{"name": "Taiba 1 IPP", "slug": "taiba-1-ipp-fb5bb6aa-5ef", "as_of": "2026-10-18T07:58:15.642964+00:00", "depth": "basic", "facts": {"name": {"value": "Taiba 1 IPP", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/taiba-1-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "54e2dc9f5a86c5622d4f65e17e8c7c3703246d660f14463d89ddf865c229b63e", "observed_at": "2026-10-18T07:27:13.100902+00:00", "revision_id": "0c431337-3b1f-45f2-be86-888fff3049c8", "published_at": null}, "locator": "/html/head/main/div/section[1]/div[1]/div/div/div/div/div[1]/h3", "claim_id": "171329d7-e8a2-42c9-b23b-ba317bc9e986", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "d2d7efcc-5701-4ded-92c0-e71aa43df655", "valid_until": null, "assertion_id": "322a5a56-0e27-4e95-9ac7-3d420e359bf3", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "1,800 MW Combined Cycle Gas Turbine (CCGT) independent power plant using natural gas.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/taiba-1-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "54e2dc9f5a86c5622d4f65e17e8c7c3703246d660f14463d89ddf865c229b63e", "observed_at": "2026-10-18T07:27:13.100902+00:00", "revision_id": "0c431337-3b1f-45f2-be86-888fff3049c8", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p[1]", "claim_id": "4835f96e-cb8d-43ed-a18e-a0d981f03c94", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "121781e8-3887-4574-adc1-9ac079ce0c05", "valid_until": null, "assertion_id": "3c596a42-6d2a-4ba4-8652-76180ab7dc0d", "temporal_expression": "", "extraction_confidence": 0.9}, "sponsor": {"value": "ACWA Power (40% share), Saudi Electricity Company (SEC; 40%), and Haji Abdullah Alireza & Co. LTD (HAACO; 20%).", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/taiba-1-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "54e2dc9f5a86c5622d4f65e17e8c7c3703246d660f14463d89ddf865c229b63e", "observed_at": "2026-10-18T07:27:13.100902+00:00", "revision_id": "0c431337-3b1f-45f2-be86-888fff3049c8", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p[2]", "claim_id": "e7a5d985-0d2f-4bf0-af95-eca523a42e0c", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "2580b649-cc17-496d-ac9e-222ba0b6c9f2", "valid_until": null, "assertion_id": "8b339018-353d-4c26-a532-35b19b96f200", "temporal_expression": "", "extraction_confidence": 0.9}, "delivery": {"value": "ACWA Power and the Saudi Power Procurement Company (SPPC) have signed a 25-year power purchase agreement for development, financing, building, owning and operating the plant; SPPC is the sole off-taker. This records the signed agreement, not completion of its delivery obligations.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/taiba-1-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "54e2dc9f5a86c5622d4f65e17e8c7c3703246d660f14463d89ddf865c229b63e", "observed_at": "2026-10-18T07:27:13.100902+00:00", "revision_id": "0c431337-3b1f-45f2-be86-888fff3049c8", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p[1]", "claim_id": "bc0409db-6747-4497-aa2b-37ad440f1d8d", "modality": "actual", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "121781e8-3887-4574-adc1-9ac079ce0c05", "valid_until": null, "assertion_id": "a41abb27-c26e-4cd9-b6c9-82afcb887e45", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Al-Madinah region, Saudi Arabia; the key facts list Al-Madinah, Saudi Arabia.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/taiba-1-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "54e2dc9f5a86c5622d4f65e17e8c7c3703246d660f14463d89ddf865c229b63e", "observed_at": "2026-10-18T07:27:13.100902+00:00", "revision_id": "0c431337-3b1f-45f2-be86-888fff3049c8", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p[1]", "claim_id": "1b6d076e-f963-45ab-b9e7-742fa734fe05", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "121781e8-3887-4574-adc1-9ac079ce0c05", "valid_until": null, "assertion_id": "1ee5a847-d4d8-469b-955f-97901afc4d59", "temporal_expression": "", "extraction_confidence": 0.9}, "developer": {"value": "ACWA Power", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/taiba-1-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "54e2dc9f5a86c5622d4f65e17e8c7c3703246d660f14463d89ddf865c229b63e", "observed_at": "2026-10-18T07:27:13.100902+00:00", "revision_id": "0c431337-3b1f-45f2-be86-888fff3049c8", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p[1]", "claim_id": "d0b9501e-5bc2-4637-a7f1-d69738710444", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "121781e8-3887-4574-adc1-9ac079ce0c05", "valid_until": null, "assertion_id": "f8202429-811f-4d74-962d-9eec194fa3d0", "temporal_expression": "", "extraction_confidence": 0.9}, "next_milestone": {"value": "Commercial operations date listed as Q2 2027.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/taiba-1-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "54e2dc9f5a86c5622d4f65e17e8c7c3703246d660f14463d89ddf865c229b63e", "observed_at": "2026-10-18T07:27:13.100902+00:00", "revision_id": "0c431337-3b1f-45f2-be86-888fff3049c8", "published_at": null}, "locator": "/html/head/main/div/section[4]/div/ul/li[7]", "claim_id": "b7dd48aa-3fb1-47fb-a871-0e65c4ec559d", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "48603e1a-9495-4a67-b640-b2edce23aae7", "valid_until": null, "assertion_id": "6b2f774d-4378-4154-ac2f-e3ed7ea62283", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "6b828db2-1489-4cc2-ac73-321258f0f5ad", "publication": {"local_only": false, "reviewed_at": "2026-10-18T07:59:39.563207+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "Taiba 1 IPP is reported as a 1,800 MW natural-gas CCGT power project in Al-Madinah, Saudi Arabia, developed by ACWA Power. The source reports a signed 25-year PPA with SPPC, identified as the sole off-taker, and lists Q2 2027 as the commercial operations date.", "schema_version": "1.0", "public_unknowns": ["In the supplied page snapshot observed 2026-10-18, procurement availability is not stated. The page lists Q2 2027 as the commercial operations date, but does not establish whether that schedule remains current."], "evidence_observed_at": "2026-10-18T07:27:13.100902+00:00", "knowledge_reviewed_at": "2026-10-18T07:58:16.646938+00:00", "decisive_evidence_observed_at": "2026-10-18T07:27:13.100902+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Taiba 1 IPP", "original_project_title": "Taiba 1 IPP", "canonical_url": "https://capexcue.com/projects/taiba-1-ipp-fb5bb6aa-5ef/", "release": {"id": "792d0e4b-1eb4-4e09-9db4-2780e9673634", "number": 1, "published_at": "2026-10-18T08:00:04.981430+00:00"}, "release_reference": "release 1 (792d0e4b-1eb4-4e09-9db4-2780e9673634)", "current_dossier_url": "https://capexcue.com/projects/taiba-1-ipp-fb5bb6aa-5ef/", "citation": "CapexCue \u2014 Taiba 1 IPP \u2014 dossier released 2026-10-18T08:00:04.981430+00:00, release 1 (792d0e4b-1eb4-4e09-9db4-2780e9673634) \u2014 https://capexcue.com/projects/taiba-1-ipp-fb5bb6aa-5ef/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 85, "start": 0, "sources": [{"url": "https://acwapower.com/en/what-we-do/projects/taiba-1-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "54e2dc9f5a86c5622d4f65e17e8c7c3703246d660f14463d89ddf865c229b63e", "observed_at": "2026-10-18T07:27:13.100902+00:00", "revision_id": "0c431337-3b1f-45f2-be86-888fff3049c8", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "1,800 MW Combined Cycle Gas Turbine (CCGT) independent power plant using natural gas.", "statement": "1,800 MW Combined Cycle Gas Turbine (CCGT) independent power plant using natural gas.", "qualifications": {"attribution": "acwapower.com"}}, "label": "Energy", "icon": "energy"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 85, "start": 0, "sources": [{"url": "https://acwapower.com/en/what-we-do/projects/taiba-1-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "54e2dc9f5a86c5622d4f65e17e8c7c3703246d660f14463d89ddf865c229b63e", "observed_at": "2026-10-18T07:27:13.100902+00:00", "revision_id": "0c431337-3b1f-45f2-be86-888fff3049c8", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "1,800 MW Combined Cycle Gas Turbine (CCGT) independent power plant using natural gas.", "statement": "1,800 MW Combined Cycle Gas Turbine (CCGT) independent power plant using natural gas.", "qualifications": {"attribution": "acwapower.com"}}}, "input_hash": "92c06ff7639124d877bd76dbe6e0af448d1422172fe2cd905bf8661e54cc92ba", "release_id": "792d0e4b-1eb4-4e09-9db4-2780e9673634", "type_codes": [], "field_states": {"type": {"state": "unknown_after_assessment", "reason": "Al-Madinah, Saudi Arabia is explicit; combined-cycle gas generation lacks a registered type."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "supported_physical_country"}, "category": {"state": "accepted", "reason": "Al-Madinah, Saudi Arabia is explicit; combined-cycle gas generation lacks a registered type."}}, "region_codes": ["middle_east_north_africa"], "release_hash": "233e9982a5d213af39df0485e3b891fb916f82f12edf6d16202b7372a833dbd3", "assessment_id": "962483c2-6245-4bca-9cec-fd001b0ec2e3", "country_codes": ["SA"], "assessment_hash": "6f7fa7272d8168b65c36a3ba161aee83e51c7c8a734197ce866102bae4709c31", "country_label": "Saudi Arabia", "region_label": "Middle East North Africa", "type_labels": []}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}