# AQUIND Interconnector

Publisher: CapexCue
Canonical dossier: <https://capexcue.com/projects/rr21-aquind-pins-v1/>
Dossier reference: release 1 (6239d1cf-899d-4749-9009-20ca1f10233e)

Released project intelligence

Oldest supporting observation: 2026-10-01T01:36:43.217844+00:00
Dossier released: 2026-10-16T15:47:55.674863+00:00
Source report dates and capture dates are listed per fact below; neither establishes an event date.

## Project summary

AQUIND Interconnector is described as a planned 2,000 MW connection between Great Britain and France, offshore Portsmouth and onshore between Portsmouth and Lovedean substation. The stated route runs from the UK seaward limit in the English Channel to Lovedean Substation. The supplied project-page text labels the project as at the decision stage; that statement is undated. Evidence observation is recorded as 1 October 2026; this is not the date of the stage statement.

## Evidence limits and unknowns

- The supplied evidence is the registered native project-page paragraph representation, not a whole-document review. Email-containing and link-only paragraphs were excluded; linked documents and graphical content were not reviewed.
- Later project progress and purchasing availability are not established by the supplied evidence.
- Procurement status, contractor, budget, financing and specific equipment-package needs are not established by the supplied project-page paragraphs.

Current purchasing availability: unknown.
Source-dated plans do not establish current progress or available supplier packages.

## Project metadata

Country: France, United Kingdom
Region: Europe
Physical assets: Electricity Transmission
Derived from the exact released evidence; unresolved fields remain unclassified.

## Project category

Energy
Derived from the reviewed scope statement; delivery stage remains unclassified.
Development of AQUIND Interconnector with a nominal net capacity of 2000MW between Great Britain and France located off the coast of Portsmouth offshore and between Portsmouth and Lovedean substation onshore.
Source: Planning Inspectorate — https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN020022 | published unknown | observed 2026-10-01T01:36:43.217844+00:00

Project overview
Oldest decisive evidence: 2026-10-01T01:36:43.217844+00:00
Newest evidence: 2026-10-01T01:36:43.217844+00:00
Knowledge reviewed: 2026-10-16T15:47:55.224961+00:00
Publication reviewed: 2026-10-16T15:47:55.224961+00:00

## Name
AQUIND Interconnector
Status: reported
Attribution: Planning Inspectorate
Source: Planning Inspectorate — https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN020022 | published unknown | observed 2026-10-01T01:36:43.217844+00:00

## Scope
Development of AQUIND Interconnector with a nominal net capacity of 2000MW between Great Britain and France located off the coast of Portsmouth offshore and between Portsmouth and Lovedean substation onshore.
Status: planned
Attribution: Planning Inspectorate
Source: Planning Inspectorate — https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN020022 | published unknown | observed 2026-10-01T01:36:43.217844+00:00

## Location
From the UK seaward limit in the English Channel to Lovedean Substation.
Status: reported
Attribution: Planning Inspectorate
Source: Planning Inspectorate — https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN020022 | published unknown | observed 2026-10-01T01:36:43.217844+00:00


## Cite this dossier

CapexCue — AQUIND Interconnector — dossier released 2026-10-16T15:47:55.674863+00:00, release 1 (6239d1cf-899d-4749-9009-20ca1f10233e) — https://capexcue.com/projects/rr21-aquind-pins-v1/.

For current information and later dossier updates, visit <https://capexcue.com/projects/rr21-aquind-pins-v1/>.
This file records the release identified above; the current dossier may change.