{"name": "50MW/100MWh Bouldercombe Battery Project", "slug": "50mw100mwh-bouldercombe-battery-project-81ed5f5f-219", "as_of": "2026-10-17T14:34:11.784753+00:00", "depth": "basic", "facts": {"name": {"value": "50MW/100MWh Bouldercombe Battery Project", "rights": "facts_only", "source": {"url": "https://genexpower.com.au/bouldercombe-battery-project/", "name": "genexpower.com.au", "origin": "live", "checksum": "3be5559aa6e04a3a49ebd4c8caa5229898e2b8492bddd6583faf667ed6b14cb5", "observed_at": "2026-10-17T14:12:38.028445+00:00", "revision_id": "ebb39777-70e1-4bf7-8853-96086b1c261f", "published_at": null}, "locator": "/html/body/div/div[1]/div[2]/div[1]/div[1]/div/div/div/div[1]/div/div/div[1]/h1", "claim_id": "2ab5ace6-1969-41d0-8369-c8105c5b80ef", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "genexpower.com.au", "evidence_id": "9fd8ccc8-1bbb-4e9d-aca1-4a95384b0804", "valid_until": null, "assertion_id": "6d19c285-d680-42d3-843e-9dfbe23a8e77", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "50 MW/100 MWh large-scale battery energy storage project (BESS), built using Tesla Megapack 2.0 hardware.", "rights": "facts_only", "source": {"url": "https://genexpower.com.au/bouldercombe-battery-project/", "name": "genexpower.com.au", "origin": "live", "checksum": "3be5559aa6e04a3a49ebd4c8caa5229898e2b8492bddd6583faf667ed6b14cb5", "observed_at": "2026-10-17T14:12:38.028445+00:00", "revision_id": "ebb39777-70e1-4bf7-8853-96086b1c261f", "published_at": null}, "locator": "/html/body/div/div[1]/div[2]/div[2]/div[1]/div/div/div[5]/div/p[1]", "claim_id": "14bf2b3c-3eca-46f4-abe4-4fd62689db45", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "genexpower.com.au", "evidence_id": "6ce676cc-3f1a-4fc4-ad13-930fcd381aa0", "valid_until": null, "assertion_id": "7cff8b51-0c7b-47d3-bc61-fe0e0ee33f68", "temporal_expression": "", "extraction_confidence": 0.9}, "activity": {"value": "Described as operational and in full commercial operations from 2H CY2023.", "rights": "facts_only", "source": {"url": "https://genexpower.com.au/bouldercombe-battery-project/", "name": "genexpower.com.au", "origin": "live", "checksum": "3be5559aa6e04a3a49ebd4c8caa5229898e2b8492bddd6583faf667ed6b14cb5", "observed_at": "2026-10-17T14:12:38.028445+00:00", "revision_id": "ebb39777-70e1-4bf7-8853-96086b1c261f", "published_at": null}, "locator": "/html/body/div/div[1]/div[2]/div[1]/div[1]/div/div/div/div[1]/div/div/div[2]/div/h4", "claim_id": "159b78dd-762d-4087-bfbb-73098e9e0112", "modality": "actual", "confidence": 0.9, "valid_from": null, "attribution": "genexpower.com.au", "evidence_id": "6bbdaf77-8395-4ce4-b65c-897bbef9e179", "valid_until": null, "assertion_id": "7a9fbb51-43ca-4343-93ac-39f2226c4e7e", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Rockhampton", "rights": "facts_only", "source": {"url": "https://genexpower.com.au/bouldercombe-battery-project/", "name": "genexpower.com.au", "origin": "live", "checksum": "3be5559aa6e04a3a49ebd4c8caa5229898e2b8492bddd6583faf667ed6b14cb5", "observed_at": "2026-10-17T14:12:38.028445+00:00", "revision_id": "ebb39777-70e1-4bf7-8853-96086b1c261f", "published_at": null}, "locator": "/html/body/div/div[1]/div[2]/div[1]/div[1]/div/div/div/div[1]/div/div/div[2]/div/h4", "claim_id": "d5379669-1772-4ffa-b902-dacc2534f1bc", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "genexpower.com.au", "evidence_id": "6bbdaf77-8395-4ce4-b65c-897bbef9e179", "valid_until": null, "assertion_id": "34493cfa-180a-472d-bfc2-42d573a9937f", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "94919501-b7ec-4edd-9595-de33b133a89f", "publication": {"local_only": false, "reviewed_at": "2026-10-17T14:35:36.538446+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "The Bouldercombe Battery Project is a 50 MW/100 MWh battery energy storage project in Rockhampton, built using Tesla Megapack 2.0 hardware. Genex describes it as operational and reports full commercial operations from 2H CY2023.", "schema_version": "1.0", "public_unknowns": ["The supplied page does not document whether a separate expansion, augmentation, replacement, or other procurement is planned, whether any supplier opportunity is open, or buying-window dates."], "evidence_observed_at": "2026-10-17T14:12:38.028445+00:00", "knowledge_reviewed_at": "2026-10-17T14:34:12.037528+00:00", "decisive_evidence_observed_at": "2026-10-17T14:12:38.028445+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "50MW/100MWh Bouldercombe Battery Project", "original_project_title": "50MW/100MWh Bouldercombe Battery Project", "canonical_url": "https://capexcue.com/projects/50mw100mwh-bouldercombe-battery-project-81ed5f5f-219/", "release": {"id": "b68fe8c1-e41b-46c3-b457-5610e913121b", "number": 1, "published_at": "2026-10-17T14:35:56.026707+00:00"}, "release_reference": "release 1 (b68fe8c1-e41b-46c3-b457-5610e913121b)", "current_dossier_url": "https://capexcue.com/projects/50mw100mwh-bouldercombe-battery-project-81ed5f5f-219/", "citation": "CapexCue \u2014 50MW/100MWh Bouldercombe Battery Project \u2014 dossier released 2026-10-17T14:35:56.026707+00:00, release 1 (b68fe8c1-e41b-46c3-b457-5610e913121b) \u2014 https://capexcue.com/projects/50mw100mwh-bouldercombe-battery-project-81ed5f5f-219/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [{"title": "Project \u00b7 Commercial operations began", "event_time": "2H CY2023", "precision": "half-year", "status": "Reported event", "modality": "actual", "elapsed_plan": false, "corroboration": "uncorroborated", "limitations": ["This source report does not establish current progress."], "sources": [{"name": "genexpower.com.au", "url": "https://genexpower.com.au/bouldercombe-battery-project/", "published_at": null, "observed_at": "2026-10-17T14:12:38.028445+00:00", "revision_id": "ebb39777-70e1-4bf7-8853-96086b1c261f", "checksum": "3be5559aa6e04a3a49ebd4c8caa5229898e2b8492bddd6583faf667ed6b14cb5"}], "reference": "released-statement:activity:0:74:commercial_operations_began", "provenance": {"kind": "released_statement", "rule": "commercial_operations_began-v1", "predicate": "activity", "start": 0, "end": 74, "statement": "Described as operational and in full commercial operations from 2H CY2023.", "modality": "actual", "sources": [{"url": "https://genexpower.com.au/bouldercombe-battery-project/", "name": "genexpower.com.au", "origin": "live", "checksum": "3be5559aa6e04a3a49ebd4c8caa5229898e2b8492bddd6583faf667ed6b14cb5", "observed_at": "2026-10-17T14:12:38.028445+00:00", "revision_id": "ebb39777-70e1-4bf7-8853-96086b1c261f", "published_at": null}], "qualifications": {"attribution": "genexpower.com.au"}}}], "project_category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 105, "type": "battery_storage", "start": 0, "sources": [{"url": "https://genexpower.com.au/bouldercombe-battery-project/", "name": "genexpower.com.au", "origin": "live", "checksum": "3be5559aa6e04a3a49ebd4c8caa5229898e2b8492bddd6583faf667ed6b14cb5", "observed_at": "2026-10-17T14:12:38.028445+00:00", "revision_id": "ebb39777-70e1-4bf7-8853-96086b1c261f", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "50 MW/100 MWh large-scale battery energy storage project (BESS), built using Tesla Megapack 2.0 hardware.", "statement": "50 MW/100 MWh large-scale battery energy storage project (BESS), built using Tesla Megapack 2.0 hardware.", "qualifications": {"attribution": "genexpower.com.au"}}, "label": "Energy", "icon": "energy"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 105, "type": "battery_storage", "start": 0, "sources": [{"url": "https://genexpower.com.au/bouldercombe-battery-project/", "name": "genexpower.com.au", "origin": "live", "checksum": "3be5559aa6e04a3a49ebd4c8caa5229898e2b8492bddd6583faf667ed6b14cb5", "observed_at": "2026-10-17T14:12:38.028445+00:00", "revision_id": "ebb39777-70e1-4bf7-8853-96086b1c261f", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "50 MW/100 MWh large-scale battery energy storage project (BESS), built using Tesla Megapack 2.0 hardware.", "statement": "50 MW/100 MWh large-scale battery energy storage project (BESS), built using Tesla Megapack 2.0 hardware.", "qualifications": {"attribution": "genexpower.com.au"}}}, "input_hash": "9b85ca028ebf2581d3d04fa46dea836a263522cea64f554f4226f9547f15d338", "release_id": "b68fe8c1-e41b-46c3-b457-5610e913121b", "type_codes": ["battery_storage"], "field_states": {"type": {"state": "accepted", "reason": "supported_physical_components"}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "Rockhampton and Bouldercombe are in Queensland, Australia."}, "category": {"state": "accepted", "reason": "supported_asset_type_category"}}, "region_codes": ["oceania"], "release_hash": "58d4a8a2358c67071bf9529bb45459442f908e13e851db65c7733ae9b3645793", "assessment_id": "b71c0271-d8d8-4d14-8a88-65bc569b3aba", "country_codes": ["AU"], "assessment_hash": "effbd3e0fa6a2d8aff289b10e04830d5e5ee389de22a1d9c90daff012fcc05cf", "country_label": "Australia", "region_label": "Oceania", "type_labels": ["Battery Storage"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}