{"name": "Koorangie Energy Storage System (KESS).", "slug": "koorangie-energy-storage-system-kess-12db6764-c1d", "as_of": "2026-10-17T13:12:34.016837+00:00", "depth": "basic", "facts": {"date": {"value": "Commercial operations commenced in July 2025.", "rights": "facts_only", "source": {"url": "https://edifyenergy.com/project/koorangie-energy-storage-system/", "name": "edifyenergy.com", "origin": "live", "checksum": "105ce9ee464e79c2f9e4f2c18ae8010308b95e791374fe655aa89948650b6847", "observed_at": "2026-10-17T12:42:09.762016+00:00", "revision_id": "e3d2e1b8-195a-4c04-8c81-54a8ab5a58af", "published_at": null}, "locator": "/html/body/div[1]/main/section[2]/div/div[1]/div/div[2]/div[1]/text-position:28", "claim_id": "38a7cbba-3260-4e60-a0aa-2981043b70d6", "modality": "actual", "confidence": 0.9, "valid_from": null, "attribution": "edifyenergy.com", "evidence_id": "4a67ac28-aa59-489f-bc92-4994e490cfc7", "valid_until": null, "assertion_id": "3de8f644-a279-40b4-b3e4-9478d467a9c2", "temporal_expression": "", "extraction_confidence": 0.9}, "name": {"value": "Koorangie Energy Storage System (KESS).", "rights": "facts_only", "source": {"url": "https://edifyenergy.com/project/koorangie-energy-storage-system/", "name": "edifyenergy.com", "origin": "live", "checksum": "105ce9ee464e79c2f9e4f2c18ae8010308b95e791374fe655aa89948650b6847", "observed_at": "2026-10-17T12:42:09.762016+00:00", "revision_id": "e3d2e1b8-195a-4c04-8c81-54a8ab5a58af", "published_at": null}, "locator": "/html/body/div[1]/main/section[1]/div[3]/h1", "claim_id": "f5611a0a-a554-40f6-9e6a-371c5c12858d", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "edifyenergy.com", "evidence_id": "83687aeb-3207-4959-ba7b-b1122863714c", "valid_until": null, "assertion_id": "eecfbf50-a5db-49f9-beb3-32e22077032a", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "Installed capacity is 185 MW / 370 MWh. The battery is connected to AusNet\u2019s 220 kV transmission network and provides system strength to the Murray River Renewable Energy Zone; the stated objective is to increase the zone\u2019s renewable hosting capacity by up to 300 MW.", "rights": "facts_only", "source": {"url": "https://edifyenergy.com/project/koorangie-energy-storage-system/", "name": "edifyenergy.com", "origin": "live", "checksum": "105ce9ee464e79c2f9e4f2c18ae8010308b95e791374fe655aa89948650b6847", "observed_at": "2026-10-17T12:42:09.762016+00:00", "revision_id": "e3d2e1b8-195a-4c04-8c81-54a8ab5a58af", "published_at": null}, "locator": "/html/body/div[1]/main/section[2]/div/div[1]/div/div[1]/div[1]/text-position:22", "claim_id": "5819a23b-982c-4e34-8221-866e16cb1917", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "edifyenergy.com", "evidence_id": "30dc9baa-bdcd-44b7-af7c-77a9d5162abc", "valid_until": null, "assertion_id": "0e358d03-36c1-4f48-8ace-8a474234f0fe", "temporal_expression": "", "extraction_confidence": 0.9}, "sector": {"value": "Lithium-ion battery energy storage.", "rights": "facts_only", "source": {"url": "https://edifyenergy.com/project/koorangie-energy-storage-system/", "name": "edifyenergy.com", "origin": "live", "checksum": "105ce9ee464e79c2f9e4f2c18ae8010308b95e791374fe655aa89948650b6847", "observed_at": "2026-10-17T12:42:09.762016+00:00", "revision_id": "e3d2e1b8-195a-4c04-8c81-54a8ab5a58af", "published_at": null}, "locator": "/html/body/div[1]/main/section[2]/div/div[2]/div/p[2]", "claim_id": "281a2ae7-c9a8-40eb-ab47-ecd1631eacbb", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "edifyenergy.com", "evidence_id": "77b0ca12-713b-42ad-b94f-39d503a066a1", "valid_until": null, "assertion_id": "bb26e5ed-1675-4e04-a577-883ee1947550", "temporal_expression": "", "extraction_confidence": 0.9}, "activity": {"value": "Edify reports it was awarded an AEMO System Support Agreement to provide 125 MW of services, with a contracted service term of 20 years.", "rights": "facts_only", "source": {"url": "https://edifyenergy.com/project/koorangie-energy-storage-system/", "name": "edifyenergy.com", "origin": "live", "checksum": "105ce9ee464e79c2f9e4f2c18ae8010308b95e791374fe655aa89948650b6847", "observed_at": "2026-10-17T12:42:09.762016+00:00", "revision_id": "e3d2e1b8-195a-4c04-8c81-54a8ab5a58af", "published_at": null}, "locator": "/html/body/div[1]/main/section[2]/div/div[2]/div/p[3]", "claim_id": "b9cd9d23-d2df-4932-b237-e1b12b57cf2b", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "edifyenergy.com", "evidence_id": "83373c63-9ff0-45d9-bb7b-a8ede7282015", "valid_until": null, "assertion_id": "28aaad18-b3ee-4f41-bb5f-ee7193b710e4", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "North West Victoria, near the town of Kerang.", "rights": "facts_only", "source": {"url": "https://edifyenergy.com/project/koorangie-energy-storage-system/", "name": "edifyenergy.com", "origin": "live", "checksum": "105ce9ee464e79c2f9e4f2c18ae8010308b95e791374fe655aa89948650b6847", "observed_at": "2026-10-17T12:42:09.762016+00:00", "revision_id": "e3d2e1b8-195a-4c04-8c81-54a8ab5a58af", "published_at": null}, "locator": "/html/body/div[1]/main/section[2]/div/div[2]/div/p[1]", "claim_id": "75aadc67-7c5a-4b9f-af31-c7ec4e60c0e7", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "edifyenergy.com", "evidence_id": "8bc07328-b78c-4320-a21e-21b6a02fb92a", "valid_until": null, "assertion_id": "c31b49c5-da3c-49be-83f2-ddde6793c106", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "957692d6-0566-48a9-8f30-0af1cae04d96", "publication": {"local_only": false, "reviewed_at": "2026-10-17T13:13:39.040657+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "Koorangie Energy Storage System (KESS) is a lithium-ion battery project near Kerang in North West Victoria. The reported installed capacity is 185 MW / 370 MWh, and the battery is connected to AusNet\u2019s 220 kV transmission network to provide system strength to the Murray River Renewable Energy Zone. The source reports commercial operations began in July 2025.", "schema_version": "1.0", "public_unknowns": ["The supplied project page reports commercial operations commenced in July 2025, but does not establish whether procurement remains open, whether any equipment or service packages remain unawarded, or whether there is a current supplier opportunity."], "evidence_observed_at": "2026-10-17T12:42:09.762016+00:00", "knowledge_reviewed_at": "2026-10-17T13:12:34.267238+00:00", "decisive_evidence_observed_at": "2026-10-17T12:42:09.762016+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Koorangie Energy Storage System (KESS).", "original_project_title": "Koorangie Energy Storage System (KESS).", "canonical_url": "https://capexcue.com/projects/koorangie-energy-storage-system-kess-12db6764-c1d/", "release": {"id": "d307cf11-f680-4667-94d4-8b41827a38d8", "number": 1, "published_at": "2026-10-17T13:14:08.544655+00:00"}, "release_reference": "release 1 (d307cf11-f680-4667-94d4-8b41827a38d8)", "current_dossier_url": "https://capexcue.com/projects/koorangie-energy-storage-system-kess-12db6764-c1d/", "citation": "CapexCue \u2014 Koorangie Energy Storage System (KESS). \u2014 dossier released 2026-10-17T13:14:08.544655+00:00, release 1 (d307cf11-f680-4667-94d4-8b41827a38d8) \u2014 https://capexcue.com/projects/koorangie-energy-storage-system-kess-12db6764-c1d/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 267, "start": 0, "sources": [{"url": "https://edifyenergy.com/project/koorangie-energy-storage-system/", "name": "edifyenergy.com", "origin": "live", "checksum": "105ce9ee464e79c2f9e4f2c18ae8010308b95e791374fe655aa89948650b6847", "observed_at": "2026-10-17T12:42:09.762016+00:00", "revision_id": "e3d2e1b8-195a-4c04-8c81-54a8ab5a58af", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "Installed capacity is 185 MW / 370 MWh. The battery is connected to AusNet\u2019s 220 kV transmission network and provides system strength to the Murray River Renewable Energy Zone; the stated objective is to increase the zone\u2019s renewable hosting capacity by up to 300 MW.", "statement": "Installed capacity is 185 MW / 370 MWh. The battery is connected to AusNet\u2019s 220 kV transmission network and provides system strength to the Murray River Renewable Energy Zone; the stated objective is to increase the zone\u2019s renewable hosting capacity by up to 300 MW.", "qualifications": {"attribution": "edifyenergy.com"}}, "label": "Energy", "icon": "energy"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 267, "start": 0, "sources": [{"url": "https://edifyenergy.com/project/koorangie-energy-storage-system/", "name": "edifyenergy.com", "origin": "live", "checksum": "105ce9ee464e79c2f9e4f2c18ae8010308b95e791374fe655aa89948650b6847", "observed_at": "2026-10-17T12:42:09.762016+00:00", "revision_id": "e3d2e1b8-195a-4c04-8c81-54a8ab5a58af", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "Installed capacity is 185 MW / 370 MWh. The battery is connected to AusNet\u2019s 220 kV transmission network and provides system strength to the Murray River Renewable Energy Zone; the stated objective is to increase the zone\u2019s renewable hosting capacity by up to 300 MW.", "statement": "Installed capacity is 185 MW / 370 MWh. The battery is connected to AusNet\u2019s 220 kV transmission network and provides system strength to the Murray River Renewable Energy Zone; the stated objective is to increase the zone\u2019s renewable hosting capacity by up to 300 MW.", "qualifications": {"attribution": "edifyenergy.com"}}}, "input_hash": "af469c63953d3772889c4100be722a575c991e53e92e46bf21611478e3237d3c", "release_id": "d307cf11-f680-4667-94d4-8b41827a38d8", "type_codes": ["battery_storage"], "field_states": {"type": {"state": "accepted", "reason": "Kerang, Victoria is in Australia; grid connection does not turn the battery into a separate transmission project."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "Kerang, Victoria is in Australia; grid connection does not turn the battery into a separate transmission project."}, "category": {"state": "accepted", "reason": "Kerang, Victoria is in Australia; grid connection does not turn the battery into a separate transmission project."}}, "region_codes": ["oceania"], "release_hash": "5c9f8272592fa31430e2b75adcc5f17e2a69719771f966e5ae07e281bdb8ad8e", "assessment_id": "5cf95bc8-d05c-4f8b-a34f-63d1baa41158", "country_codes": ["AU"], "assessment_hash": "28a02079854bbd30d0d17bb45b20d505196a97efcb131db770726eb030e9885f", "country_label": "Australia", "region_label": "Oceania", "type_labels": ["Battery Storage"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}