## Project summary

OMV Petrom’s announcement dated 13 February 2026 describes a planned photovoltaic park within the Petrobrazi refinery site, with approximately 7 MW of installed capacity and an intended role supplying the refinery’s internal electricity use. The reported budget is up to RON 45.4 million including VAT, with RON 8.4 million stated as provided through the Modernization Fund. The Procurement, Construction and Commissioning contract was reported as awarded; the announcement expected construction to start in the following period and finish during 2026. These are source-dated plans, not confirmation of current project progress or completion.

## Evidence limits and unknowns

- The source does not specify a city or country, detailed equipment specifications, or the awarded contractor.
- The announcement does not confirm whether the stated construction schedule was achieved or whether any supplier scope remains available.

Current purchasing availability: unknown.
Source-dated plans do not establish current progress or available supplier packages.

## Project metadata

Country: Romania
Region: Europe
Physical assets: Solar PV
Derived from the exact released evidence; unresolved fields remain unclassified.

## Project category

Energy
Derived from the reviewed scope statement; delivery stage remains unclassified.
A planned photovoltaic park with approximately 7 MW of installed capacity, covering about 110,000 m² within the refinery and supplying renewable electricity for the refinery’s internal consumption. The described scope includes equipment and materials procurement, construction and installation, and integration with the refinery’s electrical infrastructure, including connection to its internal grid.
Source: www.omvpetrom.com — https://www.omvpetrom.com/ro/media/stiri-recente/2026/omv-petrom-demareaza-un-proiect-fotovoltaic-la-rafinaria-petrobrazi | published unknown | observed 2026-10-18T08:42:42.557791+00:00

Project overview
Oldest decisive evidence: 2026-10-18T08:42:42.557791+00:00
Newest evidence: 2026-10-18T08:42:42.557791+00:00
Knowledge reviewed: 2026-10-18T15:50:48.816327+00:00
Publication reviewed: 2026-10-18T15:52:38.015885+00:00

## Date
The announcement is dated 13 February 2026.
Status: reported
Attribution: www.omvpetrom.com
Source: www.omvpetrom.com — https://www.omvpetrom.com/ro/media/stiri-recente/2026/omv-petrom-demareaza-un-proiect-fotovoltaic-la-rafinaria-petrobrazi | published unknown | observed 2026-10-18T08:42:42.557791+00:00

## Name
Petrobrazi refinery photovoltaic project
Status: reported
Attribution: www.omvpetrom.com
Source: www.omvpetrom.com — https://www.omvpetrom.com/ro/media/stiri-recente/2026/omv-petrom-demareaza-un-proiect-fotovoltaic-la-rafinaria-petrobrazi | published unknown | observed 2026-10-18T08:42:42.557791+00:00

## Scope
A planned photovoltaic park with approximately 7 MW of installed capacity, covering about 110,000 m² within the refinery and supplying renewable electricity for the refinery’s internal consumption. The described scope includes equipment and materials procurement, construction and installation, and integration with the refinery’s electrical infrastructure, including connection to its internal grid.
Status: planned
Attribution: www.omvpetrom.com
Source: www.omvpetrom.com — https://www.omvpetrom.com/ro/media/stiri-recente/2026/omv-petrom-demareaza-un-proiect-fotovoltaic-la-rafinaria-petrobrazi | published unknown | observed 2026-10-18T08:42:42.557791+00:00

## Sector
Renewable electricity generation for refinery self-consumption.
Status: planned
Attribution: www.omvpetrom.com
Source: www.omvpetrom.com — https://www.omvpetrom.com/ro/media/stiri-recente/2026/omv-petrom-demareaza-un-proiect-fotovoltaic-la-rafinaria-petrobrazi | published unknown | observed 2026-10-18T08:42:42.557791+00:00

## Finance
The project is co-financed through the Modernization Fund.
Status: reported
Attribution: www.omvpetrom.com
Source: www.omvpetrom.com — https://www.omvpetrom.com/ro/media/stiri-recente/2026/omv-petrom-demareaza-un-proiect-fotovoltaic-la-rafinaria-petrobrazi | published unknown | observed 2026-10-18T08:42:42.557791+00:00

## Location
Within the Petrobrazi refinery site; the source does not specify a city or country.
Status: reported
Attribution: www.omvpetrom.com
Source: www.omvpetrom.com — https://www.omvpetrom.com/ro/media/stiri-recente/2026/omv-petrom-demareaza-un-proiect-fotovoltaic-la-rafinaria-petrobrazi | published unknown | observed 2026-10-18T08:42:42.557791+00:00

## Operator
OMV Petrom is to operate the park.
Status: planned
Attribution: www.omvpetrom.com
Source: www.omvpetrom.com — https://www.omvpetrom.com/ro/media/stiri-recente/2026/omv-petrom-demareaza-un-proiect-fotovoltaic-la-rafinaria-petrobrazi | published unknown | observed 2026-10-18T08:42:42.557791+00:00

## Developer
OMV Petrom is to construct the photovoltaic park.
Status: planned
Attribution: www.omvpetrom.com
Source: www.omvpetrom.com — https://www.omvpetrom.com/ro/media/stiri-recente/2026/omv-petrom-demareaza-un-proiect-fotovoltaic-la-rafinaria-petrobrazi | published unknown | observed 2026-10-18T08:42:42.557791+00:00

## Investment
Project budget of up to RON 45.4 million, including VAT.
Status: reported
Attribution: www.omvpetrom.com
Source: www.omvpetrom.com — https://www.omvpetrom.com/ro/media/stiri-recente/2026/omv-petrom-demareaza-un-proiect-fotovoltaic-la-rafinaria-petrobrazi | published unknown | observed 2026-10-18T08:42:42.557791+00:00

## Procurement
The Procurement, Construction and Commissioning contract was reported as awarded. The source does not identify the contractor.
Status: reported
Attribution: www.omvpetrom.com
Source: www.omvpetrom.com — https://www.omvpetrom.com/ro/media/stiri-recente/2026/omv-petrom-demareaza-un-proiect-fotovoltaic-la-rafinaria-petrobrazi | published unknown | observed 2026-10-18T08:42:42.557791+00:00

## Next Milestone
Construction was expected to start in the period following the announcement and be completed during 2026.
Status: planned
Attribution: www.omvpetrom.com
Source: www.omvpetrom.com — https://www.omvpetrom.com/ro/media/stiri-recente/2026/omv-petrom-demareaza-un-proiect-fotovoltaic-la-rafinaria-petrobrazi | published unknown | observed 2026-10-18T08:42:42.557791+00:00

## Financing Amount
RON 8.4 million is stated as provided through the Modernization Fund.
Status: reported
Attribution: www.omvpetrom.com
Source: www.omvpetrom.com — https://www.omvpetrom.com/ro/media/stiri-recente/2026/omv-petrom-demareaza-un-proiect-fotovoltaic-la-rafinaria-petrobrazi | published unknown | observed 2026-10-18T08:42:42.557791+00:00


## Cite this dossier

CapexCue — Petrobrazi refinery photovoltaic project — dossier released 2026-10-18T15:54:04.386783+00:00, release 1 (1e2be05b-1582-4c9c-a2b5-6dfa629b8e35) — https://capexcue.com/projects/petrobrazi-refinery-photovoltaic-project-ede3e430-e77/.

For current information and later dossier updates, visit <https://capexcue.com/projects/petrobrazi-refinery-photovoltaic-project-ede3e430-e77/>.
This file records the release identified above; the current dossier may change.