{"name": "M5 Junction 10 Improvements Scheme", "slug": "m5-junction-10-improvements-scheme-3b5468eddaec68dd", "as_of": "2026-10-01T08:03:44.715044+00:00", "depth": "basic", "facts": {"name": {"value": "M5 Junction 10 Improvements Scheme", "rights": "facts_only", "source": {"url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/TR010063", "name": "Planning Inspectorate", "origin": "live", "checksum": "2b51d52bc4fd8c66a0de77efabc02d3f1232587b1f93db7704ae368aefa31c7c", "observed_at": "2026-10-01T07:44:05.617962+00:00", "revision_id": "5e75d721-37f1-4ca4-9f5c-9177d7d7f0b7", "published_at": null}, "locator": "/html/head/title", "claim_id": "3a062765-b34a-4547-ab1c-fd496d2b019d", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "Planning Inspectorate", "evidence_id": "ee119f3d-bf34-411b-b9cd-f076e51838b1", "valid_until": null, "assertion_id": "9ecdf90f-5dd3-4179-87f7-1748bf066491", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "The described scheme includes improvements to M5 Junction 10, a new road linking the junction to west Cheltenham, widening of the A4019 east of the junction, and separate dedicated footways and cycle lanes for non-motorised traffic on local roads within the scheme limits. The source does not establish that these works are underway or completed.", "rights": "facts_only", "source": {"url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/TR010063", "name": "Planning Inspectorate", "origin": "live", "checksum": "2b51d52bc4fd8c66a0de77efabc02d3f1232587b1f93db7704ae368aefa31c7c", "observed_at": "2026-10-01T07:44:05.617962+00:00", "revision_id": "5e75d721-37f1-4ca4-9f5c-9177d7d7f0b7", "published_at": null}, "locator": "/html/body/div[2]/main/div/div[2]/section[2]/p[3]", "claim_id": "3e360017-487a-457e-8dba-34268b559d6b", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "Planning Inspectorate", "evidence_id": "3bae67dd-c274-4dce-b32f-b64c459858d3", "valid_until": null, "assertion_id": "f5ee6c2b-cfff-4f6f-a5f7-d616ead8c8bf", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Gloucestershire, 5 miles south of Tewkesbury and 4 miles north-west of Cheltenham. The source does not specify a country in the supplied text.", "rights": "facts_only", "source": {"url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/TR010063", "name": "Planning Inspectorate", "origin": "live", "checksum": "2b51d52bc4fd8c66a0de77efabc02d3f1232587b1f93db7704ae368aefa31c7c", "observed_at": "2026-10-01T07:44:05.617962+00:00", "revision_id": "5e75d721-37f1-4ca4-9f5c-9177d7d7f0b7", "published_at": null}, "locator": "/html/body/div[2]/main/div/div[2]/p[1]", "claim_id": "33111c5a-64f7-4feb-8c78-bbc573358046", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "Planning Inspectorate", "evidence_id": "ddbca41d-bfbd-485c-a4c1-482dc69e8615", "valid_until": null, "assertion_id": "65e940c0-95fa-4bc5-8ebc-e79c5d386b08", "temporal_expression": "", "extraction_confidence": 0.9}, "regulatory": {"value": "The application is classified as highways. Gloucestershire County Council is named as the applicant. The page states that the application was granted on 4 June 2025 and that the project is at the post-decision stage. Separately, it reports that the applicant applied for corrections to the development consent order on 11 July 2025 and that the Secretary of State issued a correction notice and correction order on 29 October 2025.", "rights": "facts_only", "source": {"url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/TR010063", "name": "Planning Inspectorate", "origin": "live", "checksum": "2b51d52bc4fd8c66a0de77efabc02d3f1232587b1f93db7704ae368aefa31c7c", "observed_at": "2026-10-01T07:44:05.617962+00:00", "revision_id": "5e75d721-37f1-4ca4-9f5c-9177d7d7f0b7", "published_at": null}, "locator": "/html/body/div[2]/main/div/div[2]/section[2]/p[1]", "claim_id": "c5f0cecb-514d-448d-97fd-2af65b365e45", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "Planning Inspectorate", "evidence_id": "d0d6c576-52a6-4ffb-b141-d99162d3d728", "valid_until": null, "assertion_id": "2c1b693c-1524-4aee-b6f8-792a813e2ab1", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "6e4fa4a7-64ac-4dd7-8896-740d11fc2c1e", "publication": {"local_only": false, "reviewed_at": "2026-10-15T17:37:34.919399+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "The M5 Junction 10 Improvements Scheme is described as a highways application by Gloucestershire County Council. Its stated scope includes junction improvements, a new link road to west Cheltenham, widening of the A4019 east of the junction, and dedicated footways and cycle lanes on local roads. \n\nThe page reports that the application was granted on 4 June 2025 and labels the project post-decision. Its update dated 30 October 2025 reports a correction application made on 11 July 2025 and a correction notice and order issued on 29 October 2025. These are consent-related events, not confirmation of construction progress. The stated location is Gloucestershire, south of Tewkesbury and north-west of Cheltenham.", "schema_version": "1.0", "public_unknowns": ["The supplied page's latest update is dated 30 October 2025; the supplied text does not establish whether construction has started, the current physical works status, or a next milestone.", "Gloucestershire County Council is identified as applicant, but the supplied project information does not name a contractor, sponsor, or funding source.", "The location text does not specify a country.", "The page says the displayed project boundaries are illustrative and directs readers to relevant plans and drawings for exact boundaries; the geospatial boundary file and linked documents are not interpreted here.", "The supplied page text does not provide environmental or ecological characteristics."], "evidence_observed_at": "2026-10-01T07:44:05.617962+00:00", "knowledge_reviewed_at": "2026-10-15T17:37:34.919399+00:00", "decisive_evidence_observed_at": "2026-10-01T07:44:05.617962+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "M5 Junction 10 Improvements Scheme", "original_project_title": "M5 Junction 10 Improvements Scheme", "canonical_url": "https://capexcue.com/projects/m5-junction-10-improvements-scheme-3b5468eddaec68dd/", "release": {"id": "9214e949-9f9b-44d0-bfe1-ad435b3f54d2", "number": 1, "published_at": "2026-10-15T17:37:35.141897+00:00"}, "release_reference": "release 1 (9214e949-9f9b-44d0-bfe1-ad435b3f54d2)", "current_dossier_url": "https://capexcue.com/projects/m5-junction-10-improvements-scheme-3b5468eddaec68dd/", "citation": "CapexCue \u2014 M5 Junction 10 Improvements Scheme \u2014 dossier released 2026-10-15T17:37:35.141897+00:00, release 1 (9214e949-9f9b-44d0-bfe1-ad435b3f54d2) \u2014 https://capexcue.com/projects/m5-junction-10-improvements-scheme-3b5468eddaec68dd/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "codex_retained_dossier_curation", "value": "transport_logistics", "support": {"end": 346, "start": 0, "sources": [{"url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/TR010063", "name": "Planning Inspectorate", "origin": "live", "checksum": "2b51d52bc4fd8c66a0de77efabc02d3f1232587b1f93db7704ae368aefa31c7c", "observed_at": "2026-10-01T07:44:05.617962+00:00", "revision_id": "5e75d721-37f1-4ca4-9f5c-9177d7d7f0b7", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "The described scheme includes improvements to M5 Junction 10, a new road linking the junction to west Cheltenham, widening of the A4019 east of the junction, and separate dedicated footways and cycle lanes for non-motorised traffic on local roads within the scheme limits. The source does not establish that these works are underway or completed.", "statement": "The described scheme includes improvements to M5 Junction 10, a new road linking the junction to west Cheltenham, widening of the A4019 east of the junction, and separate dedicated footways and cycle lanes for non-motorised traffic on local roads within the scheme limits. The source does not establish that these works are underway or completed.", "qualifications": {"attribution": "Planning Inspectorate"}}, "label": "Transport and logistics", "icon": "bridge"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "codex_retained_dossier_curation", "value": "transport_logistics", "support": {"end": 346, "start": 0, "sources": [{"url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/TR010063", "name": "Planning Inspectorate", "origin": "live", "checksum": "2b51d52bc4fd8c66a0de77efabc02d3f1232587b1f93db7704ae368aefa31c7c", "observed_at": "2026-10-01T07:44:05.617962+00:00", "revision_id": "5e75d721-37f1-4ca4-9f5c-9177d7d7f0b7", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "The described scheme includes improvements to M5 Junction 10, a new road linking the junction to west Cheltenham, widening of the A4019 east of the junction, and separate dedicated footways and cycle lanes for non-motorised traffic on local roads within the scheme limits. The source does not establish that these works are underway or completed.", "statement": "The described scheme includes improvements to M5 Junction 10, a new road linking the junction to west Cheltenham, widening of the A4019 east of the junction, and separate dedicated footways and cycle lanes for non-motorised traffic on local roads within the scheme limits. The source does not establish that these works are underway or completed.", "qualifications": {"attribution": "Planning Inspectorate"}}}, "input_hash": "a8cfa3246578d80ff1cc082624c9a789206f03c08f3206d638e3e23247d3075e", "release_id": "9214e949-9f9b-44d0-bfe1-ad435b3f54d2", "type_codes": ["road"], "field_states": {"type": {"state": "accepted", "reason": "Gloucestershire, Cheltenham and Tewkesbury identify the United Kingdom; current construction/completion is not inferred."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "Gloucestershire, Cheltenham and Tewkesbury identify the United Kingdom; current construction/completion is not inferred."}, "category": {"state": "accepted", "reason": "Gloucestershire, Cheltenham and Tewkesbury identify the United Kingdom; current construction/completion is not inferred."}}, "region_codes": ["europe"], "release_hash": "a8545fcc690f070a4d5954ceb54c8e630d5a0c6ff107f8957603a142aa1f0c62", "assessment_id": "9e0df6f8-1f0a-4aed-b5a4-87c23865a953", "country_codes": ["GB"], "assessment_hash": "01fc4288b624495dc8e16d34aa47366e3fcfb3837918c903473277200f8d95ac", "country_label": "United Kingdom", "region_label": "Europe", "type_labels": ["Road"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}