{"name": "Ben M\u2019Hidi seawater desalination plant", "slug": "ben-mhidi-seawater-desalination-plant-0b4e4a3a-aa1", "as_of": "2026-10-17T18:01:42.314861+00:00", "depth": "basic", "facts": {"name": {"value": "Ben M\u2019Hidi seawater desalination plant", "rights": "facts_only", "source": {"url": "https://sonatrach.com/fr/lancement-du-chantier-de-realisation-de-la-station-de-dessalement-de-leau-de-mer-de-la-commune-de-ben-mhidi-wilaya-de-skikda/", "name": "sonatrach.com", "origin": "live", "checksum": "d26ab0eace9cba2d790bece0ca9479da0844ff4460f5c70d04b6718c7d62c0b5", "observed_at": "2026-10-17T17:21:45.597123+00:00", "revision_id": "a355a058-5b22-44be-98f9-dc772a40e879", "published_at": null}, "locator": "/html/body/div[1]/div[1]/div/div[2]/main/article/div/header/h1", "claim_id": "554a95ff-6877-47f7-97bf-b47232861196", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "sonatrach.com", "evidence_id": "fc6347d1-8122-4c5f-b181-838d133ca770", "valid_until": null, "assertion_id": "921149c4-48fc-4719-8ff9-891180302de1", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "Planned seawater desalination plant with future production capacity of 140,000 m\u00b3/day: 100,000 m\u00b3/day for the Skikda industrial zone and 40,000 m\u00b3/day for Alg\u00e9rienne des Eaux (ADE).", "rights": "facts_only", "source": {"url": "https://sonatrach.com/fr/lancement-du-chantier-de-realisation-de-la-station-de-dessalement-de-leau-de-mer-de-la-commune-de-ben-mhidi-wilaya-de-skikda/", "name": "sonatrach.com", "origin": "live", "checksum": "d26ab0eace9cba2d790bece0ca9479da0844ff4460f5c70d04b6718c7d62c0b5", "observed_at": "2026-10-17T17:21:45.597123+00:00", "revision_id": "a355a058-5b22-44be-98f9-dc772a40e879", "published_at": null}, "locator": "/html/body/div[1]/div[1]/div/div[2]/main/article/div/div/p[3]", "claim_id": "134018dd-23f1-432f-b0df-6ad8a2ea36c2", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "sonatrach.com", "evidence_id": "c08e74d8-f1b0-4443-a847-e6ab6c3cf022", "valid_until": null, "assertion_id": "ed7f44aa-568a-429b-8da4-56520a1dd626", "temporal_expression": "", "extraction_confidence": 0.9}, "activity": {"value": "Official launch of the construction site was reported on 14 July 2026.", "rights": "facts_only", "source": {"url": "https://sonatrach.com/fr/lancement-du-chantier-de-realisation-de-la-station-de-dessalement-de-leau-de-mer-de-la-commune-de-ben-mhidi-wilaya-de-skikda/", "name": "sonatrach.com", "origin": "live", "checksum": "d26ab0eace9cba2d790bece0ca9479da0844ff4460f5c70d04b6718c7d62c0b5", "observed_at": "2026-10-17T17:21:45.597123+00:00", "revision_id": "a355a058-5b22-44be-98f9-dc772a40e879", "published_at": null}, "locator": "/html/body/div[1]/div[1]/div/div[2]/main/article/div/header/div[1]/span/span/text-position:1", "claim_id": "b9932be5-0175-48cc-bbc1-100408ab0f7e", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "sonatrach.com", "evidence_id": "39fc9efc-1f3b-49fe-a8df-0fa8d75ae112", "valid_until": null, "assertion_id": "34fd3384-213f-49f1-931c-258110b170d8", "temporal_expression": "", "extraction_confidence": 0.9}, "delivery": {"value": "The stated execution period is not to exceed 24 months; the source gives no calendar completion date.", "rights": "facts_only", "source": {"url": "https://sonatrach.com/fr/lancement-du-chantier-de-realisation-de-la-station-de-dessalement-de-leau-de-mer-de-la-commune-de-ben-mhidi-wilaya-de-skikda/", "name": "sonatrach.com", "origin": "live", "checksum": "d26ab0eace9cba2d790bece0ca9479da0844ff4460f5c70d04b6718c7d62c0b5", "observed_at": "2026-10-17T17:21:45.597123+00:00", "revision_id": "a355a058-5b22-44be-98f9-dc772a40e879", "published_at": null}, "locator": "/html/body/div[1]/div[1]/div/div[2]/main/article/div/div/p[3]", "claim_id": "ac9654d4-8b76-4408-a84c-1f085731961b", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "sonatrach.com", "evidence_id": "c08e74d8-f1b0-4443-a847-e6ab6c3cf022", "valid_until": null, "assertion_id": "7a1c430a-1a3e-47c0-923f-5a16a10ccbd7", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Commune of Ben M\u2019Hidi, Wilaya of Skikda", "rights": "facts_only", "source": {"url": "https://sonatrach.com/fr/lancement-du-chantier-de-realisation-de-la-station-de-dessalement-de-leau-de-mer-de-la-commune-de-ben-mhidi-wilaya-de-skikda/", "name": "sonatrach.com", "origin": "live", "checksum": "d26ab0eace9cba2d790bece0ca9479da0844ff4460f5c70d04b6718c7d62c0b5", "observed_at": "2026-10-17T17:21:45.597123+00:00", "revision_id": "a355a058-5b22-44be-98f9-dc772a40e879", "published_at": null}, "locator": "/html/body/div[1]/div[1]/div/div[2]/main/article/div/header/h1", "claim_id": "40fd29a6-08de-4754-b336-f2eeb045d7b4", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "sonatrach.com", "evidence_id": "fc6347d1-8122-4c5f-b181-838d133ca770", "valid_until": null, "assertion_id": "55fc8df6-51b0-40d3-a3ca-5ec6397386da", "temporal_expression": "", "extraction_confidence": 0.9}, "contractor": {"value": "Entreprise Nationale de Canalisations (ENAC) is assigned execution of the works.", "rights": "facts_only", "source": {"url": "https://sonatrach.com/fr/lancement-du-chantier-de-realisation-de-la-station-de-dessalement-de-leau-de-mer-de-la-commune-de-ben-mhidi-wilaya-de-skikda/", "name": "sonatrach.com", "origin": "live", "checksum": "d26ab0eace9cba2d790bece0ca9479da0844ff4460f5c70d04b6718c7d62c0b5", "observed_at": "2026-10-17T17:21:45.597123+00:00", "revision_id": "a355a058-5b22-44be-98f9-dc772a40e879", "published_at": null}, "locator": "/html/body/div[1]/div[1]/div/div[2]/main/article/div/div/p[4]", "claim_id": "05ea40d8-4d85-4a1b-bcbb-26873a1df49f", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "sonatrach.com", "evidence_id": "80afe246-f781-4a45-b82c-a99037b661ef", "valid_until": null, "assertion_id": "41ac5809-6764-43b3-a033-0b66c5c69df0", "temporal_expression": "", "extraction_confidence": 0.9}, "implementing_agency": {"value": "Algerian Desalination Company (ADC) is entrusted with realization of the plant.", "rights": "facts_only", "source": {"url": "https://sonatrach.com/fr/lancement-du-chantier-de-realisation-de-la-station-de-dessalement-de-leau-de-mer-de-la-commune-de-ben-mhidi-wilaya-de-skikda/", "name": "sonatrach.com", "origin": "live", "checksum": "d26ab0eace9cba2d790bece0ca9479da0844ff4460f5c70d04b6718c7d62c0b5", "observed_at": "2026-10-17T17:21:45.597123+00:00", "revision_id": "a355a058-5b22-44be-98f9-dc772a40e879", "published_at": null}, "locator": "/html/body/div[1]/div[1]/div/div[2]/main/article/div/div/p[4]", "claim_id": "62ad505a-0783-4aea-b958-2a00ad1946df", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "sonatrach.com", "evidence_id": "80afe246-f781-4a45-b82c-a99037b661ef", "valid_until": null, "assertion_id": "6fe1313f-23aa-4e2e-aff9-0149bae3cbb6", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "5b03b947-c16f-4bef-9c42-f69659f5133c", "publication": {"local_only": false, "reviewed_at": "2026-10-17T18:03:42.284964+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "SONATRACH\u2019s notice dated 14 July 2026 reports the construction-site launch for the Ben M\u2019Hidi seawater desalination plant in Skikda. The planned capacity is 140,000 m\u00b3/day, split between the Skikda industrial zone and ADE. ADC is entrusted with realization of the plant, and ENAC with execution of the works. The stated execution period is no more than 24 months.", "schema_version": "1.0", "public_unknowns": ["The 14 July 2026 notice does not state a budget or financing, procurement or tender status, equipment package, or calendar completion date; it gives only a maximum execution period of 24 months."], "evidence_observed_at": "2026-10-17T17:21:45.597123+00:00", "knowledge_reviewed_at": "2026-10-17T18:01:42.596567+00:00", "decisive_evidence_observed_at": "2026-10-17T17:21:45.597123+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Ben M\u2019Hidi seawater desalination plant", "original_project_title": "Ben M\u2019Hidi seawater desalination plant", "canonical_url": "https://capexcue.com/projects/ben-mhidi-seawater-desalination-plant-0b4e4a3a-aa1/", "release": {"id": "9a80c326-59fb-435d-af76-de3fb3787784", "number": 1, "published_at": "2026-10-17T18:04:07.279676+00:00"}, "release_reference": "release 1 (9a80c326-59fb-435d-af76-de3fb3787784)", "current_dossier_url": "https://capexcue.com/projects/ben-mhidi-seawater-desalination-plant-0b4e4a3a-aa1/", "citation": "CapexCue \u2014 Ben M\u2019Hidi seawater desalination plant \u2014 dossier released 2026-10-17T18:04:07.279676+00:00, release 1 (9a80c326-59fb-435d-af76-de3fb3787784) \u2014 https://capexcue.com/projects/ben-mhidi-seawater-desalination-plant-0b4e4a3a-aa1/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "codex_retained_dossier_curation", "value": "water_environment", "support": {"end": 181, "start": 0, "sources": [{"url": "https://sonatrach.com/fr/lancement-du-chantier-de-realisation-de-la-station-de-dessalement-de-leau-de-mer-de-la-commune-de-ben-mhidi-wilaya-de-skikda/", "name": "sonatrach.com", "origin": "live", "checksum": "d26ab0eace9cba2d790bece0ca9479da0844ff4460f5c70d04b6718c7d62c0b5", "observed_at": "2026-10-17T17:21:45.597123+00:00", "revision_id": "a355a058-5b22-44be-98f9-dc772a40e879", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "Planned seawater desalination plant with future production capacity of 140,000 m\u00b3/day: 100,000 m\u00b3/day for the Skikda industrial zone and 40,000 m\u00b3/day for Alg\u00e9rienne des Eaux (ADE).", "statement": "Planned seawater desalination plant with future production capacity of 140,000 m\u00b3/day: 100,000 m\u00b3/day for the Skikda industrial zone and 40,000 m\u00b3/day for Alg\u00e9rienne des Eaux (ADE).", "qualifications": {"attribution": "sonatrach.com"}}, "label": "Water and environment", "icon": "water"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "codex_retained_dossier_curation", "value": "water_environment", "support": {"end": 181, "start": 0, "sources": [{"url": "https://sonatrach.com/fr/lancement-du-chantier-de-realisation-de-la-station-de-dessalement-de-leau-de-mer-de-la-commune-de-ben-mhidi-wilaya-de-skikda/", "name": "sonatrach.com", "origin": "live", "checksum": "d26ab0eace9cba2d790bece0ca9479da0844ff4460f5c70d04b6718c7d62c0b5", "observed_at": "2026-10-17T17:21:45.597123+00:00", "revision_id": "a355a058-5b22-44be-98f9-dc772a40e879", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "Planned seawater desalination plant with future production capacity of 140,000 m\u00b3/day: 100,000 m\u00b3/day for the Skikda industrial zone and 40,000 m\u00b3/day for Alg\u00e9rienne des Eaux (ADE).", "statement": "Planned seawater desalination plant with future production capacity of 140,000 m\u00b3/day: 100,000 m\u00b3/day for the Skikda industrial zone and 40,000 m\u00b3/day for Alg\u00e9rienne des Eaux (ADE).", "qualifications": {"attribution": "sonatrach.com"}}}, "input_hash": "4f833fd8f3e9eb33a97aea91e0e4bac1080a330f18ef064a20ce83a0e555f324", "release_id": "9a80c326-59fb-435d-af76-de3fb3787784", "type_codes": ["desalination"], "field_states": {"type": {"state": "accepted", "reason": "Ben M'Hidi, Skikda is in Algeria; the source specifies a planned seawater desalination plant."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "Ben M'Hidi, Skikda is in Algeria; the source specifies a planned seawater desalination plant."}, "category": {"state": "accepted", "reason": "Ben M'Hidi, Skikda is in Algeria; the source specifies a planned seawater desalination plant."}}, "region_codes": ["middle_east_north_africa"], "release_hash": "151ca0cbd9a45b050821999698a8850cb824805562f9f82e1143deafa9e80432", "assessment_id": "b58c1cc5-03e8-4b76-b6f8-97def263ebcb", "country_codes": ["DZ"], "assessment_hash": "86b5315f82e8b06b54e056bc70028d5db835f916088bf47d70b2c474a8836866", "country_label": "Algeria", "region_label": "Middle East North Africa", "type_labels": ["Desalination"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}