{"name": "Sizewell C", "slug": "sizewell-c-f5017fa7-3d7", "as_of": "2026-10-15T11:39:32.287842+00:00", "depth": "basic", "facts": {"date": {"value": "The Energy Secretary signed the final investment decision on 22 July 2025; the release was published on 22 July 2025.", "rights": "facts_only", "source": {"url": "https://www.gov.uk/government/news/sizewell-c-gets-green-light-with-final-investment-decision", "name": "www.gov.uk", "origin": "live", "checksum": "b42cd46f9623df851b02a0a496084e4c752a8490440c9c1a051203f73676cace", "observed_at": "2026-10-15T11:38:08.109587+00:00", "revision_id": "a42d34a0-ee68-4091-be96-7c3753ba1db7", "published_at": null}, "locator": "/html/body/div[2]/main/div[1]/div[2]/div/dl", "claim_id": "2af8cf21-0a18-41a8-a836-53080b35df93", "modality": "actual", "confidence": 0.9, "valid_from": null, "attribution": "www.gov.uk", "evidence_id": "fcf4ad41-9304-4cb3-866e-0a2d106c1f9f", "valid_until": null, "assertion_id": "e4600134-17c0-4791-b1c0-0df1e74d13cc", "temporal_expression": "", "extraction_confidence": 0.9}, "name": {"value": "Sizewell C", "rights": "facts_only", "source": {"url": "https://www.gov.uk/government/news/sizewell-c-gets-green-light-with-final-investment-decision", "name": "www.gov.uk", "origin": "live", "checksum": "b42cd46f9623df851b02a0a496084e4c752a8490440c9c1a051203f73676cace", "observed_at": "2026-10-15T11:38:08.109587+00:00", "revision_id": "a42d34a0-ee68-4091-be96-7c3753ba1db7", "published_at": null}, "locator": "/html/body/div[2]/main/div[1]/div[1]/div/h1", "claim_id": "61ef1358-454d-4350-a0f4-09a71ec263bb", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.gov.uk", "evidence_id": "db397e80-0d10-43a2-afbd-c05f0884019a", "valid_until": null, "assertion_id": "ce491abf-2d1e-43fa-b297-916a7bb89fdd", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "Construction of a new nuclear power plant intended to deliver clean power.", "rights": "facts_only", "source": {"url": "https://www.gov.uk/government/news/sizewell-c-gets-green-light-with-final-investment-decision", "name": "www.gov.uk", "origin": "live", "checksum": "b42cd46f9623df851b02a0a496084e4c752a8490440c9c1a051203f73676cace", "observed_at": "2026-10-15T11:38:08.109587+00:00", "revision_id": "a42d34a0-ee68-4091-be96-7c3753ba1db7", "published_at": null}, "locator": "/html/body/div[2]/main/div[1]/div[2]/p", "claim_id": "79b42f31-061c-4b6b-84e6-a0a6e250d904", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "www.gov.uk", "evidence_id": "5088cd47-97bc-47b1-bbaf-c80a7eafe963", "valid_until": null, "assertion_id": "e653cfa0-9fd4-4917-b1e5-6913752d4486", "temporal_expression": "", "extraction_confidence": 0.9}, "sector": {"value": "Nuclear power generation.", "rights": "facts_only", "source": {"url": "https://www.gov.uk/government/news/sizewell-c-gets-green-light-with-final-investment-decision", "name": "www.gov.uk", "origin": "live", "checksum": "b42cd46f9623df851b02a0a496084e4c752a8490440c9c1a051203f73676cace", "observed_at": "2026-10-15T11:38:08.109587+00:00", "revision_id": "a42d34a0-ee68-4091-be96-7c3753ba1db7", "published_at": null}, "locator": "/html/body/div[2]/main/div[2]/div[1]/div[1]/div/p[2]", "claim_id": "8be7c8d9-b77f-488c-ad95-7e02f7aa7b28", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.gov.uk", "evidence_id": "14084d33-2a6d-4bf9-8004-3084a292f601", "valid_until": null, "assertion_id": "f95e5d29-5a20-4a7d-b5a6-4df0c4f43281", "temporal_expression": "", "extraction_confidence": 0.9}, "delivery": {"value": "The article places Sizewell C coming online in the 2030s; it gives no more precise date.", "rights": "facts_only", "source": {"url": "https://www.gov.uk/government/news/sizewell-c-gets-green-light-with-final-investment-decision", "name": "www.gov.uk", "origin": "live", "checksum": "b42cd46f9623df851b02a0a496084e4c752a8490440c9c1a051203f73676cace", "observed_at": "2026-10-15T11:38:08.109587+00:00", "revision_id": "a42d34a0-ee68-4091-be96-7c3753ba1db7", "published_at": null}, "locator": "/html/body/div[2]/main/div[2]/div[1]/div[1]/div/p[16]", "claim_id": "fa320fbd-0286-4891-aec6-063ce82f99b3", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "www.gov.uk", "evidence_id": "70027f83-5d00-4870-8d32-da1e15371d33", "valid_until": null, "assertion_id": "1428e32a-2ee9-4c44-94a1-466458322d46", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "United Kingdom; the source does not give a more precise site location.", "rights": "facts_only", "source": {"url": "https://www.gov.uk/government/news/sizewell-c-gets-green-light-with-final-investment-decision", "name": "www.gov.uk", "origin": "live", "checksum": "b42cd46f9623df851b02a0a496084e4c752a8490440c9c1a051203f73676cace", "observed_at": "2026-10-15T11:38:08.109587+00:00", "revision_id": "a42d34a0-ee68-4091-be96-7c3753ba1db7", "published_at": null}, "locator": "/html/body/div[2]/main/div[2]/div[1]/div[1]/div/p[3]", "claim_id": "c9408194-dc9c-4515-8352-06e186459f90", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.gov.uk", "evidence_id": "7066cd6d-ddb1-4cff-a605-03351a100118", "valid_until": null, "assertion_id": "68db29e2-2a62-411d-a677-631cd4a150a9", "temporal_expression": "", "extraction_confidence": 0.9}, "investment": {"value": "Announced equity structure: UK government initial 44.9% stake; La Caisse 20%; Centrica 15%; Amber Infrastructure initial 7.6%; EDF 12.5%.", "rights": "facts_only", "source": {"url": "https://www.gov.uk/government/news/sizewell-c-gets-green-light-with-final-investment-decision", "name": "www.gov.uk", "origin": "live", "checksum": "b42cd46f9623df851b02a0a496084e4c752a8490440c9c1a051203f73676cace", "observed_at": "2026-10-15T11:38:08.109587+00:00", "revision_id": "a42d34a0-ee68-4091-be96-7c3753ba1db7", "published_at": null}, "locator": "/html/body/div[2]/main/div[2]/div[1]/div[1]/div/p[7]", "claim_id": "e1a0f035-91bc-4f0f-afc7-56f1888c1102", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.gov.uk", "evidence_id": "33919985-e54f-4895-93d1-2bbf5e92ae53", "valid_until": null, "assertion_id": "95a566b9-0b1b-48bc-b9e6-0b2a5c32f923", "temporal_expression": "", "extraction_confidence": 0.9}, "procurement": {"value": "Sizewell C had already signed \u00a3330 million in contracts with local companies; the source gives no details of currently available packages.", "rights": "facts_only", "source": {"url": "https://www.gov.uk/government/news/sizewell-c-gets-green-light-with-final-investment-decision", "name": "www.gov.uk", "origin": "live", "checksum": "b42cd46f9623df851b02a0a496084e4c752a8490440c9c1a051203f73676cace", "observed_at": "2026-10-15T11:38:08.109587+00:00", "revision_id": "a42d34a0-ee68-4091-be96-7c3753ba1db7", "published_at": null}, "locator": "/html/body/div[2]/main/div[2]/div[1]/div[1]/div/p[26]", "claim_id": "328e235f-d8e2-4e35-9465-86c61fed670a", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.gov.uk", "evidence_id": "bb8406a3-742f-4e6b-a4e0-778dd95c2b16", "valid_until": null, "assertion_id": "86058269-e3b7-44a7-9c3e-20c8d6ce8be5", "temporal_expression": "", "extraction_confidence": 0.9}, "financing_stage": {"value": "Final investment decision signed by the Energy Secretary.", "rights": "facts_only", "source": {"url": "https://www.gov.uk/government/news/sizewell-c-gets-green-light-with-final-investment-decision", "name": "www.gov.uk", "origin": "live", "checksum": "b42cd46f9623df851b02a0a496084e4c752a8490440c9c1a051203f73676cace", "observed_at": "2026-10-15T11:38:08.109587+00:00", "revision_id": "a42d34a0-ee68-4091-be96-7c3753ba1db7", "published_at": null}, "locator": "/html/body/div[2]/main/div[1]/div[2]/p", "claim_id": "374ca61f-c002-4b50-b4b1-5d991bdc548f", "modality": "actual", "confidence": 0.9, "valid_from": null, "attribution": "www.gov.uk", "evidence_id": "5088cd47-97bc-47b1-bbaf-c80a7eafe963", "valid_until": null, "assertion_id": "175d4bcc-ae63-4fc4-bc7e-d0a00f07db89", "temporal_expression": "", "extraction_confidence": 0.9}, "financing_amount": {"value": "Target construction cost around \u00a338 billion in 2024 prices; total equity and debt finance made available exceeds that target. This is a construction-cost figure, not a stated amount of a single loan or contract.", "rights": "facts_only", "source": {"url": "https://www.gov.uk/government/news/sizewell-c-gets-green-light-with-final-investment-decision", "name": "www.gov.uk", "origin": "live", "checksum": "b42cd46f9623df851b02a0a496084e4c752a8490440c9c1a051203f73676cace", "observed_at": "2026-10-15T11:38:08.109587+00:00", "revision_id": "a42d34a0-ee68-4091-be96-7c3753ba1db7", "published_at": null}, "locator": "/html/body/div[2]/main/div[2]/div[1]/div[1]/div/p[29]", "claim_id": "898ffb3c-77fa-42ba-83aa-399479923b1d", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.gov.uk", "evidence_id": "121b73d4-d69c-4840-b42c-c23508280179", "valid_until": null, "assertion_id": "0e48cd23-e402-4576-94b3-c9b4cc98a39c", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "9b4d6979-3f76-48c0-a136-71b637b05da0", "publication": {"local_only": false, "reviewed_at": "2026-10-16T11:41:28.782048+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "Sizewell C is a planned nuclear power plant construction project in the United Kingdom. The Energy Secretary signed its final investment decision on 22 July 2025. The release reported a target construction cost of around \u00a338 billion in 2024 prices, with total equity and debt finance made available exceeding that target. By the release date, \u00a3330 million in contracts with local companies had been signed; the release does not identify currently available packages.", "schema_version": "1.0", "public_unknowns": ["The release does not provide a more precise site location than the United Kingdom.", "The release reports contracts already signed but gives no details of currently available supplier packages or a procurement window.", "The release places the project coming online in the 2030s without giving a more precise date."], "evidence_observed_at": "2026-10-15T11:38:08.109587+00:00", "knowledge_reviewed_at": "2026-10-15T11:39:32.654683+00:00", "decisive_evidence_observed_at": "2026-10-15T11:38:08.109587+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Sizewell C", "original_project_title": "Sizewell C", "canonical_url": "https://capexcue.com/projects/sizewell-c-f5017fa7-3d7/", "release": {"id": "b9045dd5-6d57-49eb-a35a-b11a0b1efe3d", "number": 1, "published_at": "2026-10-16T11:41:30.221840+00:00"}, "release_reference": "release 1 (b9045dd5-6d57-49eb-a35a-b11a0b1efe3d)", "current_dossier_url": "https://capexcue.com/projects/sizewell-c-f5017fa7-3d7/", "citation": "CapexCue \u2014 Sizewell C \u2014 dossier released 2026-10-16T11:41:30.221840+00:00, release 1 (b9045dd5-6d57-49eb-a35a-b11a0b1efe3d) \u2014 https://capexcue.com/projects/sizewell-c-f5017fa7-3d7/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "independently_reviewed_metadata", "value": "energy", "support": {"end": 74, "start": 0, "sources": [{"url": "https://www.gov.uk/government/news/sizewell-c-gets-green-light-with-final-investment-decision", "name": "www.gov.uk", "origin": "live", "checksum": "b42cd46f9623df851b02a0a496084e4c752a8490440c9c1a051203f73676cace", "observed_at": "2026-10-15T11:38:08.109587+00:00", "revision_id": "a42d34a0-ee68-4091-be96-7c3753ba1db7", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "Construction of a new nuclear power plant intended to deliver clean power.", "statement": "Construction of a new nuclear power plant intended to deliver clean power.", "qualifications": {"attribution": "www.gov.uk"}}, "label": "Energy", "icon": "energy"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "independently_reviewed_metadata", "value": "energy", "support": {"end": 74, "start": 0, "sources": [{"url": "https://www.gov.uk/government/news/sizewell-c-gets-green-light-with-final-investment-decision", "name": "www.gov.uk", "origin": "live", "checksum": "b42cd46f9623df851b02a0a496084e4c752a8490440c9c1a051203f73676cace", "observed_at": "2026-10-15T11:38:08.109587+00:00", "revision_id": "a42d34a0-ee68-4091-be96-7c3753ba1db7", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "Construction of a new nuclear power plant intended to deliver clean power.", "statement": "Construction of a new nuclear power plant intended to deliver clean power.", "qualifications": {"attribution": "www.gov.uk"}}}, "input_hash": "99233743bc63b94461a1c84438ac6ca3bbb305158f767afb19ba24fe5542341b", "release_id": "b9045dd5-6d57-49eb-a35a-b11a0b1efe3d", "type_codes": ["nuclear_power"], "field_states": {"type": {"state": "accepted", "reason": "The scope identifies a new nuclear power plant and the sector specifies nuclear power generation; the supported type is nuclear_power."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "The supplied location fact places the physical asset in the United Kingdom, while noting that no more precise site location is given."}, "category": {"state": "accepted", "reason": "The scope describes a new nuclear power plant, and the sector identifies nuclear power generation. These support energy as the primary category."}}, "region_codes": ["europe"], "release_hash": "2ffe65f06fae8ee1a7d877376719b6ba53063676be828f27e043f30eb2cc5622", "assessment_id": "35262508-b3fc-4a55-994f-c2449b724c04", "country_codes": ["GB"], "assessment_hash": "cc9d19bba2be348bf3ed00fe2af5f5c3e9391153d9764e94e95c8b1dc30e4cb8", "country_label": "United Kingdom", "region_label": "Europe", "type_labels": ["Nuclear Power"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}