{"name": "Didcot BESS", "slug": "didcot-bess-26e6fb2a-138", "as_of": "2026-10-17T15:52:10.823861+00:00", "depth": "basic", "facts": {"name": {"value": "Didcot BESS", "rights": "facts_only", "source": {"url": "https://www.ekuenergy.com/en-gb/projects/didcot", "name": "www.ekuenergy.com", "origin": "live", "checksum": "739385ad9dd0d16943ad8c67cf5273b8d12c48e648ef3115f68d20a4816d398f", "observed_at": "2026-10-17T15:46:17.518642+00:00", "revision_id": "422ef456-9b37-4b47-a510-92a5b7afbffb", "published_at": null}, "locator": "/html/body/div[3]/div[1]/div[3]/div[1]/div[2]/h1", "claim_id": "10d983f1-62b8-40ec-ac02-f5adba83f702", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.ekuenergy.com", "evidence_id": "250f938b-1210-45bb-95d2-9486ba4ca8ed", "valid_until": null, "assertion_id": "a79b4bfb-0f78-42c1-98de-ffefec36b63d", "temporal_expression": "", "extraction_confidence": 0.9}, "owner": {"value": "Eku Energy reports that it acquired the project from TBC Partners in July; the year is not specified in that statement.", "rights": "facts_only", "source": {"url": "https://www.ekuenergy.com/en-gb/projects/didcot", "name": "www.ekuenergy.com", "origin": "live", "checksum": "739385ad9dd0d16943ad8c67cf5273b8d12c48e648ef3115f68d20a4816d398f", "observed_at": "2026-10-17T15:46:17.518642+00:00", "revision_id": "422ef456-9b37-4b47-a510-92a5b7afbffb", "published_at": null}, "locator": "/html/body/div[3]/div[2]/div[1]/div[2]/p[3]", "claim_id": "6147fa6b-91f6-4dad-b223-be90054955e3", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.ekuenergy.com", "evidence_id": "c434d670-74b7-414a-98bd-5db149c46659", "valid_until": null, "assertion_id": "4c22a2f0-0f2d-4ba5-b903-5c48059c6d4c", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "A 300 MW / 600 MWh battery energy storage system that will connect to the UK National Grid via an underground cable to nearby Didcot Substation, south-west of the site.", "rights": "facts_only", "source": {"url": "https://www.ekuenergy.com/en-gb/projects/didcot", "name": "www.ekuenergy.com", "origin": "live", "checksum": "739385ad9dd0d16943ad8c67cf5273b8d12c48e648ef3115f68d20a4816d398f", "observed_at": "2026-10-17T15:46:17.518642+00:00", "revision_id": "422ef456-9b37-4b47-a510-92a5b7afbffb", "published_at": null}, "locator": "/html/body/div[3]/div[2]/div[1]/div[2]/p[1]", "claim_id": "84e837f7-1ab2-443c-8746-82c1bc28c996", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "www.ekuenergy.com", "evidence_id": "900d900c-b27b-4376-bcdc-e5dbfcd9e276", "valid_until": null, "assertion_id": "a6cbd70e-ef96-48c6-bb18-ba5111e14c4c", "temporal_expression": "", "extraction_confidence": 0.9}, "sector": {"value": "Battery energy storage", "rights": "facts_only", "source": {"url": "https://www.ekuenergy.com/en-gb/projects/didcot", "name": "www.ekuenergy.com", "origin": "live", "checksum": "739385ad9dd0d16943ad8c67cf5273b8d12c48e648ef3115f68d20a4816d398f", "observed_at": "2026-10-17T15:46:17.518642+00:00", "revision_id": "422ef456-9b37-4b47-a510-92a5b7afbffb", "published_at": null}, "locator": "/html/body/div[3]/div[1]/div[3]/div[1]/div[2]/h1", "claim_id": "0cb24e99-7696-4da1-8568-6fc989d1da56", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.ekuenergy.com", "evidence_id": "250f938b-1210-45bb-95d2-9486ba4ca8ed", "valid_until": null, "assertion_id": "59003d36-1778-4769-9170-064876fbd332", "temporal_expression": "", "extraction_confidence": 0.9}, "activity": {"value": "The page lists the current status as Development.", "rights": "facts_only", "source": {"url": "https://www.ekuenergy.com/en-gb/projects/didcot", "name": "www.ekuenergy.com", "origin": "live", "checksum": "739385ad9dd0d16943ad8c67cf5273b8d12c48e648ef3115f68d20a4816d398f", "observed_at": "2026-10-17T15:46:17.518642+00:00", "revision_id": "422ef456-9b37-4b47-a510-92a5b7afbffb", "published_at": null}, "locator": "/html/body/div[3]/div[2]/div[2]/div/div[1]/div[6]/div[1]/text-position:128", "claim_id": "a0539a47-33b8-42c8-a8b0-b62ef3fa1aca", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.ekuenergy.com", "evidence_id": "ce9d16e3-218f-49ff-a5ff-1ccc69bc7d34", "valid_until": null, "assertion_id": "c684623b-3337-4303-81ad-5651c56e8561", "temporal_expression": "", "extraction_confidence": 0.9}, "delivery": {"value": "Connection is scheduled for 2028.", "rights": "facts_only", "source": {"url": "https://www.ekuenergy.com/en-gb/projects/didcot", "name": "www.ekuenergy.com", "origin": "live", "checksum": "739385ad9dd0d16943ad8c67cf5273b8d12c48e648ef3115f68d20a4816d398f", "observed_at": "2026-10-17T15:46:17.518642+00:00", "revision_id": "422ef456-9b37-4b47-a510-92a5b7afbffb", "published_at": null}, "locator": "/html/body/div[3]/div[2]/div[1]/div[2]/p[2]", "claim_id": "108eea07-e3e6-4771-b5ef-d60c0cf760c9", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "www.ekuenergy.com", "evidence_id": "d6efcacd-0297-407f-b081-4273b8f32fcc", "valid_until": null, "assertion_id": "06d59963-cef9-4179-992f-5dec2d2d510b", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Oxfordshire, United Kingdom", "rights": "facts_only", "source": {"url": "https://www.ekuenergy.com/en-gb/projects/didcot", "name": "www.ekuenergy.com", "origin": "live", "checksum": "739385ad9dd0d16943ad8c67cf5273b8d12c48e648ef3115f68d20a4816d398f", "observed_at": "2026-10-17T15:46:17.518642+00:00", "revision_id": "422ef456-9b37-4b47-a510-92a5b7afbffb", "published_at": null}, "locator": "/html/body/div[3]/div[2]/div[2]/div/div[1]/div[2]/div[1]/text-position:124", "claim_id": "e1dae02f-b311-49ba-981d-ea606354f55b", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.ekuenergy.com", "evidence_id": "805ffe7b-6bde-442b-9291-252f6a0eb661", "valid_until": null, "assertion_id": "edce3aff-6252-4323-9bc3-e6211b66d2a9", "temporal_expression": "", "extraction_confidence": 0.9}, "next_milestone": {"value": "Construction is stated to be set to begin \u201clater this year\u201d; the year is not specified in that statement.", "rights": "facts_only", "source": {"url": "https://www.ekuenergy.com/en-gb/projects/didcot", "name": "www.ekuenergy.com", "origin": "live", "checksum": "739385ad9dd0d16943ad8c67cf5273b8d12c48e648ef3115f68d20a4816d398f", "observed_at": "2026-10-17T15:46:17.518642+00:00", "revision_id": "422ef456-9b37-4b47-a510-92a5b7afbffb", "published_at": null}, "locator": "/html/body/div[3]/div[2]/div[1]/div[2]/p[2]", "claim_id": "24df5409-0903-4444-abc9-62955bd3619c", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "www.ekuenergy.com", "evidence_id": "d6efcacd-0297-407f-b081-4273b8f32fcc", "valid_until": null, "assertion_id": "65a407ca-9cc4-4731-86c9-965ca1d4be10", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "5f9eeeaf-a6cf-496d-98c3-eba34380f0d2", "publication": {"local_only": false, "reviewed_at": "2026-10-17T15:54:41.933154+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "Didcot BESS is a planned 300 MW / 600 MWh battery energy storage project in Oxfordshire, United Kingdom. The project is intended to connect to the UK National Grid through an underground cable to nearby Didcot Substation, south-west of the site. Eku Energy\u2019s page lists the status as Development; it gives a construction target later in the year without specifying the year, and schedules connection for 2028. The page also reports Eku Energy acquired the project from TBC Partners in July, but does not specify the year.", "schema_version": "1.0", "public_unknowns": ["The source does not identify an EPC contractor, project budget, procurement route, or supplier packages available for procurement; its Partners section shows no partner entries."], "evidence_observed_at": "2026-10-17T15:46:17.518642+00:00", "knowledge_reviewed_at": "2026-10-17T15:52:11.321915+00:00", "decisive_evidence_observed_at": "2026-10-17T15:46:17.518642+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Didcot BESS", "original_project_title": "Didcot BESS", "canonical_url": "https://capexcue.com/projects/didcot-bess-26e6fb2a-138/", "release": {"id": "73953769-c08c-4b91-941a-fee1ab45006b", "number": 1, "published_at": "2026-10-17T15:55:08.111112+00:00"}, "release_reference": "release 1 (73953769-c08c-4b91-941a-fee1ab45006b)", "current_dossier_url": "https://capexcue.com/projects/didcot-bess-26e6fb2a-138/", "citation": "CapexCue \u2014 Didcot BESS \u2014 dossier released 2026-10-17T15:55:08.111112+00:00, release 1 (73953769-c08c-4b91-941a-fee1ab45006b) \u2014 https://capexcue.com/projects/didcot-bess-26e6fb2a-138/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "metadata_assessment", "value": "energy", "support": {"end": 22, "start": 0, "sources": [{"url": "https://www.ekuenergy.com/en-gb/projects/didcot", "name": "www.ekuenergy.com", "origin": "live", "checksum": "739385ad9dd0d16943ad8c67cf5273b8d12c48e648ef3115f68d20a4816d398f", "observed_at": "2026-10-17T15:46:17.518642+00:00", "revision_id": "422ef456-9b37-4b47-a510-92a5b7afbffb", "published_at": null}], "modality": "reported", "predicate": "sector", "raw_value": "Battery energy storage", "statement": "Battery energy storage", "qualifications": {"attribution": "www.ekuenergy.com"}}, "label": "Energy", "icon": "energy"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "metadata_assessment", "value": "energy", "support": {"end": 22, "start": 0, "sources": [{"url": "https://www.ekuenergy.com/en-gb/projects/didcot", "name": "www.ekuenergy.com", "origin": "live", "checksum": "739385ad9dd0d16943ad8c67cf5273b8d12c48e648ef3115f68d20a4816d398f", "observed_at": "2026-10-17T15:46:17.518642+00:00", "revision_id": "422ef456-9b37-4b47-a510-92a5b7afbffb", "published_at": null}], "modality": "reported", "predicate": "sector", "raw_value": "Battery energy storage", "statement": "Battery energy storage", "qualifications": {"attribution": "www.ekuenergy.com"}}}, "input_hash": "c438eea81e3b2e86764360b07606005d70024d521b1e00228ac95a2ca6b04c9b", "release_id": "73953769-c08c-4b91-941a-fee1ab45006b", "type_codes": ["battery_storage"], "field_states": {"type": {"state": "accepted", "reason": "supported_physical_components"}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "supported_physical_country"}, "category": {"state": "accepted", "reason": "supported_primary_category"}}, "region_codes": ["europe"], "release_hash": "190911e6b60ea25be33b718903f19b75f8fabdd581e3c54437896abfd08d8396", "assessment_id": "43989eb5-4e68-49f4-9deb-4faa46bc1744", "country_codes": ["GB"], "assessment_hash": "1db14cfea0d50ec4b9a378951cc2bcbdcfd2c5eb9b93b16d0833f642f8d825bd", "country_label": "United Kingdom", "region_label": "Europe", "type_labels": ["Battery Storage"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}