{"name": "Stanwell Battery, also referred to as the Stanwell big battery.", "slug": "stanwell-battery-also-referred-to-as-the-stanwell-big-battery-d6c574bb-f5d", "as_of": "2026-10-17T11:36:16.500145+00:00", "depth": "basic", "facts": {"name": {"value": "Stanwell Battery, also referred to as the Stanwell big battery.", "rights": "facts_only", "source": {"url": "https://www.stanwell.com/info-hub/article/mega-delivery-marks-major-milestone-for-stanwell-big-battery", "name": "www.stanwell.com", "origin": "live", "checksum": "dd3c8317aea8b92cf9889e165c89b5a72901e8432bf558fe71262565eb16f255", "observed_at": "2026-10-17T10:42:09.069873+00:00", "revision_id": "1809b075-4d60-4e64-ab2e-5dd2b9082a8a", "published_at": null}, "locator": "/html/body/div/div[2]/main/div/h1", "claim_id": "f9b5784e-0ae2-4847-8bbc-992ad2affc04", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.stanwell.com", "evidence_id": "42c9da34-25f2-427f-b7e5-3b36d52a31af", "valid_until": null, "assertion_id": "059f87d7-b20f-4982-b667-9e1bc39bfc22", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "Planned 324-unit battery energy storage system using Tesla Megapack units, described as 300 MW with four-hour duration (1,200 MWh).", "rights": "facts_only", "source": {"url": "https://www.stanwell.com/info-hub/article/mega-delivery-marks-major-milestone-for-stanwell-big-battery", "name": "www.stanwell.com", "origin": "live", "checksum": "dd3c8317aea8b92cf9889e165c89b5a72901e8432bf558fe71262565eb16f255", "observed_at": "2026-10-17T10:42:09.069873+00:00", "revision_id": "1809b075-4d60-4e64-ab2e-5dd2b9082a8a", "published_at": null}, "locator": "/html/body/div/div[2]/main/div/div/div[3]/div/p[3]", "claim_id": "7b564a2e-51cd-4237-9665-5d8248902d42", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "www.stanwell.com", "evidence_id": "6512729e-535a-4eec-bacf-6c21888b6390", "valid_until": null, "assertion_id": "ab3c4326-2a88-4150-aaf9-9094aac05ed0", "temporal_expression": "", "extraction_confidence": 0.9}, "sector": {"value": "Battery storage.", "rights": "facts_only", "source": {"url": "https://www.stanwell.com/info-hub/article/mega-delivery-marks-major-milestone-for-stanwell-big-battery", "name": "www.stanwell.com", "origin": "live", "checksum": "dd3c8317aea8b92cf9889e165c89b5a72901e8432bf558fe71262565eb16f255", "observed_at": "2026-10-17T10:42:09.069873+00:00", "revision_id": "1809b075-4d60-4e64-ab2e-5dd2b9082a8a", "published_at": null}, "locator": "/html/body/div/div[2]/main/div/div/div[2]/div/ul/li", "claim_id": "2e9b589f-b514-4ba7-8441-a3b1b98d41f9", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.stanwell.com", "evidence_id": "e2e0128f-f742-4ac8-a8d7-05deeced6935", "valid_until": null, "assertion_id": "760e7da8-8e42-46e0-9389-a3c3720f5f19", "temporal_expression": "", "extraction_confidence": 0.9}, "delivery": {"value": "The first consignment of Tesla Megapack 2XL units had safely arrived at the project site, according to the article dated 10 July 2025.", "rights": "facts_only", "source": {"url": "https://www.stanwell.com/info-hub/article/mega-delivery-marks-major-milestone-for-stanwell-big-battery", "name": "www.stanwell.com", "origin": "live", "checksum": "dd3c8317aea8b92cf9889e165c89b5a72901e8432bf558fe71262565eb16f255", "observed_at": "2026-10-17T10:42:09.069873+00:00", "revision_id": "1809b075-4d60-4e64-ab2e-5dd2b9082a8a", "published_at": null}, "locator": "/html/body/div/div[2]/main/div/div/div[1]/div/div[1]/span[2]/i/text-position:7", "claim_id": "b449ed5c-ea1b-4564-bdcb-db5519ed3259", "modality": "actual", "confidence": 0.9, "valid_from": null, "attribution": "www.stanwell.com", "evidence_id": "ebb4c355-ca2e-4194-bf5f-d818c0ff0b7b", "valid_until": null, "assertion_id": "67175949-92cd-4192-9985-ebe563adcd39", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Adjacent to Stanwell Power Station near Rockhampton, in Central Queensland.", "rights": "facts_only", "source": {"url": "https://www.stanwell.com/info-hub/article/mega-delivery-marks-major-milestone-for-stanwell-big-battery", "name": "www.stanwell.com", "origin": "live", "checksum": "dd3c8317aea8b92cf9889e165c89b5a72901e8432bf558fe71262565eb16f255", "observed_at": "2026-10-17T10:42:09.069873+00:00", "revision_id": "1809b075-4d60-4e64-ab2e-5dd2b9082a8a", "published_at": null}, "locator": "/html/body/div/div[2]/main/div/div/div[3]/div/p[1]", "claim_id": "6989aacc-a853-477e-893c-f7d7f4d2ffee", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.stanwell.com", "evidence_id": "2f2f4a3b-f36b-4469-a2ed-0b96eb8cadb7", "valid_until": null, "assertion_id": "530bb0da-eb51-4f38-abdc-cc2ad259fe84", "temporal_expression": "", "extraction_confidence": 0.9}, "contractor": {"value": "Yurika was reported as installing the Megapacks; several local contractors were also involved.", "rights": "facts_only", "source": {"url": "https://www.stanwell.com/info-hub/article/mega-delivery-marks-major-milestone-for-stanwell-big-battery", "name": "www.stanwell.com", "origin": "live", "checksum": "dd3c8317aea8b92cf9889e165c89b5a72901e8432bf558fe71262565eb16f255", "observed_at": "2026-10-17T10:42:09.069873+00:00", "revision_id": "1809b075-4d60-4e64-ab2e-5dd2b9082a8a", "published_at": null}, "locator": "/html/body/div/div[2]/main/div/div/div[3]/div/p[7]", "claim_id": "3ac64d2e-3ec9-4819-b3dc-aa491ad95015", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.stanwell.com", "evidence_id": "b71bf275-ed7f-41f5-99f0-2199768a8cd9", "valid_until": null, "assertion_id": "83fe5dce-769c-449b-923e-1ce514a4e373", "temporal_expression": "", "extraction_confidence": 0.9}, "next_milestone": {"value": "At the time of the 10 July 2025 article, commissioning was scheduled to commence in November 2025 and grid electricity supply was scheduled to start in May 2027; the source does not verify whether either occurred.", "rights": "facts_only", "source": {"url": "https://www.stanwell.com/info-hub/article/mega-delivery-marks-major-milestone-for-stanwell-big-battery", "name": "www.stanwell.com", "origin": "live", "checksum": "dd3c8317aea8b92cf9889e165c89b5a72901e8432bf558fe71262565eb16f255", "observed_at": "2026-10-17T10:42:09.069873+00:00", "revision_id": "1809b075-4d60-4e64-ab2e-5dd2b9082a8a", "published_at": null}, "locator": "/html/body/div/div[2]/main/div/div/div[1]/div/div[1]/span[2]/i/text-position:7", "claim_id": "dfb162bd-536c-4ac2-b2d1-e9bb719f7b9f", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "www.stanwell.com", "evidence_id": "ebb4c355-ca2e-4194-bf5f-d818c0ff0b7b", "valid_until": null, "assertion_id": "4fc03406-22ab-4031-92d3-2945e6e6b536", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "559e4d70-d8ab-4e56-9cbc-9a544515a643", "publication": {"local_only": false, "reviewed_at": "2026-10-17T11:37:36.249734+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "Stanwell Battery, also referred to as the Stanwell big battery, is adjacent to Stanwell Power Station near Rockhampton in Central Queensland. The 10 July 2025 article describes a planned 324-unit battery energy storage system rated at 300 MW with four-hour duration (1,200 MWh). It reports that the first Tesla Megapack 2XL consignment had arrived and that Yurika was installing the units. At the time of that article, commissioning was scheduled to commence in November 2025, with grid electricity supply scheduled to start in May 2027; those milestones are not verified by the supplied source.", "schema_version": "1.0", "public_unknowns": ["The 10 July 2025 article does not verify whether commissioning scheduled for November 2025 commenced or whether the planned grid-supply milestone has since been reached.", "The supplied source does not state procurement status, whether supplier packages are open, project budget, or purchasing timeline."], "evidence_observed_at": "2026-10-17T10:42:09.069873+00:00", "knowledge_reviewed_at": "2026-10-17T11:36:16.811933+00:00", "decisive_evidence_observed_at": "2026-10-17T10:42:09.069873+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Stanwell Battery, also referred to as the Stanwell big battery.", "original_project_title": "Stanwell Battery, also referred to as the Stanwell big battery.", "canonical_url": "https://capexcue.com/projects/stanwell-battery-also-referred-to-as-the-stanwell-big-battery-d6c574bb-f5d/", "release": {"id": "e139fa1d-a30a-4da2-8149-1a2d4ca35182", "number": 1, "published_at": "2026-10-17T11:38:14.155831+00:00"}, "release_reference": "release 1 (e139fa1d-a30a-4da2-8149-1a2d4ca35182)", "current_dossier_url": "https://capexcue.com/projects/stanwell-battery-also-referred-to-as-the-stanwell-big-battery-d6c574bb-f5d/", "citation": "CapexCue \u2014 Stanwell Battery, also referred to as the Stanwell big battery. \u2014 dossier released 2026-10-17T11:38:14.155831+00:00, release 1 (e139fa1d-a30a-4da2-8149-1a2d4ca35182) \u2014 https://capexcue.com/projects/stanwell-battery-also-referred-to-as-the-stanwell-big-battery-d6c574bb-f5d/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 16, "start": 0, "sources": [{"url": "https://www.stanwell.com/info-hub/article/mega-delivery-marks-major-milestone-for-stanwell-big-battery", "name": "www.stanwell.com", "origin": "live", "checksum": "dd3c8317aea8b92cf9889e165c89b5a72901e8432bf558fe71262565eb16f255", "observed_at": "2026-10-17T10:42:09.069873+00:00", "revision_id": "1809b075-4d60-4e64-ab2e-5dd2b9082a8a", "published_at": null}], "modality": "reported", "predicate": "sector", "raw_value": "Battery storage.", "statement": "Battery storage.", "qualifications": {"attribution": "www.stanwell.com"}}, "label": "Energy", "icon": "energy"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 16, "start": 0, "sources": [{"url": "https://www.stanwell.com/info-hub/article/mega-delivery-marks-major-milestone-for-stanwell-big-battery", "name": "www.stanwell.com", "origin": "live", "checksum": "dd3c8317aea8b92cf9889e165c89b5a72901e8432bf558fe71262565eb16f255", "observed_at": "2026-10-17T10:42:09.069873+00:00", "revision_id": "1809b075-4d60-4e64-ab2e-5dd2b9082a8a", "published_at": null}], "modality": "reported", "predicate": "sector", "raw_value": "Battery storage.", "statement": "Battery storage.", "qualifications": {"attribution": "www.stanwell.com"}}}, "input_hash": "efad810f3e65c45350ffdd70286f0f1167679db169b4631db90da75701885a2f", "release_id": "e139fa1d-a30a-4da2-8149-1a2d4ca35182", "type_codes": ["battery_storage"], "field_states": {"type": {"state": "accepted", "reason": "supported_physical_components"}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "Rockhampton, Central Queensland identifies Australia; battery is distinct from the existing Stanwell station."}, "category": {"state": "accepted", "reason": "supported_primary_category"}}, "region_codes": ["oceania"], "release_hash": "5dd68be0ceff9fde9476f06248ac52cae6b6a96c2f6feebbdf17cef1303bd676", "assessment_id": "634a6bde-0c3f-4f60-a34c-903d916e4346", "country_codes": ["AU"], "assessment_hash": "d82dbb777fd30832597006f9ac93cb056980c7d6c9e149c7fd236dd70d57db63", "country_label": "Australia", "region_label": "Oceania", "type_labels": ["Battery Storage"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}