{"name": "Rumah 1 IPP; also described as the \u201cRumah-1 Independent Power Project.\u201d", "slug": "rumah-1-ipp-also-described-as-the-rumah-1-independent-power-project-d65a1a35-f17", "as_of": "2026-10-18T07:51:30.673904+00:00", "depth": "basic", "facts": {"date": {"value": "Commercial operations date listed as Q2 2028.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/rumah-1-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "900ff718d7ebaa6682eca8565fa5d9d5f6e83c2ea39c6d1a284e117bb9110d13", "observed_at": "2026-10-18T07:27:11.032713+00:00", "revision_id": "fd35f75e-68c8-4c2a-9141-b79aa0397dd2", "published_at": null}, "locator": "/html/head/main/div/section[4]/div/ul/li[9]", "claim_id": "f207b8bf-b7df-4c7b-990c-7974418b278e", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "e0a4758a-6046-4a0e-8a4f-a5c5884a40f0", "valid_until": null, "assertion_id": "6f952be5-c1b4-40b8-bdf4-1dbb88e4b568", "temporal_expression": "", "extraction_confidence": 0.9}, "name": {"value": "Rumah 1 IPP; also described as the \u201cRumah-1 Independent Power Project.\u201d", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/rumah-1-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "900ff718d7ebaa6682eca8565fa5d9d5f6e83c2ea39c6d1a284e117bb9110d13", "observed_at": "2026-10-18T07:27:11.032713+00:00", "revision_id": "fd35f75e-68c8-4c2a-9141-b79aa0397dd2", "published_at": null}, "locator": "/html/head/main/div/section[1]/div[1]/div/div/div/div/div[1]/h3", "claim_id": "fb09f116-e9b2-45bc-8e75-86a6cf509cfc", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "ac3a089e-24a2-4c28-81fd-c8165c6dc35c", "valid_until": null, "assertion_id": "b2acaab6-f10a-4806-aa54-3bcafd959ea6", "temporal_expression": "", "extraction_confidence": 0.9}, "owner": {"value": "Reported shareholders: ACWA Power 35%, Saudi Electricity Company (SEC) 35%, and Korea Electric Power Corporation (KEPCO) 30%.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/rumah-1-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "900ff718d7ebaa6682eca8565fa5d9d5f6e83c2ea39c6d1a284e117bb9110d13", "observed_at": "2026-10-18T07:27:11.032713+00:00", "revision_id": "fd35f75e-68c8-4c2a-9141-b79aa0397dd2", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p", "claim_id": "0b742a4c-b365-44cf-bb59-d6baa2726c10", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "3fda3645-6a5f-432d-b50a-b817eb364f53", "valid_until": null, "assertion_id": "e6e0d4d0-87ef-4002-93d1-996634a11d98", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "A 1,800 MW combined-cycle gas turbine (CCGT) independent power plant using natural gas.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/rumah-1-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "900ff718d7ebaa6682eca8565fa5d9d5f6e83c2ea39c6d1a284e117bb9110d13", "observed_at": "2026-10-18T07:27:11.032713+00:00", "revision_id": "fd35f75e-68c8-4c2a-9141-b79aa0397dd2", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p", "claim_id": "02cc859b-995b-4e3c-9300-84a9ad57c40c", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "3fda3645-6a5f-432d-b50a-b817eb364f53", "valid_until": null, "assertion_id": "aad807e6-6f63-4b4d-aca6-a86c2dc6d26d", "temporal_expression": "", "extraction_confidence": 0.9}, "activity": {"value": "ACWA Power and Saudi Power Procurement Company (SPPC) are reported to have signed a 25-year power purchase agreement for development, financing, build, own and operate of the plant; SPPC is identified as the sole off-taker.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/rumah-1-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "900ff718d7ebaa6682eca8565fa5d9d5f6e83c2ea39c6d1a284e117bb9110d13", "observed_at": "2026-10-18T07:27:11.032713+00:00", "revision_id": "fd35f75e-68c8-4c2a-9141-b79aa0397dd2", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p", "claim_id": "ccfc303c-94e7-426f-b71d-5be0071cd6b5", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "3fda3645-6a5f-432d-b50a-b817eb364f53", "valid_until": null, "assertion_id": "cef84290-337a-4c8b-80c6-35ccf531e594", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Riyadh region; key facts specify Riyadh province, Saudi Arabia.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/rumah-1-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "900ff718d7ebaa6682eca8565fa5d9d5f6e83c2ea39c6d1a284e117bb9110d13", "observed_at": "2026-10-18T07:27:11.032713+00:00", "revision_id": "fd35f75e-68c8-4c2a-9141-b79aa0397dd2", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p", "claim_id": "68d6bbed-ce71-4e1d-8809-8bfa4200a6a7", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "3fda3645-6a5f-432d-b50a-b817eb364f53", "valid_until": null, "assertion_id": "ef2b061f-da39-4f14-b769-6bd5c731217a", "temporal_expression": "", "extraction_confidence": 0.9}, "developer": {"value": "ACWA Power.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/rumah-1-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "900ff718d7ebaa6682eca8565fa5d9d5f6e83c2ea39c6d1a284e117bb9110d13", "observed_at": "2026-10-18T07:27:11.032713+00:00", "revision_id": "fd35f75e-68c8-4c2a-9141-b79aa0397dd2", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p", "claim_id": "380689e1-68ad-40a9-9240-3359e9bb49de", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "3fda3645-6a5f-432d-b50a-b817eb364f53", "valid_until": null, "assertion_id": "4d8db928-70c6-446d-840e-3181bc5b93d9", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "ad05c10e-830f-4016-899a-c2246975d007", "publication": {"local_only": false, "reviewed_at": "2026-10-18T07:52:54.554223+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "Rumah 1 IPP is described as a 1,800 MW natural-gas CCGT independent power plant in Riyadh province, Saudi Arabia. ACWA Power is identified as developer; the source reports a 25-year PPA with SPPC and lists Q2 2028 as the planned commercial operations date.", "schema_version": "1.0", "public_unknowns": ["The supplied project-page content, observed 2026-10-18, does not state a financing amount or establish current procurement availability or tender status.", "The supplied content does not describe specific equipment packages or their procurement status."], "evidence_observed_at": "2026-10-18T07:27:11.032713+00:00", "knowledge_reviewed_at": "2026-10-18T07:51:31.388785+00:00", "decisive_evidence_observed_at": "2026-10-18T07:27:11.032713+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Rumah 1 IPP; also described as the \u201cRumah-1 Independent Power Project.\u201d", "original_project_title": "Rumah 1 IPP; also described as the \u201cRumah-1 Independent Power Project.\u201d", "canonical_url": "https://capexcue.com/projects/rumah-1-ipp-also-described-as-the-rumah-1-independent-power-project-d65a1a35-f17/", "release": {"id": "e792fbbf-bc47-4487-af76-1d10b31277d6", "number": 1, "published_at": "2026-10-18T07:53:01.450246+00:00"}, "release_reference": "release 1 (e792fbbf-bc47-4487-af76-1d10b31277d6)", "current_dossier_url": "https://capexcue.com/projects/rumah-1-ipp-also-described-as-the-rumah-1-independent-power-project-d65a1a35-f17/", "citation": "CapexCue \u2014 Rumah 1 IPP; also described as the \u201cRumah-1 Independent Power Project.\u201d \u2014 dossier released 2026-10-18T07:53:01.450246+00:00, release 1 (e792fbbf-bc47-4487-af76-1d10b31277d6) \u2014 https://capexcue.com/projects/rumah-1-ipp-also-described-as-the-rumah-1-independent-power-project-d65a1a35-f17/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 87, "start": 0, "sources": [{"url": "https://acwapower.com/en/what-we-do/projects/rumah-1-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "900ff718d7ebaa6682eca8565fa5d9d5f6e83c2ea39c6d1a284e117bb9110d13", "observed_at": "2026-10-18T07:27:11.032713+00:00", "revision_id": "fd35f75e-68c8-4c2a-9141-b79aa0397dd2", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "A 1,800 MW combined-cycle gas turbine (CCGT) independent power plant using natural gas.", "statement": "A 1,800 MW combined-cycle gas turbine (CCGT) independent power plant using natural gas.", "qualifications": {"attribution": "acwapower.com"}}, "label": "Energy", "icon": "energy"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 87, "start": 0, "sources": [{"url": "https://acwapower.com/en/what-we-do/projects/rumah-1-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "900ff718d7ebaa6682eca8565fa5d9d5f6e83c2ea39c6d1a284e117bb9110d13", "observed_at": "2026-10-18T07:27:11.032713+00:00", "revision_id": "fd35f75e-68c8-4c2a-9141-b79aa0397dd2", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "A 1,800 MW combined-cycle gas turbine (CCGT) independent power plant using natural gas.", "statement": "A 1,800 MW combined-cycle gas turbine (CCGT) independent power plant using natural gas.", "qualifications": {"attribution": "acwapower.com"}}}, "input_hash": "0cefc5c0483655f1c8540ddcb62db820468574cabbf3986cb34b3053bbd6ef2a", "release_id": "e792fbbf-bc47-4487-af76-1d10b31277d6", "type_codes": [], "field_states": {"type": {"state": "unknown_after_assessment", "reason": "Retain accepted Saudi energy metadata; combined-cycle gas generation lacks a registered asset type."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "The project location fact identifies Riyadh province, Saudi Arabia; the supplied geographic reference maps Saudi Arabia to SA."}, "category": {"state": "accepted", "reason": "The asset is a 1,800 MW natural-gas combined-cycle power plant, supporting the energy category."}}, "region_codes": ["middle_east_north_africa"], "release_hash": "07290e3fe0fb5f2276f0230277946392bc891535007e7510d2566cfff8e62a75", "assessment_id": "b179d4bd-2e83-4bfe-8dce-aa73edfa474a", "country_codes": ["SA"], "assessment_hash": "5d23c01cab55507a5691896bc1b8061d9dcbeff713896a1ae720381aac64d671", "country_label": "Saudi Arabia", "region_label": "Middle East North Africa", "type_labels": []}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}