{"name": "Neoen Big Battery (Blyth) Deployment Project, also identified as the Blyth Battery Energy Storage System (BBESS).", "slug": "neoen-big-battery-blyth-deployment-project-also-identified-as-the-blyth-battery-energy-storage-system-bbess-f5867962-041", "as_of": "2026-10-15T14:46:16.662929+00:00", "depth": "basic", "facts": {"name": {"value": "Neoen Big Battery (Blyth) Deployment Project, also identified as the Blyth Battery Energy Storage System (BBESS).", "rights": "facts_only", "source": {"url": "https://arena.gov.au/knowledge-bank/neoen-blyth-big-battery-deployment-project-development-report-milestone-2/", "name": "arena.gov.au", "origin": "live", "checksum": "798e863df7a792c5ec34839a1b3a5088e0ac307f31f55dcb144ecd191588505f", "observed_at": "2026-10-15T14:35:59.882989+00:00", "revision_id": "971ff342-01ea-47f2-8532-401d34cf6178", "published_at": null}, "locator": "/html/body/div/main/div[1]/div[2]/div/div/h1", "claim_id": "2cb7c9ae-9b77-44af-8045-52747b667310", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "arena.gov.au", "evidence_id": "c40f2a74-dfe7-49e2-8077-76ca929fac53", "valid_until": null, "assertion_id": "459ea05a-63c9-4d16-ab15-47f78ae21887", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "Planned construction of a 200 MW / 400 MWh battery energy storage system using CATL battery packs, intended to operate in grid-forming mode with Power Electronics (PE) inverters.", "rights": "facts_only", "source": {"url": "https://arena.gov.au/knowledge-bank/neoen-blyth-big-battery-deployment-project-development-report-milestone-2/", "name": "arena.gov.au", "origin": "live", "checksum": "798e863df7a792c5ec34839a1b3a5088e0ac307f31f55dcb144ecd191588505f", "observed_at": "2026-10-15T14:35:59.882989+00:00", "revision_id": "971ff342-01ea-47f2-8532-401d34cf6178", "published_at": null}, "locator": "/html/body/div/main/div[3]/div/div[1]/div[4]/div/div/div/p[1]", "claim_id": "a60953e3-8deb-4495-9775-dd349ffb6fcc", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "arena.gov.au", "evidence_id": "7fdd4118-9924-43a7-bb97-6518ce3b9f8e", "valid_until": null, "assertion_id": "a50e76a7-df04-402e-9caa-53dbfdbfb37a", "temporal_expression": "", "extraction_confidence": 0.9}, "sector": {"value": "Battery storage.", "rights": "facts_only", "source": {"url": "https://arena.gov.au/knowledge-bank/neoen-blyth-big-battery-deployment-project-development-report-milestone-2/", "name": "arena.gov.au", "origin": "live", "checksum": "798e863df7a792c5ec34839a1b3a5088e0ac307f31f55dcb144ecd191588505f", "observed_at": "2026-10-15T14:35:59.882989+00:00", "revision_id": "971ff342-01ea-47f2-8532-401d34cf6178", "published_at": null}, "locator": "/html/body/div/main/div[3]/div/div[1]/div[1]/ul/li[1]", "claim_id": "d84e09e3-1283-4d76-8215-6f6326e44945", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "arena.gov.au", "evidence_id": "b59b2cf1-7544-45f3-93fd-bfd927de5b42", "valid_until": null, "assertion_id": "1d81853a-66f4-4bf4-be51-620cf8b895cb", "temporal_expression": "", "extraction_confidence": 0.9}, "activity": {"value": "The report extract identifies as development challenges/lessons compatibility issues between inverters and controllers from different OEMs, and discrepancies between power-plant communication and controller cycle times.", "rights": "facts_only", "source": {"url": "https://arena.gov.au/knowledge-bank/neoen-blyth-big-battery-deployment-project-development-report-milestone-2/", "name": "arena.gov.au", "origin": "live", "checksum": "798e863df7a792c5ec34839a1b3a5088e0ac307f31f55dcb144ecd191588505f", "observed_at": "2026-10-15T14:35:59.882989+00:00", "revision_id": "971ff342-01ea-47f2-8532-401d34cf6178", "published_at": null}, "locator": "/html/body/div/main/div[3]/div/div[1]/div[4]/div/div/div/p[2]", "claim_id": "576b4122-1879-403f-91b9-0806c97b5b3a", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "arena.gov.au", "evidence_id": "af62df23-803f-45bc-916c-b40dfdc65865", "valid_until": null, "assertion_id": "1956b748-d4d5-4001-8a77-c4d302bc5646", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "South Australia; planned connection to ElectraNet\u2019s 275 kV Blyth West Substation.", "rights": "facts_only", "source": {"url": "https://arena.gov.au/knowledge-bank/neoen-blyth-big-battery-deployment-project-development-report-milestone-2/", "name": "arena.gov.au", "origin": "live", "checksum": "798e863df7a792c5ec34839a1b3a5088e0ac307f31f55dcb144ecd191588505f", "observed_at": "2026-10-15T14:35:59.882989+00:00", "revision_id": "971ff342-01ea-47f2-8532-401d34cf6178", "published_at": null}, "locator": "/html/body/div/main/div[3]/div/div[1]/div[4]/div/div/div/p[1]", "claim_id": "c5dcff5b-1708-4306-8613-af004d15a7af", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "arena.gov.au", "evidence_id": "7fdd4118-9924-43a7-bb97-6518ce3b9f8e", "valid_until": null, "assertion_id": "557f1a65-3e14-4a14-a6f2-79006cf193bd", "temporal_expression": "", "extraction_confidence": 0.9}, "developer": {"value": "Neoen; the page describes Neoen\u2019s plans for the project.", "rights": "facts_only", "source": {"url": "https://arena.gov.au/knowledge-bank/neoen-blyth-big-battery-deployment-project-development-report-milestone-2/", "name": "arena.gov.au", "origin": "live", "checksum": "798e863df7a792c5ec34839a1b3a5088e0ac307f31f55dcb144ecd191588505f", "observed_at": "2026-10-15T14:35:59.882989+00:00", "revision_id": "971ff342-01ea-47f2-8532-401d34cf6178", "published_at": null}, "locator": "/html/body/div/main/div[3]/div/div[1]/div[1]/ul/li[1]", "claim_id": "1d5d5592-96ca-4c5a-acc4-6ca442f87ebf", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "arena.gov.au", "evidence_id": "b59b2cf1-7544-45f3-93fd-bfd927de5b42", "valid_until": null, "assertion_id": "f81fbd29-4a89-4035-a54f-d3bc2ed5ba78", "temporal_expression": "", "extraction_confidence": 0.9}, "regulatory": {"value": "The report extract lists \u201cimproperly defined regulatory compliance in the NER\u201d as a key challenge/lesson; this does not establish project non-compliance.", "rights": "facts_only", "source": {"url": "https://arena.gov.au/knowledge-bank/neoen-blyth-big-battery-deployment-project-development-report-milestone-2/", "name": "arena.gov.au", "origin": "live", "checksum": "798e863df7a792c5ec34839a1b3a5088e0ac307f31f55dcb144ecd191588505f", "observed_at": "2026-10-15T14:35:59.882989+00:00", "revision_id": "971ff342-01ea-47f2-8532-401d34cf6178", "published_at": null}, "locator": "/html/body/div/main/div[3]/div/div[1]/div[4]/div/div/div/p[2]", "claim_id": "65fba79b-4232-4095-8695-c46f76e29ea8", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "arena.gov.au", "evidence_id": "af62df23-803f-45bc-916c-b40dfdc65865", "valid_until": null, "assertion_id": "08f3ef2d-53ee-4525-839e-646b7ff2828f", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "9b957048-780f-43ca-9dfd-cc561147b7d9", "publication": {"local_only": false, "reviewed_at": "2026-10-15T14:46:47.674933+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "ARENA identifies the project as Neoen Big Battery (Blyth), also called the Blyth Battery Energy Storage System (BBESS). Its page describes planned construction of a 200 MW / 400 MWh system in South Australia, with a planned connection to ElectraNet\u2019s 275 kV Blyth West Substation, CATL battery packs and grid-forming operation using Power Electronics inverters. The report extract describes inverter/controller compatibility and communication-cycle discrepancies as development challenges. It also lists an NER regulatory-compliance-definition challenge; this does not establish project non-compliance. The page is marked \u201cLast updated 04 April 2025\u201d.", "schema_version": "1.0", "public_unknowns": ["The supplied page text does not establish procurement or tender status. It links to a development-report PDF, but that PDF\u2019s contents are not included in the supplied evidence.", "The supplied page text does not establish construction or commissioning dates, or a financing amount."], "evidence_observed_at": "2026-10-15T14:35:59.882989+00:00", "knowledge_reviewed_at": "2026-10-15T14:46:16.889645+00:00", "decisive_evidence_observed_at": "2026-10-15T14:35:59.882989+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Neoen Big Battery (Blyth) Deployment Project, also identified as the Blyth Battery Energy Storage System (BBESS).", "original_project_title": "Neoen Big Battery (Blyth) Deployment Project, also identified as the Blyth Battery Energy Storage System (BBESS).", "canonical_url": "https://capexcue.com/projects/neoen-big-battery-blyth-deployment-project-also-identified-as-the-blyth-battery-energy-storage-system-bbess-f5867962-041/", "release": {"id": "a0d8b16d-2142-4e56-aafd-977c3bb26feb", "number": 1, "published_at": "2026-10-15T14:46:48.159178+00:00"}, "release_reference": "release 1 (a0d8b16d-2142-4e56-aafd-977c3bb26feb)", "current_dossier_url": "https://capexcue.com/projects/neoen-big-battery-blyth-deployment-project-also-identified-as-the-blyth-battery-energy-storage-system-bbess-f5867962-041/", "citation": "CapexCue \u2014 Neoen Big Battery (Blyth) Deployment Project, also identified as the Blyth Battery Energy Storage System (BBESS). \u2014 dossier released 2026-10-15T14:46:48.159178+00:00, release 1 (a0d8b16d-2142-4e56-aafd-977c3bb26feb) \u2014 https://capexcue.com/projects/neoen-big-battery-blyth-deployment-project-also-identified-as-the-blyth-battery-energy-storage-system-bbess-f5867962-041/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 16, "start": 0, "sources": [{"url": "https://arena.gov.au/knowledge-bank/neoen-blyth-big-battery-deployment-project-development-report-milestone-2/", "name": "arena.gov.au", "origin": "live", "checksum": "798e863df7a792c5ec34839a1b3a5088e0ac307f31f55dcb144ecd191588505f", "observed_at": "2026-10-15T14:35:59.882989+00:00", "revision_id": "971ff342-01ea-47f2-8532-401d34cf6178", "published_at": null}], "modality": "reported", "predicate": "sector", "raw_value": "Battery storage.", "statement": "Battery storage.", "qualifications": {"attribution": "arena.gov.au"}}, "label": "Energy", "icon": "energy"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 16, "start": 0, "sources": [{"url": "https://arena.gov.au/knowledge-bank/neoen-blyth-big-battery-deployment-project-development-report-milestone-2/", "name": "arena.gov.au", "origin": "live", "checksum": "798e863df7a792c5ec34839a1b3a5088e0ac307f31f55dcb144ecd191588505f", "observed_at": "2026-10-15T14:35:59.882989+00:00", "revision_id": "971ff342-01ea-47f2-8532-401d34cf6178", "published_at": null}], "modality": "reported", "predicate": "sector", "raw_value": "Battery storage.", "statement": "Battery storage.", "qualifications": {"attribution": "arena.gov.au"}}}, "input_hash": "49fea5bd1f90c4b9053fb49fcde81c40c34f4cbfdbca92680ecb338e2334f779", "release_id": "a0d8b16d-2142-4e56-aafd-977c3bb26feb", "type_codes": ["battery_storage"], "field_states": {"type": {"state": "accepted", "reason": "supported_physical_components"}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "South Australia is explicit; this is the Blyth battery deployment."}, "category": {"state": "accepted", "reason": "supported_primary_category"}}, "region_codes": ["oceania"], "release_hash": "3bc4d1326f5e2a2e9360d9d2cd6842278e2d06d7ed8131cd743ca4b95eb1e448", "assessment_id": "d8695dda-b1e4-45e5-bb0e-10680dc691fd", "country_codes": ["AU"], "assessment_hash": "7cff1a143a8db04c0ac6d2a3fa8332dc7b46c3f712dc5cb3445e660fecc7076e", "country_label": "Australia", "region_label": "Oceania", "type_labels": ["Battery Storage"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}