{"name": "The page title and heading call the asset \u201cShuaibah 2 IWP (STPC)\u201d; the project description calls it \u201cShuaibah-3 Expansion II \u2013 IWP Project.\u201d The source does not clarify the difference between these labels.", "slug": "the-page-title-and-heading-call-the-asset-shuaibah-2-iwp-stpc-the-project-description-calls-it-shuaibah-3-expansion-ii-i-3b640d9c-e7c", "as_of": "2026-10-18T08:04:51.392352+00:00", "depth": "basic", "facts": {"date": {"value": "Commercial operations date: Q2 2019.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/shuaibah-2-iwp-stpc/", "name": "acwapower.com", "origin": "live", "checksum": "8d2cd08963ab45aec5a7be39b4818f62dce0a0e87f661b524ddecdc765191d69", "observed_at": "2026-10-18T07:27:15.330877+00:00", "revision_id": "b5c66e5f-bce3-469c-b75d-9b069c275a98", "published_at": null}, "locator": "/html/head/main/div/section[4]/div/ul/li[7]", "claim_id": "2ce78244-437f-4fd9-9b31-77669781915f", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "2497b44c-301a-4581-9800-1c90451c4c88", "valid_until": null, "assertion_id": "0e75138e-ed1a-4f1a-9ff2-325f87fd5f3e", "temporal_expression": "", "extraction_confidence": 0.9}, "name": {"value": "The page title and heading call the asset \u201cShuaibah 2 IWP (STPC)\u201d; the project description calls it \u201cShuaibah-3 Expansion II \u2013 IWP Project.\u201d The source does not clarify the difference between these labels.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/shuaibah-2-iwp-stpc/", "name": "acwapower.com", "origin": "live", "checksum": "8d2cd08963ab45aec5a7be39b4818f62dce0a0e87f661b524ddecdc765191d69", "observed_at": "2026-10-18T07:27:15.330877+00:00", "revision_id": "b5c66e5f-bce3-469c-b75d-9b069c275a98", "published_at": null}, "locator": "/html/head/title", "claim_id": "13c43b9a-b23f-48ba-9f8b-ac08e3f8b438", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "09242c6b-709b-4679-96fa-d07aa2f3b537", "valid_until": null, "assertion_id": "02c91e02-40b9-45ae-86af-55cd13603782", "temporal_expression": "", "extraction_confidence": 0.9}, "owner": {"value": "ACWA Power; the source states 100% ownership/share.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/shuaibah-2-iwp-stpc/", "name": "acwapower.com", "origin": "live", "checksum": "8d2cd08963ab45aec5a7be39b4818f62dce0a0e87f661b524ddecdc765191d69", "observed_at": "2026-10-18T07:27:15.330877+00:00", "revision_id": "b5c66e5f-bce3-469c-b75d-9b069c275a98", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p[1]", "claim_id": "734c1abe-a509-46b8-914b-c5b35cecc989", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "dacd0043-6234-4ea3-8993-0439d2f08b00", "valid_until": null, "assertion_id": "cfe82d64-7115-4ca1-9932-00d2b13d12ef", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "Seawater reverse-osmosis (SWRO) desalination plant with stated capacity of 250,000 m\u00b3/day. The key-facts entry lists 250 under \u201cDesalinated water (000' m3/day).\u201d", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/shuaibah-2-iwp-stpc/", "name": "acwapower.com", "origin": "live", "checksum": "8d2cd08963ab45aec5a7be39b4818f62dce0a0e87f661b524ddecdc765191d69", "observed_at": "2026-10-18T07:27:15.330877+00:00", "revision_id": "b5c66e5f-bce3-469c-b75d-9b069c275a98", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p[1]", "claim_id": "70e4f9a2-844a-49b2-b19f-c371ddd29b71", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "dacd0043-6234-4ea3-8993-0439d2f08b00", "valid_until": null, "assertion_id": "16b668fa-a14a-4e1b-af4b-4c90b84ab7e3", "temporal_expression": "", "extraction_confidence": 0.9}, "delivery": {"value": "The project is reported as completed 21 months after agreements were signed with the off-taker.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/shuaibah-2-iwp-stpc/", "name": "acwapower.com", "origin": "live", "checksum": "8d2cd08963ab45aec5a7be39b4818f62dce0a0e87f661b524ddecdc765191d69", "observed_at": "2026-10-18T07:27:15.330877+00:00", "revision_id": "b5c66e5f-bce3-469c-b75d-9b069c275a98", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p[6]", "claim_id": "3237258c-924f-45ba-8beb-a2ede9c39d5d", "modality": "actual", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "cc3af46d-c16d-44d4-958f-1ebcd0a86cf5", "valid_until": null, "assertion_id": "a6fa8b83-6ae4-4c39-838e-cbc46654ab5b", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Shuaibah Complex, 120 km south of Jeddah, Saudi Arabia.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/shuaibah-2-iwp-stpc/", "name": "acwapower.com", "origin": "live", "checksum": "8d2cd08963ab45aec5a7be39b4818f62dce0a0e87f661b524ddecdc765191d69", "observed_at": "2026-10-18T07:27:15.330877+00:00", "revision_id": "b5c66e5f-bce3-469c-b75d-9b069c275a98", "published_at": null}, "locator": "/html/head/main/div/section[4]/div/ul/li[1]", "claim_id": "2349aed9-55be-4474-996e-9ea6d2b881cf", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "b2064d60-c4c5-472c-9ae2-df33860a6883", "valid_until": null, "assertion_id": "94cfdb7a-682c-4fd1-b6a3-d27945e380c7", "temporal_expression": "", "extraction_confidence": 0.9}, "operator": {"value": "ACWA subsidiary NOMAC (Water Desalination Expansion Company \u2013 WDEC).", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/shuaibah-2-iwp-stpc/", "name": "acwapower.com", "origin": "live", "checksum": "8d2cd08963ab45aec5a7be39b4818f62dce0a0e87f661b524ddecdc765191d69", "observed_at": "2026-10-18T07:27:15.330877+00:00", "revision_id": "b5c66e5f-bce3-469c-b75d-9b069c275a98", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p[3]", "claim_id": "990590af-1a24-448b-8dd2-a04e671760dc", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "8c0dc6a5-b178-4aa7-a4f9-ac7e194ba312", "valid_until": null, "assertion_id": "bf42ab92-cd80-4445-bba0-304f1f943236", "temporal_expression": "", "extraction_confidence": 0.9}, "developer": {"value": "ACWA Power.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/shuaibah-2-iwp-stpc/", "name": "acwapower.com", "origin": "live", "checksum": "8d2cd08963ab45aec5a7be39b4818f62dce0a0e87f661b524ddecdc765191d69", "observed_at": "2026-10-18T07:27:15.330877+00:00", "revision_id": "b5c66e5f-bce3-469c-b75d-9b069c275a98", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p[3]", "claim_id": "0f530725-da66-45ef-aebf-8ce8b746f612", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "8c0dc6a5-b178-4aa7-a4f9-ac7e194ba312", "valid_until": null, "assertion_id": "daee1845-8f30-4996-967c-cb9fcc61cb32", "temporal_expression": "", "extraction_confidence": 0.9}, "contractor": {"value": "Construction was carried out by a joint venture of Abengoa and Fisia Italimpianto.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/shuaibah-2-iwp-stpc/", "name": "acwapower.com", "origin": "live", "checksum": "8d2cd08963ab45aec5a7be39b4818f62dce0a0e87f661b524ddecdc765191d69", "observed_at": "2026-10-18T07:27:15.330877+00:00", "revision_id": "b5c66e5f-bce3-469c-b75d-9b069c275a98", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p[3]", "claim_id": "22d4f2ef-986d-4d4d-b4fe-dbf6460e4a56", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "8c0dc6a5-b178-4aa7-a4f9-ac7e194ba312", "valid_until": null, "assertion_id": "68629065-f73c-4bcb-8abb-6fa80144e289", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "64da03b3-4965-4d89-89e7-c79db356e9db", "publication": {"local_only": false, "reviewed_at": "2026-10-18T08:06:23.622671+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "The ACWA page titles the asset \u201cShuaibah 2 IWP (STPC),\u201d while its description uses \u201cShuaibah-3 Expansion II \u2013 IWP Project\u201d; it does not explain the naming difference. The page describes a 250,000 m\u00b3/day seawater reverse-osmosis plant at Shuaibah Complex, 120 km south of Jeddah, Saudi Arabia. It names ACWA Power as developer and 100% owner, reports construction by an Abengoa\u2013Fisia Italimpianto joint venture, and names ACWA subsidiary NOMAC (WDEC) as operator. The source reports completion 21 months after off-taker agreements were signed and gives a Q2 2019 commercial operations date.", "schema_version": "1.0", "public_unknowns": ["The source reports project cost as $314 million in the description and US$312 million in the key facts; it does not reconcile the difference.", "Current procurement or tender status and any active supplier package are not established in the supplied source; it reports a Q2 2019 commercial operations date."], "evidence_observed_at": "2026-10-18T07:27:15.330877+00:00", "knowledge_reviewed_at": "2026-10-18T08:04:51.820383+00:00", "decisive_evidence_observed_at": "2026-10-18T07:27:15.330877+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "The page title and heading call the asset \u201cShuaibah 2 IWP (STPC)\u201d; the project description calls it \u201cShuaibah-3 Expansion II \u2013 IWP Project.\u201d The source does not clarify the difference between these labels.", "original_project_title": "The page title and heading call the asset \u201cShuaibah 2 IWP (STPC)\u201d; the project description calls it \u201cShuaibah-3 Expansion II \u2013 IWP Project.\u201d The source does not clarify the difference between these labels.", "canonical_url": "https://capexcue.com/projects/the-page-title-and-heading-call-the-asset-shuaibah-2-iwp-stpc-the-project-description-calls-it-shuaibah-3-expansion-ii-i-3b640d9c-e7c/", "release": {"id": "26b025c2-41c2-4002-9ab8-c1a063f03686", "number": 1, "published_at": "2026-10-18T08:07:09.302920+00:00"}, "release_reference": "release 1 (26b025c2-41c2-4002-9ab8-c1a063f03686)", "current_dossier_url": "https://capexcue.com/projects/the-page-title-and-heading-call-the-asset-shuaibah-2-iwp-stpc-the-project-description-calls-it-shuaibah-3-expansion-ii-i-3b640d9c-e7c/", "citation": "CapexCue \u2014 The page title and heading call the asset \u201cShuaibah 2 IWP (STPC)\u201d; the project description calls it \u201cShuaibah-3 Expansion II \u2013 IWP Project.\u201d The source does not clarify the difference between these labels. \u2014 dossier released 2026-10-18T08:07:09.302920+00:00, release 1 (26b025c2-41c2-4002-9ab8-c1a063f03686) \u2014 https://capexcue.com/projects/the-page-title-and-heading-call-the-asset-shuaibah-2-iwp-stpc-the-project-description-calls-it-shuaibah-3-expansion-ii-i-3b640d9c-e7c/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "independently_reviewed_metadata", "value": "water_environment", "support": {"end": 161, "start": 0, "sources": [{"url": "https://acwapower.com/en/what-we-do/projects/shuaibah-2-iwp-stpc/", "name": "acwapower.com", "origin": "live", "checksum": "8d2cd08963ab45aec5a7be39b4818f62dce0a0e87f661b524ddecdc765191d69", "observed_at": "2026-10-18T07:27:15.330877+00:00", "revision_id": "b5c66e5f-bce3-469c-b75d-9b069c275a98", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "Seawater reverse-osmosis (SWRO) desalination plant with stated capacity of 250,000 m\u00b3/day. The key-facts entry lists 250 under \u201cDesalinated water (000' m3/day).\u201d", "statement": "Seawater reverse-osmosis (SWRO) desalination plant with stated capacity of 250,000 m\u00b3/day. The key-facts entry lists 250 under \u201cDesalinated water (000' m3/day).\u201d", "qualifications": {"attribution": "acwapower.com"}}, "label": "Water and environment", "icon": "water"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "independently_reviewed_metadata", "value": "water_environment", "support": {"end": 161, "start": 0, "sources": [{"url": "https://acwapower.com/en/what-we-do/projects/shuaibah-2-iwp-stpc/", "name": "acwapower.com", "origin": "live", "checksum": "8d2cd08963ab45aec5a7be39b4818f62dce0a0e87f661b524ddecdc765191d69", "observed_at": "2026-10-18T07:27:15.330877+00:00", "revision_id": "b5c66e5f-bce3-469c-b75d-9b069c275a98", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "Seawater reverse-osmosis (SWRO) desalination plant with stated capacity of 250,000 m\u00b3/day. The key-facts entry lists 250 under \u201cDesalinated water (000' m3/day).\u201d", "statement": "Seawater reverse-osmosis (SWRO) desalination plant with stated capacity of 250,000 m\u00b3/day. The key-facts entry lists 250 under \u201cDesalinated water (000' m3/day).\u201d", "qualifications": {"attribution": "acwapower.com"}}}, "input_hash": "e4e349a7aa1e355e1eec9fe49eaf2c3b3cafe9f511df8f5425e3f002ce95679f", "release_id": "26b025c2-41c2-4002-9ab8-c1a063f03686", "type_codes": ["desalination"], "field_states": {"type": {"state": "accepted", "reason": "The supplied scope supports desalination as the physical asset type. The page title and heading identify Shuaibah 2 IWP (STPC), while the project description identifies Shuaibah-3 Expansion II \u2013 IWP Project; the source does not clarify the difference."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "The supplied location places the asset at Shuaibah Complex, 120 km south of Jeddah, Saudi Arabia."}, "category": {"state": "accepted", "reason": "The supplied scope identifies a seawater reverse-osmosis desalination plant, with stated capacity of 250,000 m\u00b3/day; the key-facts entry separately lists 250 in 000' m\u00b3/day units. The conflicting project labels do not change the supported asset category."}}, "region_codes": ["middle_east_north_africa"], "release_hash": "87efbb6ad75f98918cf769303b7007546dcb89808de907ace7c427b33268ce01", "assessment_id": "4558dda2-d637-4f04-b483-a0ec376f72a9", "country_codes": ["SA"], "assessment_hash": "4f4f56f3d95600b99711db5e789ffdfd2df1b2310768440bd3fb6c3e856eedc7", "country_label": "Saudi Arabia", "region_label": "Middle East North Africa", "type_labels": ["Desalination"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}