{"name": "Kidston BESS Project; also identified as the Kidston Stage-3 BESS Project (K3-BESS).", "slug": "kidston-bess-project-also-identified-as-the-kidston-stage-3-bess-project-k3-bess-f118e06e-b27", "as_of": "2026-10-17T15:04:43.369228+00:00", "depth": "basic", "facts": {"name": {"value": "Kidston BESS Project; also identified as the Kidston Stage-3 BESS Project (K3-BESS).", "rights": "facts_only", "source": {"url": "https://genexpower.com.au/kidston-bess-project/", "name": "genexpower.com.au", "origin": "live", "checksum": "a2ea690d968c239c5188369102c73690ab7fc28d2bb62f4e6bb51bd28a3fdfb4", "observed_at": "2026-10-17T14:54:09.481880+00:00", "revision_id": "a5f8c544-caab-4c7a-9f2d-a21cbed13fcb", "published_at": null}, "locator": "/html/body/div/div[1]/div[2]/div[1]/div[1]/div/div/div/div[1]/div/div/div[1]/h1", "claim_id": "42198267-2b3f-4250-a906-065450e779b2", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "genexpower.com.au", "evidence_id": "801fbaaa-f49d-4e94-830c-0bfdf369a9e3", "valid_until": null, "assertion_id": "194a0da2-26ae-477e-922e-16434f3ff593", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "Dedicated energy storage project with a target capacity of 200 MW and 800 MWh.", "rights": "facts_only", "source": {"url": "https://genexpower.com.au/kidston-bess-project/", "name": "genexpower.com.au", "origin": "live", "checksum": "a2ea690d968c239c5188369102c73690ab7fc28d2bb62f4e6bb51bd28a3fdfb4", "observed_at": "2026-10-17T14:54:09.481880+00:00", "revision_id": "a5f8c544-caab-4c7a-9f2d-a21cbed13fcb", "published_at": null}, "locator": "/html/body/div/div[1]/div[2]/div[2]/div[1]/div/div/div[3]/div/p[1]", "claim_id": "95ae78ab-de42-4953-8942-9c10a897be47", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "genexpower.com.au", "evidence_id": "b8fe0632-f2e0-4ca7-a4a3-a20085caa427", "valid_until": null, "assertion_id": "f92be73b-a3c9-4ec6-b10e-a78f5db463fa", "temporal_expression": "", "extraction_confidence": 0.9}, "sector": {"value": "Energy storage.", "rights": "facts_only", "source": {"url": "https://genexpower.com.au/kidston-bess-project/", "name": "genexpower.com.au", "origin": "live", "checksum": "a2ea690d968c239c5188369102c73690ab7fc28d2bb62f4e6bb51bd28a3fdfb4", "observed_at": "2026-10-17T14:54:09.481880+00:00", "revision_id": "a5f8c544-caab-4c7a-9f2d-a21cbed13fcb", "published_at": null}, "locator": "/html/body/div/div[1]/div[2]/div[2]/div[1]/div/div/div[3]/div/p[1]", "claim_id": "5d73bda1-aa27-4fde-9064-62eff21e0dcf", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "genexpower.com.au", "evidence_id": "b8fe0632-f2e0-4ca7-a4a3-a20085caa427", "valid_until": null, "assertion_id": "8e7be4df-bd7e-49da-a77c-0c2c7c595ca7", "temporal_expression": "", "extraction_confidence": 0.9}, "activity": {"value": "Grid connection arrangements have progressed; the project is preparing for construction.", "rights": "facts_only", "source": {"url": "https://genexpower.com.au/kidston-bess-project/", "name": "genexpower.com.au", "origin": "live", "checksum": "a2ea690d968c239c5188369102c73690ab7fc28d2bb62f4e6bb51bd28a3fdfb4", "observed_at": "2026-10-17T14:54:09.481880+00:00", "revision_id": "a5f8c544-caab-4c7a-9f2d-a21cbed13fcb", "published_at": null}, "locator": "/html/body/div/div[1]/div[2]/div[3]/div/div/div/div[2]/div[1]/div/div/div[1]/div/p", "claim_id": "1b180989-54e0-4d9c-9096-efe819119bc7", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "genexpower.com.au", "evidence_id": "90198ab5-9a87-475d-9a2d-0d052e9e9134", "valid_until": null, "assertion_id": "409653ae-e8b0-465c-a33b-e2990a9b3809", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Kidston, Far-North Queensland.", "rights": "facts_only", "source": {"url": "https://genexpower.com.au/kidston-bess-project/", "name": "genexpower.com.au", "origin": "live", "checksum": "a2ea690d968c239c5188369102c73690ab7fc28d2bb62f4e6bb51bd28a3fdfb4", "observed_at": "2026-10-17T14:54:09.481880+00:00", "revision_id": "a5f8c544-caab-4c7a-9f2d-a21cbed13fcb", "published_at": null}, "locator": "/html/body/div/div[1]/div[2]/div[1]/div[1]/div/div/div/div[1]/div/div/div[2]/div/h4", "claim_id": "6f307a51-3a37-4efd-a38c-b1d1bfdb55df", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "genexpower.com.au", "evidence_id": "2732f6e7-c7f7-4555-871d-3de019e1e9c1", "valid_until": null, "assertion_id": "c7030adc-2e2b-4001-9da8-b9f57d71151f", "temporal_expression": "", "extraction_confidence": 0.9}, "regulatory": {"value": "Remaining approvals are being secured.", "rights": "facts_only", "source": {"url": "https://genexpower.com.au/kidston-bess-project/", "name": "genexpower.com.au", "origin": "live", "checksum": "a2ea690d968c239c5188369102c73690ab7fc28d2bb62f4e6bb51bd28a3fdfb4", "observed_at": "2026-10-17T14:54:09.481880+00:00", "revision_id": "a5f8c544-caab-4c7a-9f2d-a21cbed13fcb", "published_at": null}, "locator": "/html/body/div/div[1]/div[2]/div[3]/div/div/div/div[2]/div[2]/div/div/div[1]/div/h5", "claim_id": "7ac1ed72-2586-4319-a2e7-94548c321c01", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "genexpower.com.au", "evidence_id": "c21dcde8-3cbb-49a4-9715-1c05f8c1ffa1", "valid_until": null, "assertion_id": "a4c85f46-267d-43c7-9795-bf4a6fc14b4c", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "68dae7d5-cebf-4a7f-baea-a9a940f5116a", "publication": {"local_only": false, "reviewed_at": "2026-10-17T15:05:46.539480+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "Genex describes the Kidston BESS Project, also called K3-BESS, as an energy-storage project planned for Kidston, Far-North Queensland, with target capacity of 200 MW and 800 MWh. The page reports progress on grid-connection arrangements, ongoing work to secure remaining approvals, and preparation for construction.", "schema_version": "1.0", "public_unknowns": ["Source observed 17 October 2026; no publication date is supplied. The supplied page does not state a budget, procurement route, equipment package or purchasing schedule.", "The page gives no dates for the reported grid-connection, approvals or construction-preparation status."], "evidence_observed_at": "2026-10-17T14:54:09.481880+00:00", "knowledge_reviewed_at": "2026-10-17T15:04:43.648783+00:00", "decisive_evidence_observed_at": "2026-10-17T14:54:09.481880+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Kidston BESS Project; also identified as the Kidston Stage-3 BESS Project (K3-BESS).", "original_project_title": "Kidston BESS Project; also identified as the Kidston Stage-3 BESS Project (K3-BESS).", "canonical_url": "https://capexcue.com/projects/kidston-bess-project-also-identified-as-the-kidston-stage-3-bess-project-k3-bess-f118e06e-b27/", "release": {"id": "25c90aef-c63d-41f6-a73b-d62a9cf5491d", "number": 1, "published_at": "2026-10-17T15:06:13.340459+00:00"}, "release_reference": "release 1 (25c90aef-c63d-41f6-a73b-d62a9cf5491d)", "current_dossier_url": "https://capexcue.com/projects/kidston-bess-project-also-identified-as-the-kidston-stage-3-bess-project-k3-bess-f118e06e-b27/", "citation": "CapexCue \u2014 Kidston BESS Project; also identified as the Kidston Stage-3 BESS Project (K3-BESS). \u2014 dossier released 2026-10-17T15:06:13.340459+00:00, release 1 (25c90aef-c63d-41f6-a73b-d62a9cf5491d) \u2014 https://capexcue.com/projects/kidston-bess-project-also-identified-as-the-kidston-stage-3-bess-project-k3-bess-f118e06e-b27/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 15, "start": 0, "sources": [{"url": "https://genexpower.com.au/kidston-bess-project/", "name": "genexpower.com.au", "origin": "live", "checksum": "a2ea690d968c239c5188369102c73690ab7fc28d2bb62f4e6bb51bd28a3fdfb4", "observed_at": "2026-10-17T14:54:09.481880+00:00", "revision_id": "a5f8c544-caab-4c7a-9f2d-a21cbed13fcb", "published_at": null}], "modality": "reported", "predicate": "sector", "raw_value": "Energy storage.", "statement": "Energy storage.", "qualifications": {"attribution": "genexpower.com.au"}}, "label": "Energy", "icon": "energy"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 15, "start": 0, "sources": [{"url": "https://genexpower.com.au/kidston-bess-project/", "name": "genexpower.com.au", "origin": "live", "checksum": "a2ea690d968c239c5188369102c73690ab7fc28d2bb62f4e6bb51bd28a3fdfb4", "observed_at": "2026-10-17T14:54:09.481880+00:00", "revision_id": "a5f8c544-caab-4c7a-9f2d-a21cbed13fcb", "published_at": null}], "modality": "reported", "predicate": "sector", "raw_value": "Energy storage.", "statement": "Energy storage.", "qualifications": {"attribution": "genexpower.com.au"}}}, "input_hash": "81caba073c79ffe05448cd8315965989d4bd032ac0735576c6029f39d80b0aa4", "release_id": "25c90aef-c63d-41f6-a73b-d62a9cf5491d", "type_codes": ["battery_storage"], "field_states": {"type": {"state": "accepted", "reason": "supported_physical_components"}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "Kidston, Far-North Queensland is in Australia; preserve the dedicated battery scope."}, "category": {"state": "accepted", "reason": "supported_primary_category"}}, "region_codes": ["oceania"], "release_hash": "bfa42558bdbf0f5dda9afd4e039256c007b3749db1158067b766cc24beab4659", "assessment_id": "375efd78-d6cb-430a-8937-72f038783c2f", "country_codes": ["AU"], "assessment_hash": "fd728e77b57c620d39da2d9ba922d72c3fba45c4606fe318b3e4f420754d93e2", "country_label": "Australia", "region_label": "Oceania", "type_labels": ["Battery Storage"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}