# Ar Rass 2 Solar PV IPP

Publisher: CapexCue
Canonical dossier: <https://capexcue.com/projects/ar-rass-2-solar-pv-ipp-b3431a42-770/>
Dossier reference: release 1 (7aa30509-5009-4ff7-bf0d-6bff33a5d2c6)

Released project intelligence

Oldest supporting observation: 2026-10-18T06:45:31.975414+00:00
Dossier released: 2026-10-18T06:59:28.929306+00:00
Source report dates and capture dates are listed per fact below; neither establishes an event date.

## Project summary

ACWA Power’s project page describes Ar Rass 2 as a 2,000 MWac greenfield photovoltaic IPP in Ar Rass, Qassim Province, and reports it under development/construction. It describes BOO delivery; ACWA Power is identified as developer, while Saudi Power Procurement Company is identified as off-taker under a 35-year PPA.

## Evidence limits and unknowns

- The source metadata gives no publication date and records the page observation as 2026-10-18. The page reports development/construction but does not establish whether that status remains current or whether supplier procurement is open.
- The supplied page text does not report a financing amount or financing stage.
- The page lists three environmental and social assessment documents, but their contents were not acquired here.

Current purchasing availability: unknown.
Source-dated plans do not establish current progress or available supplier packages.

## Project metadata

Country: Saudi Arabia
Region: Middle East North Africa
Physical assets: Solar PV
Derived from the exact released evidence; unresolved fields remain unclassified.

## Project category

Energy
Derived from the reviewed scope statement; delivery stage remains unclassified.
Greenfield independent power project for a 2,000 MWac photovoltaic plant.
Source: acwapower.com — https://acwapower.com/en/what-we-do/projects/ar-rass-2-solar-pv-ipp/ | published unknown | observed 2026-10-18T06:45:31.975414+00:00

Project overview
Oldest decisive evidence: 2026-10-18T06:45:31.975414+00:00
Newest evidence: 2026-10-18T06:45:31.975414+00:00
Knowledge reviewed: 2026-10-18T06:57:56.043320+00:00
Publication reviewed: 2026-10-18T06:59:18.408028+00:00

## Name
Ar Rass 2 Solar PV IPP
Status: reported
Attribution: acwapower.com
Source: acwapower.com — https://acwapower.com/en/what-we-do/projects/ar-rass-2-solar-pv-ipp/ | published unknown | observed 2026-10-18T06:45:31.975414+00:00

## Scope
Greenfield independent power project for a 2,000 MWac photovoltaic plant.
Status: reported
Attribution: acwapower.com
Source: acwapower.com — https://acwapower.com/en/what-we-do/projects/ar-rass-2-solar-pv-ipp/ | published unknown | observed 2026-10-18T06:45:31.975414+00:00

## Sector
Solar photovoltaic power generation.
Status: reported
Attribution: acwapower.com
Source: acwapower.com — https://acwapower.com/en/what-we-do/projects/ar-rass-2-solar-pv-ipp/ | published unknown | observed 2026-10-18T06:45:31.975414+00:00

## Activity
Reported as under development/construction.
Status: reported
Attribution: acwapower.com
Source: acwapower.com — https://acwapower.com/en/what-we-do/projects/ar-rass-2-solar-pv-ipp/ | published unknown | observed 2026-10-18T06:45:31.975414+00:00

## Delivery
Build, Own, Operate (BOO).
Status: reported
Attribution: acwapower.com
Source: acwapower.com — https://acwapower.com/en/what-we-do/projects/ar-rass-2-solar-pv-ipp/ | published unknown | observed 2026-10-18T06:45:31.975414+00:00

## Location
Ar Rass, Qassim Province, KSA (Saudi Arabia).
Status: reported
Attribution: acwapower.com
Source: acwapower.com — https://acwapower.com/en/what-we-do/projects/ar-rass-2-solar-pv-ipp/ | published unknown | observed 2026-10-18T06:45:31.975414+00:00

## Developer
ACWA Power is identified as developer and is described as leading construction, engineering, operation, and maintenance of the plant.
Status: reported
Attribution: acwapower.com
Source: acwapower.com — https://acwapower.com/en/what-we-do/projects/ar-rass-2-solar-pv-ipp/ | published unknown | observed 2026-10-18T06:45:31.975414+00:00

## Documented Package
The page lists an Environmental & Social Impact Assessment, an Environmental & Social Impact Assessment Addendum, and ESIA Volume I Non-Technical Summary under Key documents; the documents themselves were not acquired here.
Status: reported
Attribution: acwapower.com
Source: acwapower.com — https://acwapower.com/en/what-we-do/projects/ar-rass-2-solar-pv-ipp/ | published unknown | observed 2026-10-18T06:45:31.975414+00:00


## Cite this dossier

CapexCue — Ar Rass 2 Solar PV IPP — dossier released 2026-10-18T06:59:28.929306+00:00, release 1 (7aa30509-5009-4ff7-bf0d-6bff33a5d2c6) — https://capexcue.com/projects/ar-rass-2-solar-pv-ipp-b3431a42-770/.

For current information and later dossier updates, visit <https://capexcue.com/projects/ar-rass-2-solar-pv-ipp-b3431a42-770/>.
This file records the release identified above; the current dossier may change.