{"name": "Rabigh 4 IWP. The document title says \u201cRabigh 4 IPP,\u201d while the body heading and description identify it as \u201cRabigh 4 IWP.\u201d", "slug": "rabigh-4-iwp-the-document-title-says-rabigh-4-ipp-while-the-body-heading-and-description-identify-it-as-rabigh-4-iwp-10c075bb-b5d", "as_of": "2026-10-17T17:00:48.854066+00:00", "depth": "basic", "facts": {"date": {"value": "Scheduled to be commissioned by 31 March 2026; the key facts list commercial operations in Q1 2026.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/rabigh-4-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "db78c909ff8b741c0402d296f5b5514461d6b281873481b768a58c58dc5aedcf", "observed_at": "2026-10-17T16:42:11.391537+00:00", "revision_id": "1f7ec978-a5fd-4624-8592-6c34c36feb82", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p", "claim_id": "39e9ea94-8d04-47e1-9a99-7bc4ea4e1f5e", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "f8cb35d4-df9e-4f7f-894a-e8069619d42c", "valid_until": null, "assertion_id": "0626dd66-a458-485b-b03d-7cd3633a3f26", "temporal_expression": "", "extraction_confidence": 0.9}, "name": {"value": "Rabigh 4 IWP. The document title says \u201cRabigh 4 IPP,\u201d while the body heading and description identify it as \u201cRabigh 4 IWP.\u201d", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/rabigh-4-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "db78c909ff8b741c0402d296f5b5514461d6b281873481b768a58c58dc5aedcf", "observed_at": "2026-10-17T16:42:11.391537+00:00", "revision_id": "1f7ec978-a5fd-4624-8592-6c34c36feb82", "published_at": null}, "locator": "/html/head/title", "claim_id": "1163a875-1059-496e-858b-508f82a78a4b", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "24692706-39c3-419c-982d-cf869890e7a0", "valid_until": null, "assertion_id": "10780ac9-d716-43fe-9f93-0e030f77fa0d", "temporal_expression": "", "extraction_confidence": 0.9}, "owner": {"value": "Consortium ownership reported as ACWA Power 45%, Haji Ali Reza (HAACO) 35%, and Al Moayyed 20%.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/rabigh-4-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "db78c909ff8b741c0402d296f5b5514461d6b281873481b768a58c58dc5aedcf", "observed_at": "2026-10-17T16:42:11.391537+00:00", "revision_id": "1f7ec978-a5fd-4624-8592-6c34c36feb82", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p", "claim_id": "9a4815cf-60e9-43eb-b492-beb3045db27d", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "f8cb35d4-df9e-4f7f-894a-e8069619d42c", "valid_until": null, "assertion_id": "5dff18e2-3beb-4f99-8495-d3aa4714b2e9", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "600,000 m\u00b3/day SWRO desalination plant, PWSF tank facility with 1,200,000 m\u00b3 capacity, and PV capacity of 6.804 MWp.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/rabigh-4-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "db78c909ff8b741c0402d296f5b5514461d6b281873481b768a58c58dc5aedcf", "observed_at": "2026-10-17T16:42:11.391537+00:00", "revision_id": "1f7ec978-a5fd-4624-8592-6c34c36feb82", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p", "claim_id": "842e2fd8-0ad0-496b-84ef-e893a0b6ad27", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "f8cb35d4-df9e-4f7f-894a-e8069619d42c", "valid_until": null, "assertion_id": "aa9b9762-6be0-49da-8113-3e4ff18783c8", "temporal_expression": "", "extraction_confidence": 0.9}, "sector": {"value": "Water desalination.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/rabigh-4-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "db78c909ff8b741c0402d296f5b5514461d6b281873481b768a58c58dc5aedcf", "observed_at": "2026-10-17T16:42:11.391537+00:00", "revision_id": "1f7ec978-a5fd-4624-8592-6c34c36feb82", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p", "claim_id": "37ac769c-d8ee-4d04-a488-0a906086098d", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "f8cb35d4-df9e-4f7f-894a-e8069619d42c", "valid_until": null, "assertion_id": "5c51e549-2928-47f7-ad97-0f5ba183c7dc", "temporal_expression": "", "extraction_confidence": 0.9}, "country": {"value": "Saudi Arabia.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/rabigh-4-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "db78c909ff8b741c0402d296f5b5514461d6b281873481b768a58c58dc5aedcf", "observed_at": "2026-10-17T16:42:11.391537+00:00", "revision_id": "1f7ec978-a5fd-4624-8592-6c34c36feb82", "published_at": null}, "locator": "/html/head/main/div/section[4]/div/ul/li[1]", "claim_id": "64751384-fa30-4624-b9b3-fa096d1fc8db", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "d64a4f10-aeca-48ab-a54e-79f420ffbb6e", "valid_until": null, "assertion_id": "cf763d94-0d53-4741-b1f7-87388373f05b", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Next to the existing Rabigh 3 IWP Plant; no more specific site location is stated.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/rabigh-4-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "db78c909ff8b741c0402d296f5b5514461d6b281873481b768a58c58dc5aedcf", "observed_at": "2026-10-17T16:42:11.391537+00:00", "revision_id": "1f7ec978-a5fd-4624-8592-6c34c36feb82", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p", "claim_id": "f4f7c01e-a2dd-4aa2-b039-e7e2f81e9446", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "f8cb35d4-df9e-4f7f-894a-e8069619d42c", "valid_until": null, "assertion_id": "c69492c8-81cd-449c-b602-2c6b2ca616bf", "temporal_expression": "", "extraction_confidence": 0.9}, "investment": {"value": "Reported project cost: US$675 million.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/rabigh-4-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "db78c909ff8b741c0402d296f5b5514461d6b281873481b768a58c58dc5aedcf", "observed_at": "2026-10-17T16:42:11.391537+00:00", "revision_id": "1f7ec978-a5fd-4624-8592-6c34c36feb82", "published_at": null}, "locator": "/html/head/main/div/section[4]/div/ul/li[4]", "claim_id": "2bd10fd5-3734-4c96-9846-627ceeb72abd", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "07b2658c-172d-446f-86c8-f0f49e21a202", "valid_until": null, "assertion_id": "8925d428-1e37-4310-80c8-bee363250fbb", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "94b6bdb4-71e3-424b-a87a-8c8c64f10acf", "publication": {"local_only": false, "reviewed_at": "2026-11-05T16:21:44.369945+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "research-imported-enriched-public-v1", "template_version": "dossier-v1"}, "interpretation": {"version": "ordinary-source-qualifications-v1", "unknowns": [], "attribution": "ACWA's H1 2026 report lists Rabigh 4 IWP, Saudi Arabia, in its March 2026 table of projects that achieved their respective ICOD or PCOD and thus began contributing to ACWA's results. The row reports 600,000 m\u00b3/day incremental capacity, 600,000 m\u00b3/day online capacity, and a dash for remaining capacity to bring online. ACWA defines online capacity as capacity in operation as at the stated ICOD/PCOD date. (reported). ACWA Power (externally supplied capture), evidence received 2026-11-05; https://www.acwapower.com/media/t5we4kaq/acwa-power_q2-report-2026_en_v19-1.pdf\n\nACWA places Rabigh 4 IWP under \u201cFULLY OPERATIONAL ASSETS CONTD.\u201d Its appendix row reports Saudi Arabia, SWRO technology, 600,000 m\u00b3/day operational capacity, and Q1 2026 in the \u201cPCOD (Actual / Expected)/Status\u201d column. (reported). ACWA Power (externally supplied capture), evidence received 2026-11-05; https://www.acwapower.com/media/t5we4kaq/acwa-power_q2-report-2026_en_v19-1.pdf", "relationships": [], "coverage_limitations": ["Canonical facts retain their original source scope. Later source qualifications do not redefine the original asset or establish open supplier procurement."]}, "public_summary": "Rabigh 4 IWP is a water desalination project in Saudi Arabia. ACWA Power\u2019s project-page title says \u201cRabigh 4 IPP,\u201d while its body heading and description identify it as \u201cRabigh 4 IWP.\u201d The page places the project next to the existing Rabigh 3 IWP Plant but gives no more specific site location. (ACWA Power project page, title, project description and location; observed 17 October 2026.)\n\nACWA describes the project scope as a 600,000 m\u00b3/day SWRO desalination plant, a PWSF tank facility with 1,200,000 m\u00b3 capacity, and 6.804 MWp of PV capacity. It reports a project cost of US$675 million and consortium ownership of ACWA Power (45%), Haji Ali Reza (HAACO, 35%) and Al Moayyed (20%). These are figures and roles reported by ACWA. (ACWA Power project page, project description and key facts; observed 17 October 2026.)\n\nThe project page records commissioning as scheduled by 31 March 2026 and lists commercial operations in Q1 2026; these are schedule entries, not confirmation that the milestones occurred. (ACWA Power project page, project description and key facts; observed 17 October 2026.) ACWA\u2019s investor report for the three- and six-month periods ended 30 June 2026 lists Rabigh 4 in its March 2026 table of projects that achieved an ICOD or PCOD and began contributing to ACWA\u2019s results. The row reports 600,000 m\u00b3/day incremental capacity, 600,000 m\u00b3/day online capacity and a dash under remaining capacity. ACWA defines online capacity as capacity in operation at the stated ICOD/PCOD date. (ACWA Power Investor Report, p. 8.)\n\nThe report appendix places Rabigh 4 under \u201cFULLY OPERATIONAL ASSETS CONTD.\u201d and lists SWRO, 600,000 m\u00b3/day operational capacity and Q1 2026 in a column headed \u201cPCOD (Actual / Expected)/Status.\u201d That entry does not give an exact full-COD date. A general page 8 footnote says some projects may not have reached full operational capacity and obtained an official certificate of full commercial operations from the off-taker; it does not identify Rabigh 4 specifically. These portfolio entries report capacity and milestones, not sustained measured output. (ACWA Power Investor Report, pp. 8, 24.)\n\nReading-scope note: The investor-report review covered extracted text on pages 6, 8 and 24 of the 34-page report. Other pages and graphical content were not interpreted, and OCR was not commissioned.", "schema_version": "1.0", "public_unknowns": ["Whether Rabigh 4 has an official certificate of full commercial operations from the off-taker, and its effective date, are not established by the report\u2019s general footnote. The exact full-COD date is also not established by the combined ICOD/PCOD table or the appendix\u2019s actual/expected/status column. (ACWA Power Investor Report, pp. 8, 24.)", "The reported online and operational capacities do not establish sustained measured output or current operating performance. (ACWA Power Investor Report, pp. 8, 24.)", "ACWA\u2019s project page gives no site location more specific than next to the existing Rabigh 3 IWP Plant. (ACWA Power project page, project description; observed 17 October 2026.)", "Current procurement status and an open supplier opportunity are not established by the reviewed project-page and investor-report material; no buying window is inferred. (ACWA Power project page, project description and key facts; Investor Report, pp. 8, 24.)"], "evidence_observed_at": "2026-11-05T16:16:54.256063+00:00", "knowledge_reviewed_at": "2026-11-05T16:21:44.369945+00:00", "decisive_evidence_observed_at": "2026-10-17T16:42:11.391537+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Rabigh 4 IWP", "original_project_title": "Rabigh 4 IWP. The document title says \u201cRabigh 4 IPP,\u201d while the body heading and description identify it as \u201cRabigh 4 IWP.\u201d", "canonical_url": "https://capexcue.com/projects/rabigh-4-iwp-the-document-title-says-rabigh-4-ipp-while-the-body-heading-and-description-identify-it-as-rabigh-4-iwp-10c075bb-b5d/", "release": {"id": "3c36e3d2-ca62-4402-9792-83e43259f82a", "number": 2, "published_at": "2026-11-05T16:21:44.369945+00:00"}, "release_reference": "release 2 (3c36e3d2-ca62-4402-9792-83e43259f82a)", "current_dossier_url": "https://capexcue.com/projects/rabigh-4-iwp-the-document-title-says-rabigh-4-ipp-while-the-body-heading-and-description-identify-it-as-rabigh-4-iwp-10c075bb-b5d/", "citation": "CapexCue \u2014 Rabigh 4 IWP \u2014 dossier released 2026-11-05T16:21:44.369945+00:00, release 2 (3c36e3d2-ca62-4402-9792-83e43259f82a) \u2014 https://capexcue.com/projects/rabigh-4-iwp-the-document-title-says-rabigh-4-ipp-while-the-body-heading-and-description-identify-it-as-rabigh-4-iwp-10c075bb-b5d/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "metadata_assessment", "value": "water_environment", "support": {"end": 19, "start": 0, "sources": [{"url": "https://acwapower.com/en/what-we-do/projects/rabigh-4-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "db78c909ff8b741c0402d296f5b5514461d6b281873481b768a58c58dc5aedcf", "observed_at": "2026-10-17T16:42:11.391537+00:00", "revision_id": "1f7ec978-a5fd-4624-8592-6c34c36feb82", "published_at": null}], "modality": "reported", "predicate": "sector", "raw_value": "Water desalination.", "statement": "Water desalination.", "qualifications": {"attribution": "acwapower.com"}}, "label": "Water and environment", "icon": "water"}, "project_metadata": {"version": "released-metadata-v2", "category": {"basis": "metadata_assessment", "value": "water_environment", "support": {"end": 19, "start": 0, "sources": [{"url": "https://acwapower.com/en/what-we-do/projects/rabigh-4-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "db78c909ff8b741c0402d296f5b5514461d6b281873481b768a58c58dc5aedcf", "observed_at": "2026-10-17T16:42:11.391537+00:00", "revision_id": "1f7ec978-a5fd-4624-8592-6c34c36feb82", "published_at": null}], "modality": "reported", "predicate": "sector", "raw_value": "Water desalination.", "statement": "Water desalination.", "qualifications": {"attribution": "acwapower.com"}}}, "input_hash": "3150cbc6b2c17f062e0be880b3e79a84bebdbe8b882afcf6a3f90ccb23c690bf", "release_id": "3c36e3d2-ca62-4402-9792-83e43259f82a", "type_codes": ["desalination"], "field_states": {"type": {"state": "accepted", "reason": "supported_physical_components"}, "region": {"state": "blocked", "reason": "country_qualified_location_requires_review"}, "country": {"state": "blocked", "reason": "qualified_location_requires_review"}, "category": {"state": "accepted", "reason": "supported_primary_category"}}, "region_codes": [], "release_hash": "673a299a80393ef9b71c0e0ba8d7dc9dc449723664c753758e9771912d455e3d", "assessment_id": "21f4ea76-f3a8-49c8-8fb1-c1e5021f9d9f", "country_codes": [], "assessment_hash": "c0e105d19859585fbb1f4505c87833902e811cc9d0e132ea0375898e841c04b9", "country_label": "", "region_label": "", "type_labels": ["Desalination"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}