{"name": "AQUIND Interconnector", "slug": "rr21-aquind-pins-v1", "as_of": "2026-10-01T01:48:09.581492+00:00", "depth": "basic", "facts": {"name": {"value": "AQUIND Interconnector", "rights": "facts_only", "source": {"url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN020022", "name": "Planning Inspectorate", "origin": "live", "checksum": "d12b545fc2beb83dd5aac91e8946966b3c2a70790613d8e6a74057afacf196c7", "observed_at": "2026-10-01T01:36:43.217844+00:00", "revision_id": "5c135b93-0bfc-4f31-bb6a-d9f34f5572c8", "published_at": null}, "locator": "native-name-name", "claim_id": "e6a4a038-f1b4-45a8-ab57-68a642b74441", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "Planning Inspectorate", "evidence_id": "65a77945-02d9-4313-a182-eae19b96baa9", "valid_until": null, "assertion_id": "59bdc8d2-57f7-4ff6-bb47-2d0d03e14a6b", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "Development of AQUIND Interconnector with a nominal net capacity of 2000MW between Great Britain and France located off the coast of Portsmouth offshore and between Portsmouth and Lovedean substation onshore.", "rights": "facts_only", "source": {"url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN020022", "name": "Planning Inspectorate", "origin": "live", "checksum": "d12b545fc2beb83dd5aac91e8946966b3c2a70790613d8e6a74057afacf196c7", "observed_at": "2026-10-01T01:36:43.217844+00:00", "revision_id": "5c135b93-0bfc-4f31-bb6a-d9f34f5572c8", "published_at": null}, "locator": "native-scope-scope", "claim_id": "1cabae78-b0a6-4227-997f-74117d478a50", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "Planning Inspectorate", "evidence_id": "8274a91d-6b50-4e5f-bcdb-9143d0b1172f", "valid_until": null, "assertion_id": "05dabe91-076d-4b4e-9311-583884e2a920", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "From the UK seaward limit in the English Channel to Lovedean Substation.", "rights": "facts_only", "source": {"url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN020022", "name": "Planning Inspectorate", "origin": "live", "checksum": "d12b545fc2beb83dd5aac91e8946966b3c2a70790613d8e6a74057afacf196c7", "observed_at": "2026-10-01T01:36:43.217844+00:00", "revision_id": "5c135b93-0bfc-4f31-bb6a-d9f34f5572c8", "published_at": null}, "locator": "native-location-location", "claim_id": "06c67c91-774c-40a4-8bd1-aa3c735070ea", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "Planning Inspectorate", "evidence_id": "09babf13-1bb5-42e9-b39b-4f64fe9334b8", "valid_until": null, "assertion_id": "de927b17-1fa2-4b21-bd15-2bf0d7cf9f20", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "80ed9056-c389-4725-8f50-57db45f31689", "publication": {"local_only": false, "reviewed_at": "2026-10-16T15:47:55.224961+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "AQUIND Interconnector is described as a planned 2,000 MW connection between Great Britain and France, offshore Portsmouth and onshore between Portsmouth and Lovedean substation. The stated route runs from the UK seaward limit in the English Channel to Lovedean Substation. The supplied project-page text labels the project as at the decision stage; that statement is undated. Evidence observation is recorded as 1 October 2026; this is not the date of the stage statement.", "schema_version": "1.0", "public_unknowns": ["The supplied evidence is the registered native project-page paragraph representation, not a whole-document review. Email-containing and link-only paragraphs were excluded; linked documents and graphical content were not reviewed.", "Later project progress and purchasing availability are not established by the supplied evidence.", "Procurement status, contractor, budget, financing and specific equipment-package needs are not established by the supplied project-page paragraphs."], "evidence_observed_at": "2026-10-01T01:36:43.217844+00:00", "knowledge_reviewed_at": "2026-10-16T15:47:55.224961+00:00", "decisive_evidence_observed_at": "2026-10-01T01:36:43.217844+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "AQUIND Interconnector", "original_project_title": "AQUIND Interconnector", "canonical_url": "https://capexcue.com/projects/rr21-aquind-pins-v1/", "release": {"id": "6239d1cf-899d-4749-9009-20ca1f10233e", "number": 1, "published_at": "2026-10-16T15:47:55.674863+00:00"}, "release_reference": "release 1 (6239d1cf-899d-4749-9009-20ca1f10233e)", "current_dossier_url": "https://capexcue.com/projects/rr21-aquind-pins-v1/", "citation": "CapexCue \u2014 AQUIND Interconnector \u2014 dossier released 2026-10-16T15:47:55.674863+00:00, release 1 (6239d1cf-899d-4749-9009-20ca1f10233e) \u2014 https://capexcue.com/projects/rr21-aquind-pins-v1/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "independently_reviewed_metadata", "value": "energy", "support": {"end": 208, "start": 0, "sources": [{"url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN020022", "name": "Planning Inspectorate", "origin": "live", "checksum": "d12b545fc2beb83dd5aac91e8946966b3c2a70790613d8e6a74057afacf196c7", "observed_at": "2026-10-01T01:36:43.217844+00:00", "revision_id": "5c135b93-0bfc-4f31-bb6a-d9f34f5572c8", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "Development of AQUIND Interconnector with a nominal net capacity of 2000MW between Great Britain and France located off the coast of Portsmouth offshore and between Portsmouth and Lovedean substation onshore.", "statement": "Development of AQUIND Interconnector with a nominal net capacity of 2000MW between Great Britain and France located off the coast of Portsmouth offshore and between Portsmouth and Lovedean substation onshore.", "qualifications": {"attribution": "Planning Inspectorate"}}, "label": "Energy", "icon": "energy"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "independently_reviewed_metadata", "value": "energy", "support": {"end": 208, "start": 0, "sources": [{"url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN020022", "name": "Planning Inspectorate", "origin": "live", "checksum": "d12b545fc2beb83dd5aac91e8946966b3c2a70790613d8e6a74057afacf196c7", "observed_at": "2026-10-01T01:36:43.217844+00:00", "revision_id": "5c135b93-0bfc-4f31-bb6a-d9f34f5572c8", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "Development of AQUIND Interconnector with a nominal net capacity of 2000MW between Great Britain and France located off the coast of Portsmouth offshore and between Portsmouth and Lovedean substation onshore.", "statement": "Development of AQUIND Interconnector with a nominal net capacity of 2000MW between Great Britain and France located off the coast of Portsmouth offshore and between Portsmouth and Lovedean substation onshore.", "qualifications": {"attribution": "Planning Inspectorate"}}}, "input_hash": "7beb4566f499efdea46bd8c44e44d32534a39bb4b2a7d52cf0851a690df06a46", "release_id": "6239d1cf-899d-4749-9009-20ca1f10233e", "type_codes": ["electricity_transmission"], "field_states": {"type": {"state": "accepted", "reason": "The planned interconnector comprises an offshore segment and an onshore route between Portsmouth and Lovedean Substation, supporting the electricity transmission type."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "The supplied location and scope describe a cross-border asset extending from the UK seaward limit and connecting Great Britain and France. Both countries are retained; neither is selected arbitrarily."}, "category": {"state": "accepted", "reason": "The planned 2000 MW interconnector is an electricity transmission asset. Its scope includes offshore and onshore portions; no separate supported primary category is indicated."}}, "region_codes": ["europe"], "release_hash": "80b63e89d0f75bba8422b332cec9358d14c1724d9beec204a0c9b30bda428f06", "assessment_id": "15cb2459-3450-4d05-a0d5-de764cc92ab5", "country_codes": ["FR", "GB"], "assessment_hash": "67dcbcf2984b83f037d44a3f0b987e307397b35c6bbd5865b2459c4f92e9fb39", "country_label": "France, United Kingdom", "region_label": "Europe", "type_labels": ["Electricity Transmission"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}