{"name": "Limondale BESS Battery Energy Storage System", "slug": "limondale-bess-battery-energy-storage-system-c48c21df-d7d", "as_of": "2026-10-17T11:49:09.189944+00:00", "depth": "basic", "facts": {"name": {"value": "Limondale BESS Battery Energy Storage System", "rights": "facts_only", "source": {"url": "https://au.rwe.com/projects/limondale-bess/", "name": "au.rwe.com", "origin": "live", "checksum": "19aab9aa16516984938c1c6a611b8cb0439a7e8975ed54d16a3cdbe8aa5f6ab6", "observed_at": "2026-10-17T10:42:12.837068+00:00", "revision_id": "dd954268-f941-4bc0-aa68-80dc1499a29f", "published_at": null}, "locator": "/html/body/div[1]/div[2]/div[4]/div/header/section[1]/div/div/div/div/div[2]/div[1]/section/div/div/div/div[2]/header/h1", "claim_id": "7d6f4589-30ff-47ee-a1eb-f611dd552bd1", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "au.rwe.com", "evidence_id": "a62b3cdd-a8b4-4e06-b27f-11dcd5720f49", "valid_until": null, "assertion_id": "bba8a46a-7d58-4b1a-924d-cb6e900e4dea", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "Battery energy storage system described as 50+ MW and 400+ MWh, with an eight-hour duration. Designed to store excess solar generation for delivery to the grid; connects through the Limondale Solar Farm\u2019s existing 33 kV substation.", "rights": "facts_only", "source": {"url": "https://au.rwe.com/projects/limondale-bess/", "name": "au.rwe.com", "origin": "live", "checksum": "19aab9aa16516984938c1c6a611b8cb0439a7e8975ed54d16a3cdbe8aa5f6ab6", "observed_at": "2026-10-17T10:42:12.837068+00:00", "revision_id": "dd954268-f941-4bc0-aa68-80dc1499a29f", "published_at": null}, "locator": "/html/body/div[1]/div[2]/div[4]/div/main/section[3]/div/div/div[1]/div/div[2]/p[2]", "claim_id": "3bdb25fa-75ef-45a3-b6f5-cd95e80f31af", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "au.rwe.com", "evidence_id": "45c09312-33c6-44c7-9a45-00714279a3e8", "valid_until": null, "assertion_id": "09dd447d-1ab8-41c4-b3b2-a223165644d4", "temporal_expression": "", "extraction_confidence": 0.9}, "activity": {"value": "The project page lists the BESS as in operation; a May 2026 news item says the eight-hour battery moved from commissioning to full operations.", "rights": "facts_only", "source": {"url": "https://au.rwe.com/projects/limondale-bess/", "name": "au.rwe.com", "origin": "live", "checksum": "19aab9aa16516984938c1c6a611b8cb0439a7e8975ed54d16a3cdbe8aa5f6ab6", "observed_at": "2026-10-17T10:42:12.837068+00:00", "revision_id": "dd954268-f941-4bc0-aa68-80dc1499a29f", "published_at": null}, "locator": "/html/body/div[1]/div[2]/div[4]/div/main/section[4]/div/div/div[1]/div/div[2]/p[3]", "claim_id": "ae5322ba-6155-4c04-8f56-edea9a810741", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "au.rwe.com", "evidence_id": "640de037-3d92-4365-8a82-44c202933828", "valid_until": null, "assertion_id": "3ef5535f-821f-47c5-9b82-05dba6b11058", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Near Balranald, New South Wales, Australia; adjacent to the existing Limondale Solar Farm.", "rights": "facts_only", "source": {"url": "https://au.rwe.com/projects/limondale-bess/", "name": "au.rwe.com", "origin": "live", "checksum": "19aab9aa16516984938c1c6a611b8cb0439a7e8975ed54d16a3cdbe8aa5f6ab6", "observed_at": "2026-10-17T10:42:12.837068+00:00", "revision_id": "dd954268-f941-4bc0-aa68-80dc1499a29f", "published_at": null}, "locator": "/html/body/div[1]/div[2]/div[4]/div/main/section[3]/div/div/div[1]/div/div[2]/p[1]", "claim_id": "e477a16e-67e7-4c78-a2fa-c4dbb84cb996", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "au.rwe.com", "evidence_id": "7bcd3e15-6d2e-4dd2-afc6-2968843fb0e4", "valid_until": null, "assertion_id": "a7cbd46c-6c8e-462d-8a02-5b25128e60b2", "temporal_expression": "", "extraction_confidence": 0.9}, "investment": {"value": "A May 2024 media announcement is identified as the BESS investment decision.", "rights": "facts_only", "source": {"url": "https://au.rwe.com/projects/limondale-bess/", "name": "au.rwe.com", "origin": "live", "checksum": "19aab9aa16516984938c1c6a611b8cb0439a7e8975ed54d16a3cdbe8aa5f6ab6", "observed_at": "2026-10-17T10:42:12.837068+00:00", "revision_id": "dd954268-f941-4bc0-aa68-80dc1499a29f", "published_at": null}, "locator": "/html/body/div[1]/div[2]/div[4]/div/main/section[6]/div/div/div/section[7]/div/div/div/section/ul/li[13]", "claim_id": "b0716a65-1319-4dc2-a497-24ec17b356fd", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "au.rwe.com", "evidence_id": "f029e65f-853d-4923-9518-1f243ad8e8c3", "valid_until": null, "assertion_id": "b0bfe0ba-9d3b-47b5-a041-c71cf22f505b", "temporal_expression": "", "extraction_confidence": 0.9}, "regulatory": {"value": "Reportedly registered with the Australian Energy Market Operator (AEMO) in September 2025.", "rights": "facts_only", "source": {"url": "https://au.rwe.com/projects/limondale-bess/", "name": "au.rwe.com", "origin": "live", "checksum": "19aab9aa16516984938c1c6a611b8cb0439a7e8975ed54d16a3cdbe8aa5f6ab6", "observed_at": "2026-10-17T10:42:12.837068+00:00", "revision_id": "dd954268-f941-4bc0-aa68-80dc1499a29f", "published_at": null}, "locator": "/html/body/div[1]/div[2]/div[4]/div/main/section[3]/div/div/div[1]/div/div[2]/p[3]", "claim_id": "6b167e0b-99c9-4a19-89c6-921a6986f907", "modality": "actual", "confidence": 0.9, "valid_from": null, "attribution": "au.rwe.com", "evidence_id": "a4ef63c8-4902-4d52-8a67-af10aa0c6bb4", "valid_until": null, "assertion_id": "6cfbe718-f7e0-432f-ab3c-b5171bb03a2b", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "6ccf5a65-6b01-4101-a568-f543e1c8c3d0", "publication": {"local_only": false, "reviewed_at": "2026-10-17T11:50:31.356383+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "Limondale BESS is a battery storage project near Balranald, New South Wales, alongside Limondale Solar Farm. The project is described as 50+ MW and 400+ MWh, with an eight-hour duration, and connects through the solar farm\u2019s existing 33 kV substation. The project page lists it as in operation; a May 2026 news item reports its move from commissioning to full operations. The page also reports AEMO registration in September 2025.", "schema_version": "1.0", "public_unknowns": ["The supplied page does not state whether procurement or supplier packages are currently available. It lists the project as in operation and includes a May 2026 report of full operations; no open buying window is documented.", "A financing amount is not stated in the supplied material; the page identifies a May 2024 announcement as the investment decision.", "Current supplier package boundaries and detailed equipment requirements are not stated; the page describes the overall battery capacity and grid connection."], "evidence_observed_at": "2026-10-17T10:42:12.837068+00:00", "knowledge_reviewed_at": "2026-10-17T11:49:09.488832+00:00", "decisive_evidence_observed_at": "2026-10-17T10:42:12.837068+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Limondale BESS Battery Energy Storage System", "original_project_title": "Limondale BESS Battery Energy Storage System", "canonical_url": "https://capexcue.com/projects/limondale-bess-battery-energy-storage-system-c48c21df-d7d/", "release": {"id": "28b0cb78-0632-4570-aa02-b46d846dff24", "number": 1, "published_at": "2026-10-17T11:50:40.092433+00:00"}, "release_reference": "release 1 (28b0cb78-0632-4570-aa02-b46d846dff24)", "current_dossier_url": "https://capexcue.com/projects/limondale-bess-battery-energy-storage-system-c48c21df-d7d/", "citation": "CapexCue \u2014 Limondale BESS Battery Energy Storage System \u2014 dossier released 2026-10-17T11:50:40.092433+00:00, release 1 (28b0cb78-0632-4570-aa02-b46d846dff24) \u2014 https://capexcue.com/projects/limondale-bess-battery-energy-storage-system-c48c21df-d7d/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "independently_reviewed_metadata", "value": "energy", "support": {"end": 44, "start": 0, "sources": [{"url": "https://au.rwe.com/projects/limondale-bess/", "name": "au.rwe.com", "origin": "live", "checksum": "19aab9aa16516984938c1c6a611b8cb0439a7e8975ed54d16a3cdbe8aa5f6ab6", "observed_at": "2026-10-17T10:42:12.837068+00:00", "revision_id": "dd954268-f941-4bc0-aa68-80dc1499a29f", "published_at": null}], "modality": "reported", "predicate": "name", "raw_value": "Limondale BESS Battery Energy Storage System", "statement": "Limondale BESS Battery Energy Storage System", "qualifications": {"attribution": "au.rwe.com"}}, "label": "Energy", "icon": "energy"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "independently_reviewed_metadata", "value": "energy", "support": {"end": 44, "start": 0, "sources": [{"url": "https://au.rwe.com/projects/limondale-bess/", "name": "au.rwe.com", "origin": "live", "checksum": "19aab9aa16516984938c1c6a611b8cb0439a7e8975ed54d16a3cdbe8aa5f6ab6", "observed_at": "2026-10-17T10:42:12.837068+00:00", "revision_id": "dd954268-f941-4bc0-aa68-80dc1499a29f", "published_at": null}], "modality": "reported", "predicate": "name", "raw_value": "Limondale BESS Battery Energy Storage System", "statement": "Limondale BESS Battery Energy Storage System", "qualifications": {"attribution": "au.rwe.com"}}}, "input_hash": "e494ac1a0a51c3f9f75bdef8bcbd6424621b559f85e10c777808af8a995dd79e", "release_id": "28b0cb78-0632-4570-aa02-b46d846dff24", "type_codes": ["battery_storage"], "field_states": {"type": {"state": "accepted", "reason": "The named asset is a battery energy storage system. Its stated capacity and duration qualify its storage scope; the nearby existing solar farm and its 33 kV substation are described as adjacent and as the connection point, not as project components. The activity, investment, and regulatory facts do not identify additional physical components."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "The physical asset is located near Balranald, New South Wales, Australia. The supplied geographic reference maps Australia to AU."}, "category": {"state": "accepted", "reason": "The project is identified as a battery energy storage system, described as 50+ MW and 400+ MWh with an eight-hour duration, designed to store excess solar generation for delivery to the grid. The existing Limondale Solar Farm is adjacent and its substation is the connection point; the solar farm is not identified as a component of this asset. The activity, investment, and regulatory facts describe operational, investment-decision, and registration matters and do not change the asset category."}}, "region_codes": ["oceania"], "release_hash": "acbe49c10ec17d3d1724e9cb23c4fcf281faec56506ca2c72311a5e6a4620f8f", "assessment_id": "0ec4df08-3fd9-49ed-8ac5-e00a4d04e281", "country_codes": ["AU"], "assessment_hash": "5ca437c62b74790521a4110bcf030e5b4fc87aabe25a6c93e92a7cdfc91dd515", "country_label": "Australia", "region_label": "Oceania", "type_labels": ["Battery Storage"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}