{"name": "Bhagalpur Bypass", "slug": "bhagalpur-bypass-5cb7679c-b40", "as_of": "2026-10-18T21:51:40.440404+00:00", "depth": "basic", "facts": {"name": {"value": "Bhagalpur Bypass", "rights": "facts_only", "source": {"url": "https://www.pib.gov.in/PressReleasePage.aspx?PRID=2244296&lang=1&reg=3", "name": "www.pib.gov.in", "origin": "live", "checksum": "928519ff0d55c521e08ea24ba1d428405a5c62f4025c917c2ec9d6867ebe350d", "observed_at": "2026-10-18T19:59:52.365135+00:00", "revision_id": "f3e4a7d8-2ae7-46ca-b285-77ae171f354f", "published_at": null}, "locator": "/html/body/form/div[2]/div[2]/p[5]", "claim_id": "3e681f36-ee5d-4780-baaf-15d8b1cf59bd", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.pib.gov.in", "evidence_id": "a26f87d4-777a-4182-94fe-fbe11a0f0f1d", "valid_until": null, "assertion_id": "2a27bddf-c875-40d2-a5fc-4a8dddc005f8", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "A planned 13.38 km rail bypass connecting Gonudham Halt on the Barahat\u2013Bhagalpur section with Sabour on the Bhagalpur\u2013Sahibganj section, intended to ease congestion at Bhagalpur junction.", "rights": "facts_only", "source": {"url": "https://www.pib.gov.in/PressReleasePage.aspx?PRID=2244296&lang=1&reg=3", "name": "www.pib.gov.in", "origin": "live", "checksum": "928519ff0d55c521e08ea24ba1d428405a5c62f4025c917c2ec9d6867ebe350d", "observed_at": "2026-10-18T19:59:52.365135+00:00", "revision_id": "f3e4a7d8-2ae7-46ca-b285-77ae171f354f", "published_at": null}, "locator": "/html/body/form/div[2]/div[2]/p[5]", "claim_id": "0211d99a-73b8-4fec-b36f-55135161c18e", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "www.pib.gov.in", "evidence_id": "a26f87d4-777a-4182-94fe-fbe11a0f0f1d", "valid_until": null, "assertion_id": "7deba90b-d4d7-4bd0-a348-24488d993eef", "temporal_expression": "", "extraction_confidence": 0.9}, "activity": {"value": "The Ministry of Railways' construction approval was reported in the release posted 24 March 2026 at 11:38 AM; this is the report timestamp, not a stated approval date.", "rights": "facts_only", "source": {"url": "https://www.pib.gov.in/PressReleasePage.aspx?PRID=2244296&lang=1&reg=3", "name": "www.pib.gov.in", "origin": "live", "checksum": "928519ff0d55c521e08ea24ba1d428405a5c62f4025c917c2ec9d6867ebe350d", "observed_at": "2026-10-18T19:59:52.365135+00:00", "revision_id": "f3e4a7d8-2ae7-46ca-b285-77ae171f354f", "published_at": null}, "locator": "/html/body/form/div[2]/div[2]/div[4]/text-position:71", "claim_id": "3f00fd9d-bca5-4530-add7-7dc848dfbecb", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.pib.gov.in", "evidence_id": "9ded46ee-0841-404e-ba2b-3280ef1ce4b7", "valid_until": null, "assertion_id": "c191f71a-2ff1-4dea-9eb4-a3f5c4b74f8f", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Bhagalpur, Bihar; the project is in Eastern Railway.", "rights": "facts_only", "source": {"url": "https://www.pib.gov.in/PressReleasePage.aspx?PRID=2244296&lang=1&reg=3", "name": "www.pib.gov.in", "origin": "live", "checksum": "928519ff0d55c521e08ea24ba1d428405a5c62f4025c917c2ec9d6867ebe350d", "observed_at": "2026-10-18T19:59:52.365135+00:00", "revision_id": "f3e4a7d8-2ae7-46ca-b285-77ae171f354f", "published_at": null}, "locator": "/html/body/form/div[2]/div[2]/div[3]/h1", "claim_id": "a13cf466-2b17-4798-896a-e37a79e2ee40", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.pib.gov.in", "evidence_id": "94c491d2-1330-4f12-80ab-43d03079b396", "valid_until": null, "assertion_id": "1bf4fe3f-a108-4795-95db-b2ac3e716726", "temporal_expression": "", "extraction_confidence": 0.9}, "financing_stage": {"value": "Approved; the release describes the project as sanctioned.", "rights": "facts_only", "source": {"url": "https://www.pib.gov.in/PressReleasePage.aspx?PRID=2244296&lang=1&reg=3", "name": "www.pib.gov.in", "origin": "live", "checksum": "928519ff0d55c521e08ea24ba1d428405a5c62f4025c917c2ec9d6867ebe350d", "observed_at": "2026-10-18T19:59:52.365135+00:00", "revision_id": "f3e4a7d8-2ae7-46ca-b285-77ae171f354f", "published_at": null}, "locator": "/html/body/form/div[2]/div[2]/p[5]", "claim_id": "6a5ea179-4c56-473f-bdbf-567cbd358219", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.pib.gov.in", "evidence_id": "a26f87d4-777a-4182-94fe-fbe11a0f0f1d", "valid_until": null, "assertion_id": "e6bf4903-91a1-4705-b412-bbfd2692a038", "temporal_expression": "", "extraction_confidence": 0.9}, "financing_amount": {"value": "Estimated project cost: \u20b9303.20 crore.", "rights": "facts_only", "source": {"url": "https://www.pib.gov.in/PressReleasePage.aspx?PRID=2244296&lang=1&reg=3", "name": "www.pib.gov.in", "origin": "live", "checksum": "928519ff0d55c521e08ea24ba1d428405a5c62f4025c917c2ec9d6867ebe350d", "observed_at": "2026-10-18T19:59:52.365135+00:00", "revision_id": "f3e4a7d8-2ae7-46ca-b285-77ae171f354f", "published_at": null}, "locator": "/html/body/form/div[2]/div[2]/p[6]", "claim_id": "50ec1db7-e3fb-47f5-9b58-dbbb99b1c028", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.pib.gov.in", "evidence_id": "91727b03-3dd5-4922-bb4e-e9097b092955", "valid_until": null, "assertion_id": "8c1fec91-2b3a-46d4-93fe-19fa8dd5569a", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "a0ef5b79-9d96-4328-ab61-9a25dd867edd", "publication": {"local_only": false, "reviewed_at": "2026-10-18T21:52:44.860419+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "The Bhagalpur Bypass is a planned 13.38 km rail link in Bhagalpur, Bihar, within Eastern Railway, connecting Gonudham Halt with Sabour. The Ministry of Railways reported construction approval, with an estimated project cost of \u20b9303.20 crore. The release was posted on 24 March 2026 at 11:38 AM; it does not give the approval date.", "schema_version": "1.0", "public_unknowns": ["The release posted 24 March 2026 does not state a procurement route, contractor, or delivery schedule."], "evidence_observed_at": "2026-10-18T19:59:52.365135+00:00", "knowledge_reviewed_at": "2026-10-18T21:51:40.657494+00:00", "decisive_evidence_observed_at": "2026-10-18T19:59:52.365135+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Bhagalpur Bypass", "original_project_title": "Bhagalpur Bypass", "canonical_url": "https://capexcue.com/projects/bhagalpur-bypass-5cb7679c-b40/", "release": {"id": "2aa98e9c-de15-4400-b0fe-3d17961f8dae", "number": 1, "published_at": "2026-10-18T21:52:56.262086+00:00"}, "release_reference": "release 1 (2aa98e9c-de15-4400-b0fe-3d17961f8dae)", "current_dossier_url": "https://capexcue.com/projects/bhagalpur-bypass-5cb7679c-b40/", "citation": "CapexCue \u2014 Bhagalpur Bypass \u2014 dossier released 2026-10-18T21:52:56.262086+00:00, release 1 (2aa98e9c-de15-4400-b0fe-3d17961f8dae) \u2014 https://capexcue.com/projects/bhagalpur-bypass-5cb7679c-b40/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "codex_retained_dossier_curation", "value": "transport_logistics", "support": {"end": 187, "start": 0, "sources": [{"url": "https://www.pib.gov.in/PressReleasePage.aspx?PRID=2244296&lang=1&reg=3", "name": "www.pib.gov.in", "origin": "live", "checksum": "928519ff0d55c521e08ea24ba1d428405a5c62f4025c917c2ec9d6867ebe350d", "observed_at": "2026-10-18T19:59:52.365135+00:00", "revision_id": "f3e4a7d8-2ae7-46ca-b285-77ae171f354f", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "A planned 13.38 km rail bypass connecting Gonudham Halt on the Barahat\u2013Bhagalpur section with Sabour on the Bhagalpur\u2013Sahibganj section, intended to ease congestion at Bhagalpur junction.", "statement": "A planned 13.38 km rail bypass connecting Gonudham Halt on the Barahat\u2013Bhagalpur section with Sabour on the Bhagalpur\u2013Sahibganj section, intended to ease congestion at Bhagalpur junction.", "qualifications": {"attribution": "www.pib.gov.in"}}, "label": "Transport and logistics", "icon": "bridge"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "codex_retained_dossier_curation", "value": "transport_logistics", "support": {"end": 187, "start": 0, "sources": [{"url": "https://www.pib.gov.in/PressReleasePage.aspx?PRID=2244296&lang=1&reg=3", "name": "www.pib.gov.in", "origin": "live", "checksum": "928519ff0d55c521e08ea24ba1d428405a5c62f4025c917c2ec9d6867ebe350d", "observed_at": "2026-10-18T19:59:52.365135+00:00", "revision_id": "f3e4a7d8-2ae7-46ca-b285-77ae171f354f", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "A planned 13.38 km rail bypass connecting Gonudham Halt on the Barahat\u2013Bhagalpur section with Sabour on the Bhagalpur\u2013Sahibganj section, intended to ease congestion at Bhagalpur junction.", "statement": "A planned 13.38 km rail bypass connecting Gonudham Halt on the Barahat\u2013Bhagalpur section with Sabour on the Bhagalpur\u2013Sahibganj section, intended to ease congestion at Bhagalpur junction.", "qualifications": {"attribution": "www.pib.gov.in"}}}, "input_hash": "aca05fb8a509136a713d66f05760f917e1ae73720ff81b12e9233e49550dd99d", "release_id": "2aa98e9c-de15-4400-b0fe-3d17961f8dae", "type_codes": ["railway"], "field_states": {"type": {"state": "accepted", "reason": "Bhagalpur, Bihar is in India; this bypass is explicitly railway infrastructure."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "Bhagalpur, Bihar is in India; this bypass is explicitly railway infrastructure."}, "category": {"state": "accepted", "reason": "Bhagalpur, Bihar is in India; this bypass is explicitly railway infrastructure."}}, "region_codes": ["asia"], "release_hash": "2b4ce73d2e075b44950bbc5c16cbb4dc3186b8e60c31c5736cd8a4d227415c19", "assessment_id": "113355de-1824-4697-83ae-ad22fb2d5b10", "country_codes": ["IN"], "assessment_hash": "a9ba03f04e26e633ec346074b2bb59013ce2ddce48f580ba501b77a7f7642ad6", "country_label": "India", "region_label": "Asia", "type_labels": ["Railway"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}