{"name": "Nya vattenverket (Pireva\u2019s new waterworks).", "slug": "nya-vattenverket-pirevas-new-waterworks-c11e0754-b80", "as_of": "2026-10-19T05:27:31.613487+00:00", "depth": "basic", "facts": {"name": {"value": "Nya vattenverket (Pireva\u2019s new waterworks).", "rights": "facts_only", "source": {"url": "https://www.pireva.se/hushall/vatten-och-avlopp/dricksvatten/nya-vattenverket/", "name": "www.pireva.se", "origin": "live", "checksum": "69a6b037bf9392dd7ff06459d799b5c1682dc30ad2d570ad0758be89cef7f9b0", "observed_at": "2026-10-19T05:23:27.399363+00:00", "revision_id": "2c95918e-4935-4f54-be36-9048126ce5b9", "published_at": null}, "locator": "/html/body/nav/div/main/section/div[2]/div/div/div[1]/div/div/div/span/text-position:25", "claim_id": "e145ff72-057b-4687-8cc9-a7ec8990f83f", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.pireva.se", "evidence_id": "0126ab8f-ee00-4483-90bd-6912244de1c3", "valid_until": null, "assertion_id": "c2804a7f-b9f4-46a8-82aa-debc3aa02cea", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "Planned new drinking-water treatment plant beside the existing Deger\u00e4nget works; proposed treatment includes ultrafilter, ozone and carbon filtration. The existing facilities are planned for demolition once the new plant is complete.", "rights": "facts_only", "source": {"url": "https://www.pireva.se/hushall/vatten-och-avlopp/dricksvatten/nya-vattenverket/", "name": "www.pireva.se", "origin": "live", "checksum": "69a6b037bf9392dd7ff06459d799b5c1682dc30ad2d570ad0758be89cef7f9b0", "observed_at": "2026-10-19T05:23:27.399363+00:00", "revision_id": "2c95918e-4935-4f54-be36-9048126ce5b9", "published_at": null}, "locator": "/html/body/nav/div/main/section/div[2]/div/div/div[1]/p", "claim_id": "1366ce80-d148-434d-a0d8-9111f4fe549d", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "www.pireva.se", "evidence_id": "f834b546-9cc0-4e2f-a81e-e69621487dfc", "valid_until": null, "assertion_id": "645a71b5-c5f5-41f8-9f0c-a931e68804d6", "temporal_expression": "", "extraction_confidence": 0.9}, "sector": {"value": "Municipal drinking-water production and treatment.", "rights": "facts_only", "source": {"url": "https://www.pireva.se/hushall/vatten-och-avlopp/dricksvatten/nya-vattenverket/", "name": "www.pireva.se", "origin": "live", "checksum": "69a6b037bf9392dd7ff06459d799b5c1682dc30ad2d570ad0758be89cef7f9b0", "observed_at": "2026-10-19T05:23:27.399363+00:00", "revision_id": "2c95918e-4935-4f54-be36-9048126ce5b9", "published_at": null}, "locator": "/html/body/nav/div/main/div/div/div[1]/section[1]/div/p[3]", "claim_id": "170401c2-1f28-4f6e-bc96-ab670e837503", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.pireva.se", "evidence_id": "da129952-db43-48e7-ba63-8ca2e8a3fb0d", "valid_until": null, "assertion_id": "1696625c-6b02-44e6-84cc-f02b4b7a6938", "temporal_expression": "", "extraction_confidence": 0.9}, "ecology": {"value": "The proposed site affects a valued natural area. Work is reported to be underway to limit forest land use; plant and animal life, with particular focus on birds and bats, has been mapped.", "rights": "facts_only", "source": {"url": "https://www.pireva.se/hushall/vatten-och-avlopp/dricksvatten/nya-vattenverket/", "name": "www.pireva.se", "origin": "live", "checksum": "69a6b037bf9392dd7ff06459d799b5c1682dc30ad2d570ad0758be89cef7f9b0", "observed_at": "2026-10-19T05:23:27.399363+00:00", "revision_id": "2c95918e-4935-4f54-be36-9048126ce5b9", "published_at": null}, "locator": "/html/body/nav/div/main/div/div/div[1]/section[1]/div/p[7]", "claim_id": "ffb86ae4-471f-4ea8-8aab-63dbeb2e2c76", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.pireva.se", "evidence_id": "e22b74c9-f434-45b5-9636-21ddc30bd6ba", "valid_until": null, "assertion_id": "828bbcd9-2f56-4c6a-a10b-f5d1e4cbc159", "temporal_expression": "", "extraction_confidence": 0.9}, "sponsor": {"value": "Pireva presents the project and its investment; detailed-plan work is being carried out in cooperation with Pite\u00e5 municipality.", "rights": "facts_only", "source": {"url": "https://www.pireva.se/hushall/vatten-och-avlopp/dricksvatten/nya-vattenverket/", "name": "www.pireva.se", "origin": "live", "checksum": "69a6b037bf9392dd7ff06459d799b5c1682dc30ad2d570ad0758be89cef7f9b0", "observed_at": "2026-10-19T05:23:27.399363+00:00", "revision_id": "2c95918e-4935-4f54-be36-9048126ce5b9", "published_at": null}, "locator": "/html/body/nav/div/main/div/div/div[1]/section[1]/div/p[2]", "claim_id": "f5d0382f-07e7-4f2f-994f-b0ce213c088e", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.pireva.se", "evidence_id": "238f9adc-8d21-4c71-aa4c-7dfa9e361f9a", "valid_until": null, "assertion_id": "2ab62bce-18b2-4808-b99a-0465e4d93dd5", "temporal_expression": "", "extraction_confidence": 0.9}, "activity": {"value": "The project is in the planning and investigation stage. Pite\u00e5 municipality is reviewing and compiling comments received on the detailed plan; a first consultation was held on 10 February 2026.", "rights": "facts_only", "source": {"url": "https://www.pireva.se/hushall/vatten-och-avlopp/dricksvatten/nya-vattenverket/", "name": "www.pireva.se", "origin": "live", "checksum": "69a6b037bf9392dd7ff06459d799b5c1682dc30ad2d570ad0758be89cef7f9b0", "observed_at": "2026-10-19T05:23:27.399363+00:00", "revision_id": "2c95918e-4935-4f54-be36-9048126ce5b9", "published_at": null}, "locator": "/html/body/nav/div/main/div/div/div[1]/section[1]/div/p[8]", "claim_id": "b3be2616-d137-4fec-826d-4eade1081709", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.pireva.se", "evidence_id": "f6a182ec-5c2f-4d1b-af69-3e9532f703b4", "valid_until": null, "assertion_id": "d5a4c870-b34f-4174-b05b-62414f35f603", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Proposed site directly adjacent to the existing Deger\u00e4nget waterworks in \u00d6jebyn, Pite\u00e5 municipality.", "rights": "facts_only", "source": {"url": "https://www.pireva.se/hushall/vatten-och-avlopp/dricksvatten/nya-vattenverket/", "name": "www.pireva.se", "origin": "live", "checksum": "69a6b037bf9392dd7ff06459d799b5c1682dc30ad2d570ad0758be89cef7f9b0", "observed_at": "2026-10-19T05:23:27.399363+00:00", "revision_id": "2c95918e-4935-4f54-be36-9048126ce5b9", "published_at": null}, "locator": "/html/body/nav/div/main/div/div/div[1]/section[1]/div/p[6]", "claim_id": "0884626a-248d-4d96-a341-2e30685f234e", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "www.pireva.se", "evidence_id": "7eba71d7-59b3-4fca-a7d6-a0d2441ffb29", "valid_until": null, "assertion_id": "0071fe8f-7825-46fc-8eeb-378ffc8087e1", "temporal_expression": "", "extraction_confidence": 0.9}, "procurement": {"value": "Procurement of the party to design and build the waterworks is planned no earlier than the end of 2027. The project is planned as a collaborative design-build contract (totalentreprenad i samverkan).", "rights": "facts_only", "source": {"url": "https://www.pireva.se/hushall/vatten-och-avlopp/dricksvatten/nya-vattenverket/", "name": "www.pireva.se", "origin": "live", "checksum": "69a6b037bf9392dd7ff06459d799b5c1682dc30ad2d570ad0758be89cef7f9b0", "observed_at": "2026-10-19T05:23:27.399363+00:00", "revision_id": "2c95918e-4935-4f54-be36-9048126ce5b9", "published_at": null}, "locator": "/html/body/nav/div/main/div/div/div[1]/section[1]/div/ul[2]/li[3]", "claim_id": "7a40432d-a029-4089-a347-fd3e5ca5c2e0", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "www.pireva.se", "evidence_id": "2673165a-fa69-47c5-b307-90745a3eaddc", "valid_until": null, "assertion_id": "e1616c30-209c-4aeb-9529-8cdd08b7e2dc", "temporal_expression": "", "extraction_confidence": 0.9}, "next_milestone": {"value": "Planned detailed-plan steps include responding to consultation comments, supplementary investigations and revising the plan, followed by review and eventual adoption.", "rights": "facts_only", "source": {"url": "https://www.pireva.se/hushall/vatten-och-avlopp/dricksvatten/nya-vattenverket/", "name": "www.pireva.se", "origin": "live", "checksum": "69a6b037bf9392dd7ff06459d799b5c1682dc30ad2d570ad0758be89cef7f9b0", "observed_at": "2026-10-19T05:23:27.399363+00:00", "revision_id": "2c95918e-4935-4f54-be36-9048126ce5b9", "published_at": null}, "locator": "/html/body/nav/div/main/div/div/div[1]/section[1]/div/p[2]", "claim_id": "2a97b355-f158-45c4-a24e-def8c88ef092", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "www.pireva.se", "evidence_id": "238f9adc-8d21-4c71-aa4c-7dfa9e361f9a", "valid_until": null, "assertion_id": "64e7916b-2855-4adf-b5f8-274efacaf35d", "temporal_expression": "", "extraction_confidence": 0.9}, "financing_amount": {"value": "Estimated investment cost of approximately SEK 980 million, including demolition of the existing waterworks, at 2024 price levels; this is a cost estimate, not evidence of an approved budget.", "rights": "facts_only", "source": {"url": "https://www.pireva.se/hushall/vatten-och-avlopp/dricksvatten/nya-vattenverket/", "name": "www.pireva.se", "origin": "live", "checksum": "69a6b037bf9392dd7ff06459d799b5c1682dc30ad2d570ad0758be89cef7f9b0", "observed_at": "2026-10-19T05:23:27.399363+00:00", "revision_id": "2c95918e-4935-4f54-be36-9048126ce5b9", "published_at": null}, "locator": "/html/body/nav/div/main/div/div/div[1]/section[2]/div/div[3]/button/text-position:129", "claim_id": "a3920dc3-6066-4539-85e4-ccb59d68c81a", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.pireva.se", "evidence_id": "fe939dc8-f0cf-48d0-ad74-287a4b863059", "valid_until": null, "assertion_id": "63baada1-4f17-4518-b3c0-adda3d3b1aca", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "91aab789-fe23-4327-b949-83884ed80b2f", "publication": {"local_only": false, "reviewed_at": "2026-10-19T05:29:38.994455+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "Nya vattenverket is a planned drinking-water treatment plant proposed beside the existing Deger\u00e4nget waterworks in \u00d6jebyn, Pite\u00e5 municipality. The proposed treatment includes ultrafilter, ozone and carbon filtration; the existing facilities are planned for demolition after the new plant is complete. \n\nThe project is reported to be in planning and investigation. A first detailed-plan consultation was held on 10 February 2026, and the municipality is reviewing comments. The page lists responding to comments, supplementary investigations and plan revision among the next steps. \n\nProcurement of the design-and-build party is planned no earlier than the end of 2027; this does not establish that a tender is currently open. The reported investment estimate is approximately SEK 980 million, including demolition, at 2024 price levels.", "schema_version": "1.0", "public_unknowns": ["The source observed 2026-10-19 does not state plant capacity or design flow.", "The source observed 2026-10-19 does not state construction, commissioning or completion dates.", "The source observed 2026-10-19 does not report an awarded supplier or confirm an open procurement.", "The investment figure is stated as an estimate; the source does not establish an approved budget or financing arrangement."], "evidence_observed_at": "2026-10-19T05:23:27.399363+00:00", "knowledge_reviewed_at": "2026-10-19T05:27:31.890989+00:00", "decisive_evidence_observed_at": "2026-10-19T05:23:27.399363+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Nya vattenverket (Pireva\u2019s new waterworks).", "original_project_title": "Nya vattenverket (Pireva\u2019s new waterworks).", "canonical_url": "https://capexcue.com/projects/nya-vattenverket-pirevas-new-waterworks-c11e0754-b80/", "release": {"id": "9d17808f-597d-4d00-bdc2-bf0b10842ebb", "number": 1, "published_at": "2026-10-19T05:29:52.809997+00:00"}, "release_reference": "release 1 (9d17808f-597d-4d00-bdc2-bf0b10842ebb)", "current_dossier_url": "https://capexcue.com/projects/nya-vattenverket-pirevas-new-waterworks-c11e0754-b80/", "citation": "CapexCue \u2014 Nya vattenverket (Pireva\u2019s new waterworks). \u2014 dossier released 2026-10-19T05:29:52.809997+00:00, release 1 (9d17808f-597d-4d00-bdc2-bf0b10842ebb) \u2014 https://capexcue.com/projects/nya-vattenverket-pirevas-new-waterworks-c11e0754-b80/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "codex_retained_dossier_curation", "value": "water_environment", "support": {"end": 233, "start": 0, "sources": [{"url": "https://www.pireva.se/hushall/vatten-och-avlopp/dricksvatten/nya-vattenverket/", "name": "www.pireva.se", "origin": "live", "checksum": "69a6b037bf9392dd7ff06459d799b5c1682dc30ad2d570ad0758be89cef7f9b0", "observed_at": "2026-10-19T05:23:27.399363+00:00", "revision_id": "2c95918e-4935-4f54-be36-9048126ce5b9", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "Planned new drinking-water treatment plant beside the existing Deger\u00e4nget works; proposed treatment includes ultrafilter, ozone and carbon filtration. The existing facilities are planned for demolition once the new plant is complete.", "statement": "Planned new drinking-water treatment plant beside the existing Deger\u00e4nget works; proposed treatment includes ultrafilter, ozone and carbon filtration. The existing facilities are planned for demolition once the new plant is complete.", "qualifications": {"attribution": "www.pireva.se"}}, "label": "Water and environment", "icon": "water"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "codex_retained_dossier_curation", "value": "water_environment", "support": {"end": 233, "start": 0, "sources": [{"url": "https://www.pireva.se/hushall/vatten-och-avlopp/dricksvatten/nya-vattenverket/", "name": "www.pireva.se", "origin": "live", "checksum": "69a6b037bf9392dd7ff06459d799b5c1682dc30ad2d570ad0758be89cef7f9b0", "observed_at": "2026-10-19T05:23:27.399363+00:00", "revision_id": "2c95918e-4935-4f54-be36-9048126ce5b9", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "Planned new drinking-water treatment plant beside the existing Deger\u00e4nget works; proposed treatment includes ultrafilter, ozone and carbon filtration. The existing facilities are planned for demolition once the new plant is complete.", "statement": "Planned new drinking-water treatment plant beside the existing Deger\u00e4nget works; proposed treatment includes ultrafilter, ozone and carbon filtration. The existing facilities are planned for demolition once the new plant is complete.", "qualifications": {"attribution": "www.pireva.se"}}}, "input_hash": "87cc57b2074264a5831e5011e8fa99a5be164e88ad6db9c08ea6f18e72931c9f", "release_id": "9d17808f-597d-4d00-bdc2-bf0b10842ebb", "type_codes": ["drinking_water"], "field_states": {"type": {"state": "accepted", "reason": "Pitea and Ojebyn identify Sweden; municipal drinking-water treatment is explicit."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "Pitea and Ojebyn identify Sweden; municipal drinking-water treatment is explicit."}, "category": {"state": "accepted", "reason": "Pitea and Ojebyn identify Sweden; municipal drinking-water treatment is explicit."}}, "region_codes": ["europe"], "release_hash": "9df26771e7820b5701d828243e0f4b5cced47b8c7983ecaa18a304cb4aeeb64e", "assessment_id": "a427900c-6c41-4f71-ba74-901856bda00a", "country_codes": ["SE"], "assessment_hash": "0d6ef10fc9710b014027e083e82107c21724bc19f23e6f0440aed13d83b422e1", "country_label": "Sweden", "region_label": "Europe", "type_labels": ["Drinking Water"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}