hash": "23d343d86786b2a2deb2ff58f0e0d62bd1eb08aa14052d0eb96d0b49f524c99c", "country_label": "Romania", "region_label": "Europe", "type_labels": ["Solar PV"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}