{"name": "Port of Mobile Phase V new container berth expansion", "slug": "port-of-mobile-phase-v-new-container-berth-expansion-9c28272b-153", "as_of": "2026-10-18T21:35:30.038564+00:00", "depth": "basic", "facts": {"date": {"value": "The announcement is dated 28 October 2025.", "rights": "facts_only", "source": {"url": "https://www2.apmterminals.com/en/news/news-releases/2025/251028-new-berth-extention-port-of-mobile", "name": "www2.apmterminals.com", "origin": "live", "checksum": "7e691bdba1e21468a42a0286d99a86b9ce65b405a5c36277913a37f6a210fc2c", "observed_at": "2026-10-18T06:45:26.184589+00:00", "revision_id": "db58800f-820d-41e6-9f32-582e4e2b16c9", "published_at": null}, "locator": "/html/body/main/div[3]/div/div[1]/div[1]/p", "claim_id": "85f48e4f-d132-4e81-a240-d8c660b71977", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www2.apmterminals.com", "evidence_id": "e1bc4ad8-dc94-43d6-8f29-54ce5d662dc3", "valid_until": null, "assertion_id": "b7721a39-dbc2-4ace-977d-0a91b72caeaf", "temporal_expression": "", "extraction_confidence": 0.9}, "name": {"value": "Port of Mobile Phase V new container berth expansion", "rights": "facts_only", "source": {"url": "https://www2.apmterminals.com/en/news/news-releases/2025/251028-new-berth-extention-port-of-mobile", "name": "www2.apmterminals.com", "origin": "live", "checksum": "7e691bdba1e21468a42a0286d99a86b9ce65b405a5c36277913a37f6a210fc2c", "observed_at": "2026-10-18T06:45:26.184589+00:00", "revision_id": "db58800f-820d-41e6-9f32-582e4e2b16c9", "published_at": null}, "locator": "/html/body/main/div[3]/div/div[1]/h1", "claim_id": "30e26576-456b-4b96-a22e-c45ab046769b", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www2.apmterminals.com", "evidence_id": "58301733-9b63-4a92-b273-3d0f51e22bcc", "valid_until": null, "assertion_id": "9b719f53-8300-4c07-bd6b-a6eca05b643e", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "A new 1,300-foot (~400-meter) container berth; the announced capacity increase is 50%, enabling the terminal to handle three ultra-large container vessels simultaneously.", "rights": "facts_only", "source": {"url": "https://www2.apmterminals.com/en/news/news-releases/2025/251028-new-berth-extention-port-of-mobile", "name": "www2.apmterminals.com", "origin": "live", "checksum": "7e691bdba1e21468a42a0286d99a86b9ce65b405a5c36277913a37f6a210fc2c", "observed_at": "2026-10-18T06:45:26.184589+00:00", "revision_id": "db58800f-820d-41e6-9f32-582e4e2b16c9", "published_at": null}, "locator": "/html/body/main/div[3]/div/div[1]/div[2]/p[1]", "claim_id": "6e55f36b-2faf-4237-971d-6fcadf840779", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "www2.apmterminals.com", "evidence_id": "6875400b-dcb6-466e-bcc8-8784ddcaa100", "valid_until": null, "assertion_id": "72163480-6583-41b8-bec3-3e5346fa12ee", "temporal_expression": "", "extraction_confidence": 0.9}, "finance": {"value": "Described as funded by federal appropriations to the Port Authority and enhanced by private investments from APM Terminals.", "rights": "facts_only", "source": {"url": "https://www2.apmterminals.com/en/news/news-releases/2025/251028-new-berth-extention-port-of-mobile", "name": "www2.apmterminals.com", "origin": "live", "checksum": "7e691bdba1e21468a42a0286d99a86b9ce65b405a5c36277913a37f6a210fc2c", "observed_at": "2026-10-18T06:45:26.184589+00:00", "revision_id": "db58800f-820d-41e6-9f32-582e4e2b16c9", "published_at": null}, "locator": "/html/body/main/div[3]/div/div[1]/div[2]/p[1]", "claim_id": "301b3d72-adbe-425d-bcc9-00c97d529923", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www2.apmterminals.com", "evidence_id": "6875400b-dcb6-466e-bcc8-8784ddcaa100", "valid_until": null, "assertion_id": "8721dc42-e9d4-4d6d-bb1e-a580a9f6d569", "temporal_expression": "", "extraction_confidence": 0.9}, "sponsor": {"value": "The Alabama Port Authority and APM Terminals Mobile announced an agreement to proceed with construction.", "rights": "facts_only", "source": {"url": "https://www2.apmterminals.com/en/news/news-releases/2025/251028-new-berth-extention-port-of-mobile", "name": "www2.apmterminals.com", "origin": "live", "checksum": "7e691bdba1e21468a42a0286d99a86b9ce65b405a5c36277913a37f6a210fc2c", "observed_at": "2026-10-18T06:45:26.184589+00:00", "revision_id": "db58800f-820d-41e6-9f32-582e4e2b16c9", "published_at": null}, "locator": "/html/body/main/div[3]/div/div[1]/h1", "claim_id": "300627ab-e67c-4003-9063-04abdd5c5cd4", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www2.apmterminals.com", "evidence_id": "58301733-9b63-4a92-b273-3d0f51e22bcc", "valid_until": null, "assertion_id": "1ff50ec4-cf6f-470a-b750-c03e381581b8", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Port of Mobile, Alabama; the berth is planned for the southern end of the existing container terminal.", "rights": "facts_only", "source": {"url": "https://www2.apmterminals.com/en/news/news-releases/2025/251028-new-berth-extention-port-of-mobile", "name": "www2.apmterminals.com", "origin": "live", "checksum": "7e691bdba1e21468a42a0286d99a86b9ce65b405a5c36277913a37f6a210fc2c", "observed_at": "2026-10-18T06:45:26.184589+00:00", "revision_id": "db58800f-820d-41e6-9f32-582e4e2b16c9", "published_at": null}, "locator": "/html/body/main/div[3]/div/div[1]/h1", "claim_id": "3c3c1925-93ef-4497-af6c-f905be036e92", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "www2.apmterminals.com", "evidence_id": "58301733-9b63-4a92-b273-3d0f51e22bcc", "valid_until": null, "assertion_id": "fed5bae5-0f2d-4c24-8b90-bbf580e6e2ac", "temporal_expression": "", "extraction_confidence": 0.9}, "next_milestone": {"value": "Construction is expected to begin in 2026; completion is targeted for 24 months after groundbreaking.", "rights": "facts_only", "source": {"url": "https://www2.apmterminals.com/en/news/news-releases/2025/251028-new-berth-extention-port-of-mobile", "name": "www2.apmterminals.com", "origin": "live", "checksum": "7e691bdba1e21468a42a0286d99a86b9ce65b405a5c36277913a37f6a210fc2c", "observed_at": "2026-10-18T06:45:26.184589+00:00", "revision_id": "db58800f-820d-41e6-9f32-582e4e2b16c9", "published_at": null}, "locator": "/html/body/main/div[3]/div/div[1]/div[2]/p[3]", "claim_id": "77a5d4d0-2034-4bd7-8e90-0ac4d925e4ce", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "www2.apmterminals.com", "evidence_id": "32620e2a-6de7-443e-9133-12ccb24ac5b1", "valid_until": null, "assertion_id": "e0a089e7-6b24-4525-9c48-81889791a48f", "temporal_expression": "", "extraction_confidence": 0.9}, "financing_amount": {"value": "$131 million project amount.", "rights": "facts_only", "source": {"url": "https://www2.apmterminals.com/en/news/news-releases/2025/251028-new-berth-extention-port-of-mobile", "name": "www2.apmterminals.com", "origin": "live", "checksum": "7e691bdba1e21468a42a0286d99a86b9ce65b405a5c36277913a37f6a210fc2c", "observed_at": "2026-10-18T06:45:26.184589+00:00", "revision_id": "db58800f-820d-41e6-9f32-582e4e2b16c9", "published_at": null}, "locator": "/html/body/main/div[3]/div/div[1]/div[2]/p[1]", "claim_id": "273b4fe8-1cb3-4dbf-8f6e-49d38f176375", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www2.apmterminals.com", "evidence_id": "6875400b-dcb6-466e-bcc8-8784ddcaa100", "valid_until": null, "assertion_id": "f2f55295-1572-40ed-a816-77521d8fa81f", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "ad7d0d84-fb6b-4da7-8bd1-eb5aa3543ecc", "publication": {"local_only": false, "reviewed_at": "2026-10-18T21:37:29.044801+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "The announcement dated 28 October 2025 describes a planned new container berth at the Port of Mobile, Alabama, at the southern end of the existing terminal. The announced scope is a 1,300-foot (~400-meter) berth, with a stated 50% capacity increase to enable three ultra-large container vessels to be handled simultaneously. The release reports a $131 million project amount, funded by federal appropriations to the Port Authority and enhanced by private investment from APM Terminals. Construction was expected to begin in 2026, with completion targeted 24 months after groundbreaking; these are announced expectations, not confirmation of completed milestones.", "schema_version": "1.0", "public_unknowns": ["The 28 October 2025 announcement does not confirm whether construction has started or provide a current progress update.", "The announcement does not state procurement status or provide package-specific design or equipment specifications."], "evidence_observed_at": "2026-10-18T06:45:26.184589+00:00", "knowledge_reviewed_at": "2026-10-18T21:35:30.323986+00:00", "decisive_evidence_observed_at": "2026-10-18T06:45:26.184589+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Port of Mobile Phase V new container berth expansion", "original_project_title": "Port of Mobile Phase V new container berth expansion", "canonical_url": "https://capexcue.com/projects/port-of-mobile-phase-v-new-container-berth-expansion-9c28272b-153/", "release": {"id": "de8457a4-9731-4cab-94da-829b88078f04", "number": 1, "published_at": "2026-10-18T21:37:40.230087+00:00"}, "release_reference": "release 1 (de8457a4-9731-4cab-94da-829b88078f04)", "current_dossier_url": "https://capexcue.com/projects/port-of-mobile-phase-v-new-container-berth-expansion-9c28272b-153/", "citation": "CapexCue \u2014 Port of Mobile Phase V new container berth expansion \u2014 dossier released 2026-10-18T21:37:40.230087+00:00, release 1 (de8457a4-9731-4cab-94da-829b88078f04) \u2014 https://capexcue.com/projects/port-of-mobile-phase-v-new-container-berth-expansion-9c28272b-153/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "codex_retained_dossier_curation", "value": "transport_logistics", "support": {"end": 170, "start": 0, "sources": [{"url": "https://www2.apmterminals.com/en/news/news-releases/2025/251028-new-berth-extention-port-of-mobile", "name": "www2.apmterminals.com", "origin": "live", "checksum": "7e691bdba1e21468a42a0286d99a86b9ce65b405a5c36277913a37f6a210fc2c", "observed_at": "2026-10-18T06:45:26.184589+00:00", "revision_id": "db58800f-820d-41e6-9f32-582e4e2b16c9", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "A new 1,300-foot (~400-meter) container berth; the announced capacity increase is 50%, enabling the terminal to handle three ultra-large container vessels simultaneously.", "statement": "A new 1,300-foot (~400-meter) container berth; the announced capacity increase is 50%, enabling the terminal to handle three ultra-large container vessels simultaneously.", "qualifications": {"attribution": "www2.apmterminals.com"}}, "label": "Transport and logistics", "icon": "bridge"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "codex_retained_dossier_curation", "value": "transport_logistics", "support": {"end": 170, "start": 0, "sources": [{"url": "https://www2.apmterminals.com/en/news/news-releases/2025/251028-new-berth-extention-port-of-mobile", "name": "www2.apmterminals.com", "origin": "live", "checksum": "7e691bdba1e21468a42a0286d99a86b9ce65b405a5c36277913a37f6a210fc2c", "observed_at": "2026-10-18T06:45:26.184589+00:00", "revision_id": "db58800f-820d-41e6-9f32-582e4e2b16c9", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "A new 1,300-foot (~400-meter) container berth; the announced capacity increase is 50%, enabling the terminal to handle three ultra-large container vessels simultaneously.", "statement": "A new 1,300-foot (~400-meter) container berth; the announced capacity increase is 50%, enabling the terminal to handle three ultra-large container vessels simultaneously.", "qualifications": {"attribution": "www2.apmterminals.com"}}}, "input_hash": "1c1d8ad5a1de8f721995fcc293724d58838f47ce6fcad8c5a5d9cbc5c21a97e9", "release_id": "de8457a4-9731-4cab-94da-829b88078f04", "type_codes": ["seaport"], "field_states": {"type": {"state": "accepted", "reason": "Mobile, Alabama identifies the United States; planned container berth expansion is explicit."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "Mobile, Alabama identifies the United States; planned container berth expansion is explicit."}, "category": {"state": "accepted", "reason": "Mobile, Alabama identifies the United States; planned container berth expansion is explicit."}}, "region_codes": ["north_america"], "release_hash": "eb10dcdfd1773c43b10c17f218f3bb61444b87c646218b875596d45b3b30782d", "assessment_id": "0ba6fb09-f880-436e-8b86-e9e92587d49f", "country_codes": ["US"], "assessment_hash": "2c089578890a450b0a00aa336a43cb1c5182e17abb58c10e79e3cfc9d980b861", "country_label": "United States", "region_label": "North America", "type_labels": ["Seaport"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}