{"name": "Ar Rass 2 Solar PV IPP", "slug": "ar-rass-2-solar-pv-ipp-b3431a42-770", "as_of": "2026-10-18T06:57:55.519091+00:00", "depth": "basic", "facts": {"name": {"value": "Ar Rass 2 Solar PV IPP", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/ar-rass-2-solar-pv-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "00891a0b0a54d5648e10ac54de3cb4b79cf317ebe2759c484288bc1dd1e34e44", "observed_at": "2026-10-18T06:45:31.975414+00:00", "revision_id": "b7f3e003-029f-4359-a337-4c3d8fb73ed3", "published_at": null}, "locator": "/html/head/main/div/section[1]/div[1]/div/div/div/div/div[1]/h3", "claim_id": "35f09194-6d03-4406-bad3-01347d8d9f5e", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "6e1a3357-c171-46db-929b-b05f8692190e", "valid_until": null, "assertion_id": "e42cdb11-bb24-4c33-934c-9a23c9646ef8", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "Greenfield independent power project for a 2,000 MWac photovoltaic plant.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/ar-rass-2-solar-pv-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "00891a0b0a54d5648e10ac54de3cb4b79cf317ebe2759c484288bc1dd1e34e44", "observed_at": "2026-10-18T06:45:31.975414+00:00", "revision_id": "b7f3e003-029f-4359-a337-4c3d8fb73ed3", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p", "claim_id": "ad35d6fb-61d0-4ec6-92dd-72e00e05af64", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "8610b339-7812-4ac3-8eb0-00fa4defa172", "valid_until": null, "assertion_id": "574f1dfe-2d49-4d2d-bad0-45a6a0f58e35", "temporal_expression": "", "extraction_confidence": 0.9}, "sector": {"value": "Solar photovoltaic power generation.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/ar-rass-2-solar-pv-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "00891a0b0a54d5648e10ac54de3cb4b79cf317ebe2759c484288bc1dd1e34e44", "observed_at": "2026-10-18T06:45:31.975414+00:00", "revision_id": "b7f3e003-029f-4359-a337-4c3d8fb73ed3", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p", "claim_id": "fd4ba938-7032-47e4-bad9-318c7b908725", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "8610b339-7812-4ac3-8eb0-00fa4defa172", "valid_until": null, "assertion_id": "ad82945a-88b8-4b3f-85d7-0b14027269d1", "temporal_expression": "", "extraction_confidence": 0.9}, "activity": {"value": "Reported as under development/construction.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/ar-rass-2-solar-pv-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "00891a0b0a54d5648e10ac54de3cb4b79cf317ebe2759c484288bc1dd1e34e44", "observed_at": "2026-10-18T06:45:31.975414+00:00", "revision_id": "b7f3e003-029f-4359-a337-4c3d8fb73ed3", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p", "claim_id": "64c4a776-559a-424e-98fc-8b061228e6cf", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "8610b339-7812-4ac3-8eb0-00fa4defa172", "valid_until": null, "assertion_id": "411ae6c9-474b-48df-b770-dac3f26edbdd", "temporal_expression": "", "extraction_confidence": 0.9}, "delivery": {"value": "Build, Own, Operate (BOO).", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/ar-rass-2-solar-pv-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "00891a0b0a54d5648e10ac54de3cb4b79cf317ebe2759c484288bc1dd1e34e44", "observed_at": "2026-10-18T06:45:31.975414+00:00", "revision_id": "b7f3e003-029f-4359-a337-4c3d8fb73ed3", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p", "claim_id": "d5b90a2e-d875-4d71-bbc6-630caec31da2", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "8610b339-7812-4ac3-8eb0-00fa4defa172", "valid_until": null, "assertion_id": "4f80e0f5-d90a-432e-ab44-1c3d4b8bf9b6", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Ar Rass, Qassim Province, KSA (Saudi Arabia).", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/ar-rass-2-solar-pv-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "00891a0b0a54d5648e10ac54de3cb4b79cf317ebe2759c484288bc1dd1e34e44", "observed_at": "2026-10-18T06:45:31.975414+00:00", "revision_id": "b7f3e003-029f-4359-a337-4c3d8fb73ed3", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p", "claim_id": "62d950bf-0165-43e2-b5f0-6be65acac3a2", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "8610b339-7812-4ac3-8eb0-00fa4defa172", "valid_until": null, "assertion_id": "cc3c38f1-d265-45fd-a6a2-23acb78ed3ee", "temporal_expression": "", "extraction_confidence": 0.9}, "developer": {"value": "ACWA Power is identified as developer and is described as leading construction, engineering, operation, and maintenance of the plant.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/ar-rass-2-solar-pv-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "00891a0b0a54d5648e10ac54de3cb4b79cf317ebe2759c484288bc1dd1e34e44", "observed_at": "2026-10-18T06:45:31.975414+00:00", "revision_id": "b7f3e003-029f-4359-a337-4c3d8fb73ed3", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p", "claim_id": "5c1aa9ec-b8ee-49b6-9461-42592cdd2113", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "8610b339-7812-4ac3-8eb0-00fa4defa172", "valid_until": null, "assertion_id": "b1dc1ec5-3056-4250-8d8a-5ecfb39f540a", "temporal_expression": "", "extraction_confidence": 0.9}, "documented_package": {"value": "The page lists an Environmental & Social Impact Assessment, an Environmental & Social Impact Assessment Addendum, and ESIA Volume I Non-Technical Summary under Key documents; the documents themselves were not acquired here.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/ar-rass-2-solar-pv-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "00891a0b0a54d5648e10ac54de3cb4b79cf317ebe2759c484288bc1dd1e34e44", "observed_at": "2026-10-18T06:45:31.975414+00:00", "revision_id": "b7f3e003-029f-4359-a337-4c3d8fb73ed3", "published_at": null}, "locator": "/html/head/main/div/section[3]/div/div[1]/div/div/div/div/div[1]/ul/li", "claim_id": "e40e76db-b900-4eb4-b621-38ed74b947b9", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "905cb7df-33a8-4fe6-95e0-17fcffdd315e", "valid_until": null, "assertion_id": "3ae636b5-0609-41c9-aff5-093185a30d4c", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "74c0a7f8-c8ef-44d7-8fae-7b82c03a350b", "publication": {"local_only": false, "reviewed_at": "2026-10-18T06:59:18.408028+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "ACWA Power\u2019s project page describes Ar Rass 2 as a 2,000 MWac greenfield photovoltaic IPP in Ar Rass, Qassim Province, and reports it under development/construction. It describes BOO delivery; ACWA Power is identified as developer, while Saudi Power Procurement Company is identified as off-taker under a 35-year PPA.", "schema_version": "1.0", "public_unknowns": ["The source metadata gives no publication date and records the page observation as 2026-10-18. The page reports development/construction but does not establish whether that status remains current or whether supplier procurement is open.", "The supplied page text does not report a financing amount or financing stage.", "The page lists three environmental and social assessment documents, but their contents were not acquired here."], "evidence_observed_at": "2026-10-18T06:45:31.975414+00:00", "knowledge_reviewed_at": "2026-10-18T06:57:56.043320+00:00", "decisive_evidence_observed_at": "2026-10-18T06:45:31.975414+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Ar Rass 2 Solar PV IPP", "original_project_title": "Ar Rass 2 Solar PV IPP", "canonical_url": "https://capexcue.com/projects/ar-rass-2-solar-pv-ipp-b3431a42-770/", "release": {"id": "7aa30509-5009-4ff7-bf0d-6bff33a5d2c6", "number": 1, "published_at": "2026-10-18T06:59:28.929306+00:00"}, "release_reference": "release 1 (7aa30509-5009-4ff7-bf0d-6bff33a5d2c6)", "current_dossier_url": "https://capexcue.com/projects/ar-rass-2-solar-pv-ipp-b3431a42-770/", "citation": "CapexCue \u2014 Ar Rass 2 Solar PV IPP \u2014 dossier released 2026-10-18T06:59:28.929306+00:00, release 1 (7aa30509-5009-4ff7-bf0d-6bff33a5d2c6) \u2014 https://capexcue.com/projects/ar-rass-2-solar-pv-ipp-b3431a42-770/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "independently_reviewed_metadata", "value": "energy", "support": {"end": 73, "start": 0, "sources": [{"url": "https://acwapower.com/en/what-we-do/projects/ar-rass-2-solar-pv-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "00891a0b0a54d5648e10ac54de3cb4b79cf317ebe2759c484288bc1dd1e34e44", "observed_at": "2026-10-18T06:45:31.975414+00:00", "revision_id": "b7f3e003-029f-4359-a337-4c3d8fb73ed3", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "Greenfield independent power project for a 2,000 MWac photovoltaic plant.", "statement": "Greenfield independent power project for a 2,000 MWac photovoltaic plant.", "qualifications": {"attribution": "acwapower.com"}}, "label": "Energy", "icon": "energy"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "independently_reviewed_metadata", "value": "energy", "support": {"end": 73, "start": 0, "sources": [{"url": "https://acwapower.com/en/what-we-do/projects/ar-rass-2-solar-pv-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "00891a0b0a54d5648e10ac54de3cb4b79cf317ebe2759c484288bc1dd1e34e44", "observed_at": "2026-10-18T06:45:31.975414+00:00", "revision_id": "b7f3e003-029f-4359-a337-4c3d8fb73ed3", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "Greenfield independent power project for a 2,000 MWac photovoltaic plant.", "statement": "Greenfield independent power project for a 2,000 MWac photovoltaic plant.", "qualifications": {"attribution": "acwapower.com"}}}, "input_hash": "b80be7bffa21f6378378834fcaff32a73d2c35bc39061a06c05355a18f32d2ac", "release_id": "7aa30509-5009-4ff7-bf0d-6bff33a5d2c6", "type_codes": ["solar_pv"], "field_states": {"type": {"state": "accepted", "reason": "The photovoltaic plant is the identified physical asset. The listed ESIA documents are not project components."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "The project location is stated as Ar Rass, Qassim Province, KSA (Saudi Arabia), supporting Saudi Arabia as the physical asset's country."}, "category": {"state": "accepted", "reason": "The reported project scope is a 2,000 MWac photovoltaic plant, and the reported sector is solar photovoltaic power generation. No other physical project component is identified."}}, "region_codes": ["middle_east_north_africa"], "release_hash": "80dbd1a32ee71313d971cae499ea217de81d50fd1679d3735b4e0d9409656d51", "assessment_id": "e995936c-2d88-4dd7-97b7-2a11ebdf5945", "country_codes": ["SA"], "assessment_hash": "869a6001003b46ee6fe3e6c433fc23a84f57c890d16f0f70c03e9b2ca60b6916", "country_label": "Saudi Arabia", "region_label": "Middle East North Africa", "type_labels": ["Solar PV"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}