{"name": "Itatiaia transmission project (Projeto Itatiaia).", "slug": "itatiaia-transmission-project-projeto-itatiaia-1c356219-7de", "as_of": "2026-10-18T19:49:44.981150+00:00", "depth": "basic", "facts": {"date": {"value": "The article page displays 17/07/26; its dateline states S\u00e3o Paulo, 15 July 2026.", "rights": "facts_only", "source": {"url": "https://www.isaenergiabrasil.com.br/centro-de-midia/noticias/isa-energia-brasil-obtem-licenca-previa-para-o-projeto-itatiaia-importante-elo-de-escoamento-energetico-entre-mg-e-rj/", "name": "www.isaenergiabrasil.com.br", "origin": "live", "checksum": "ddb6ef29fed0495729002d6aa8398d50e2540aef03e1227c70285d62ddca8a42", "observed_at": "2026-10-18T19:46:32.299228+00:00", "revision_id": "1f746924-09df-4d77-94bd-eedcfcbed6e2", "published_at": null}, "locator": "/html/body/main/div[2]/div[1]/div/span/text-position:17", "claim_id": "45c1b8c2-40f5-45b6-9ab7-0d2387212cd6", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.isaenergiabrasil.com.br", "evidence_id": "52feae51-f9e5-46c6-b16b-e1fa3e9327c2", "valid_until": null, "assertion_id": "2a96eb3e-5e27-451d-b1bf-a9f375d519f7", "temporal_expression": "", "extraction_confidence": 0.9}, "name": {"value": "Itatiaia transmission project (Projeto Itatiaia).", "rights": "facts_only", "source": {"url": "https://www.isaenergiabrasil.com.br/centro-de-midia/noticias/isa-energia-brasil-obtem-licenca-previa-para-o-projeto-itatiaia-importante-elo-de-escoamento-energetico-entre-mg-e-rj/", "name": "www.isaenergiabrasil.com.br", "origin": "live", "checksum": "ddb6ef29fed0495729002d6aa8398d50e2540aef03e1227c70285d62ddca8a42", "observed_at": "2026-10-18T19:46:32.299228+00:00", "revision_id": "1f746924-09df-4d77-94bd-eedcfcbed6e2", "published_at": null}, "locator": "/html/body/main/div[2]/div[2]/div/div/h2", "claim_id": "d349f3f4-4a81-4565-90a8-18022ca205c8", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.isaenergiabrasil.com.br", "evidence_id": "5487e70e-cc71-4a76-b5a1-8e3d541aeaf1", "valid_until": null, "assertion_id": "2ff0da3f-9e9e-4e31-906b-04238e7bc428", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "Planned construction of more than 995 transmission towers and 35 inductive reactors rated 500 kV; construction of Substation Leopoldina 2 and expansion of Substations Governador Valadares 6 and Terminal Rio; and two 500-kV double-circuit transmission lines: Governador Valadares 6\u2013Leopoldina 2 and Leopoldina 2\u2013Terminal Rio. The article describes the lines as 507 km in double circuit, totaling 1,014 circuit-km, and also reports more than 1,000 km of circuits.", "rights": "facts_only", "source": {"url": "https://www.isaenergiabrasil.com.br/centro-de-midia/noticias/isa-energia-brasil-obtem-licenca-previa-para-o-projeto-itatiaia-importante-elo-de-escoamento-energetico-entre-mg-e-rj/", "name": "www.isaenergiabrasil.com.br", "origin": "live", "checksum": "ddb6ef29fed0495729002d6aa8398d50e2540aef03e1227c70285d62ddca8a42", "observed_at": "2026-10-18T19:46:32.299228+00:00", "revision_id": "1f746924-09df-4d77-94bd-eedcfcbed6e2", "published_at": null}, "locator": "/html/body/main/div[2]/div[3]/div/figure/figcaption/text-position:42", "claim_id": "7e747f3b-ccba-45b5-a1da-75cb5b48fb3d", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "www.isaenergiabrasil.com.br", "evidence_id": "e89d804d-da8f-4a83-9e23-62adf6e06261", "valid_until": null, "assertion_id": "91cb179f-58fd-4999-b3f5-b0e3fe2089ae", "temporal_expression": "", "extraction_confidence": 0.9}, "sector": {"value": "Electricity transmission.", "rights": "facts_only", "source": {"url": "https://www.isaenergiabrasil.com.br/centro-de-midia/noticias/isa-energia-brasil-obtem-licenca-previa-para-o-projeto-itatiaia-importante-elo-de-escoamento-energetico-entre-mg-e-rj/", "name": "www.isaenergiabrasil.com.br", "origin": "live", "checksum": "ddb6ef29fed0495729002d6aa8398d50e2540aef03e1227c70285d62ddca8a42", "observed_at": "2026-10-18T19:46:32.299228+00:00", "revision_id": "1f746924-09df-4d77-94bd-eedcfcbed6e2", "published_at": null}, "locator": "/html/body/main/div[2]/div[2]/div/div/p[5]", "claim_id": "959d3771-76ae-4841-a3c8-fc82d53722bb", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.isaenergiabrasil.com.br", "evidence_id": "92553cc5-1ffa-4987-8a7c-8cf2956dc8fb", "valid_until": null, "assertion_id": "26a56f10-c5f9-4a71-8f0c-9a5ec2f73ff5", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Transmission corridor between Minas Gerais and Rio de Janeiro; the project includes substations in Minas Gerais (Leopoldina 2 and Governador Valadares 6) and Rio de Janeiro (Terminal Rio).", "rights": "facts_only", "source": {"url": "https://www.isaenergiabrasil.com.br/centro-de-midia/noticias/isa-energia-brasil-obtem-licenca-previa-para-o-projeto-itatiaia-importante-elo-de-escoamento-energetico-entre-mg-e-rj/", "name": "www.isaenergiabrasil.com.br", "origin": "live", "checksum": "ddb6ef29fed0495729002d6aa8398d50e2540aef03e1227c70285d62ddca8a42", "observed_at": "2026-10-18T19:46:32.299228+00:00", "revision_id": "1f746924-09df-4d77-94bd-eedcfcbed6e2", "published_at": null}, "locator": "/html/body/main/div[2]/div[2]/div/div/p[5]", "claim_id": "e49046b7-9bf2-4d7a-8ba2-f8a7f9c37bce", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.isaenergiabrasil.com.br", "evidence_id": "92553cc5-1ffa-4987-8a7c-8cf2956dc8fb", "valid_until": null, "assertion_id": "841112d2-afd0-4399-8b86-2e3437eeb683", "temporal_expression": "", "extraction_confidence": 0.9}, "investment": {"value": "Reported investment of R$ 2.7 billion, identified as ANEEL Capex updated for inflation to March 2026; this is a stated project investment figure, not evidence of expenditure already made.", "rights": "facts_only", "source": {"url": "https://www.isaenergiabrasil.com.br/centro-de-midia/noticias/isa-energia-brasil-obtem-licenca-previa-para-o-projeto-itatiaia-importante-elo-de-escoamento-energetico-entre-mg-e-rj/", "name": "www.isaenergiabrasil.com.br", "origin": "live", "checksum": "ddb6ef29fed0495729002d6aa8398d50e2540aef03e1227c70285d62ddca8a42", "observed_at": "2026-10-18T19:46:32.299228+00:00", "revision_id": "1f746924-09df-4d77-94bd-eedcfcbed6e2", "published_at": null}, "locator": "/html/body/main/div[2]/div[2]/div/div/p[6]", "claim_id": "f7654d13-c79f-490c-b3cf-a75afe32bbcd", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.isaenergiabrasil.com.br", "evidence_id": "0d7645f3-5532-4250-b4bc-213499f87a47", "valid_until": null, "assertion_id": "e8f15537-b580-4a72-bb87-3ef20c71cf00", "temporal_expression": "", "extraction_confidence": 0.9}, "regulatory": {"value": "ISA ENERGIA BRASIL reports that the project obtained a Licen\u00e7a Pr\u00e9via (preliminary license); the article dateline is 15 July 2026.", "rights": "facts_only", "source": {"url": "https://www.isaenergiabrasil.com.br/centro-de-midia/noticias/isa-energia-brasil-obtem-licenca-previa-para-o-projeto-itatiaia-importante-elo-de-escoamento-energetico-entre-mg-e-rj/", "name": "www.isaenergiabrasil.com.br", "origin": "live", "checksum": "ddb6ef29fed0495729002d6aa8398d50e2540aef03e1227c70285d62ddca8a42", "observed_at": "2026-10-18T19:46:32.299228+00:00", "revision_id": "1f746924-09df-4d77-94bd-eedcfcbed6e2", "published_at": null}, "locator": "/html/body/main/div[2]/div[2]/div/div/h2", "claim_id": "595da14b-da8b-4a0f-aa07-8905600413b3", "modality": "actual", "confidence": 0.9, "valid_from": null, "attribution": "www.isaenergiabrasil.com.br", "evidence_id": "5487e70e-cc71-4a76-b5a1-8e3d541aeaf1", "valid_until": null, "assertion_id": "42bbd682-21ae-4319-83b3-51b738cac4b3", "temporal_expression": "", "extraction_confidence": 0.9}, "procurement": {"value": "The project was awarded as Lot 7 of ANEEL Transmission Auction No. 01/2023; this refers to the project concession award, not component purchasing availability.", "rights": "facts_only", "source": {"url": "https://www.isaenergiabrasil.com.br/centro-de-midia/noticias/isa-energia-brasil-obtem-licenca-previa-para-o-projeto-itatiaia-importante-elo-de-escoamento-energetico-entre-mg-e-rj/", "name": "www.isaenergiabrasil.com.br", "origin": "live", "checksum": "ddb6ef29fed0495729002d6aa8398d50e2540aef03e1227c70285d62ddca8a42", "observed_at": "2026-10-18T19:46:32.299228+00:00", "revision_id": "1f746924-09df-4d77-94bd-eedcfcbed6e2", "published_at": null}, "locator": "/html/body/main/div[2]/div[2]/div/div/p[8]", "claim_id": "b3f6ea0e-4861-45dc-93cb-63508697afa3", "modality": "actual", "confidence": 0.9, "valid_from": null, "attribution": "www.isaenergiabrasil.com.br", "evidence_id": "1d64ee2d-3d8e-4f78-bb57-1d8390f2fa1e", "valid_until": null, "assertion_id": "ceaa1afc-ab25-4aec-8e9f-caaf39e14ada", "temporal_expression": "", "extraction_confidence": 0.9}, "next_milestone": {"value": "ANEEL-established energization deadline: March 2029.", "rights": "facts_only", "source": {"url": "https://www.isaenergiabrasil.com.br/centro-de-midia/noticias/isa-energia-brasil-obtem-licenca-previa-para-o-projeto-itatiaia-importante-elo-de-escoamento-energetico-entre-mg-e-rj/", "name": "www.isaenergiabrasil.com.br", "origin": "live", "checksum": "ddb6ef29fed0495729002d6aa8398d50e2540aef03e1227c70285d62ddca8a42", "observed_at": "2026-10-18T19:46:32.299228+00:00", "revision_id": "1f746924-09df-4d77-94bd-eedcfcbed6e2", "published_at": null}, "locator": "/html/body/main/div[2]/div[2]/div/div/p[8]", "claim_id": "1b742961-3d77-409f-830f-54e99564332f", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "www.isaenergiabrasil.com.br", "evidence_id": "1d64ee2d-3d8e-4f78-bb57-1d8390f2fa1e", "valid_until": null, "assertion_id": "44c7fca3-13bb-4fe1-b379-30128abeb9a8", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "9b773848-d2b2-469f-b8fd-ec320d2d6ded", "publication": {"local_only": false, "reviewed_at": "2026-10-18T19:51:23.929877+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "ISA ENERGIA BRASIL reports that Itatiaia obtained a preliminary license, with the article dateline of 15 July 2026. The planned transmission corridor between Minas Gerais and Rio de Janeiro includes two 500-kV double-circuit lines, a new substation, two substation expansions, more than 995 towers and 35 inductive reactors. The stated investment is R$ 2.7 billion in ANEEL Capex updated to March 2026; this is not evidence of expenditure already made. ANEEL's stated energization deadline is March 2029.", "schema_version": "1.0", "public_unknowns": ["The supplied article, whose dateline is 15 July 2026, does not document a component-specific purchasing package, EPC award, or supplier buying window. Its reference to the 2023 auction is the project concession award, not component purchasing availability."], "evidence_observed_at": "2026-10-18T19:46:32.299228+00:00", "knowledge_reviewed_at": "2026-10-18T19:49:45.358230+00:00", "decisive_evidence_observed_at": "2026-10-18T19:46:32.299228+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Itatiaia transmission project (Projeto Itatiaia).", "original_project_title": "Itatiaia transmission project (Projeto Itatiaia).", "canonical_url": "https://capexcue.com/projects/itatiaia-transmission-project-projeto-itatiaia-1c356219-7de/", "release": {"id": "59742100-8e86-4326-b46e-504666b7cbd3", "number": 1, "published_at": "2026-10-18T19:51:54.424927+00:00"}, "release_reference": "release 1 (59742100-8e86-4326-b46e-504666b7cbd3)", "current_dossier_url": "https://capexcue.com/projects/itatiaia-transmission-project-projeto-itatiaia-1c356219-7de/", "citation": "CapexCue \u2014 Itatiaia transmission project (Projeto Itatiaia). \u2014 dossier released 2026-10-18T19:51:54.424927+00:00, release 1 (59742100-8e86-4326-b46e-504666b7cbd3) \u2014 https://capexcue.com/projects/itatiaia-transmission-project-projeto-itatiaia-1c356219-7de/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 25, "start": 0, "sources": [{"url": "https://www.isaenergiabrasil.com.br/centro-de-midia/noticias/isa-energia-brasil-obtem-licenca-previa-para-o-projeto-itatiaia-importante-elo-de-escoamento-energetico-entre-mg-e-rj/", "name": "www.isaenergiabrasil.com.br", "origin": "live", "checksum": "ddb6ef29fed0495729002d6aa8398d50e2540aef03e1227c70285d62ddca8a42", "observed_at": "2026-10-18T19:46:32.299228+00:00", "revision_id": "1f746924-09df-4d77-94bd-eedcfcbed6e2", "published_at": null}], "modality": "reported", "predicate": "sector", "raw_value": "Electricity transmission.", "statement": "Electricity transmission.", "qualifications": {"attribution": "www.isaenergiabrasil.com.br"}}, "label": "Energy", "icon": "energy"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 25, "start": 0, "sources": [{"url": "https://www.isaenergiabrasil.com.br/centro-de-midia/noticias/isa-energia-brasil-obtem-licenca-previa-para-o-projeto-itatiaia-importante-elo-de-escoamento-energetico-entre-mg-e-rj/", "name": "www.isaenergiabrasil.com.br", "origin": "live", "checksum": "ddb6ef29fed0495729002d6aa8398d50e2540aef03e1227c70285d62ddca8a42", "observed_at": "2026-10-18T19:46:32.299228+00:00", "revision_id": "1f746924-09df-4d77-94bd-eedcfcbed6e2", "published_at": null}], "modality": "reported", "predicate": "sector", "raw_value": "Electricity transmission.", "statement": "Electricity transmission.", "qualifications": {"attribution": "www.isaenergiabrasil.com.br"}}}, "input_hash": "eb0de06c5560c524c6dd584885fd3e9be9a1d8ed55c2353823d6c8c790a03ac5", "release_id": "59742100-8e86-4326-b46e-504666b7cbd3", "type_codes": ["electricity_transmission"], "field_states": {"type": {"state": "accepted", "reason": "supported_physical_components"}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "Minas Gerais and Rio de Janeiro are in Brazil; inter-state transmission is not cross-country."}, "category": {"state": "accepted", "reason": "supported_primary_category"}}, "region_codes": ["latin_america_caribbean"], "release_hash": "eec011627340475ab1c472217790b071af1d42022ef1a39abd5ec1c9c124344c", "assessment_id": "72e01d09-3465-41bf-b167-a7161273c58b", "country_codes": ["BR"], "assessment_hash": "e27040ea5a3cf34ec220812a0191599a00769f4246be8fc71e441c218ee2de94", "country_label": "Brazil", "region_label": "Latin America Caribbean", "type_labels": ["Electricity Transmission"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}