{"name": "EMILI, associated in the source with Imerys.", "slug": "emili-associated-in-the-source-with-imerys-ba0070c8af9dde91", "as_of": "2026-10-01T20:22:19.048465+00:00", "depth": "basic", "facts": {"name": {"value": "EMILI, associated in the source with Imerys.", "rights": "facts_only", "source": {"url": "https://www.ecologie.gouv.fr/sites/default/files/documents/22.04.2026_DP-ACCELERER-NOS-GRANDS-PROJETS-Choose_FR.pdf", "name": "French ministry screened native presskit text", "origin": "live", "checksum": "6b5abd7b2f53dad4fe9740f4568e93fb1c4cbde5510c48d492a0657081d0401c", "observed_at": "2026-10-01T19:37:48.041558+00:00", "revision_id": "3bb976a1-e2d8-48e5-9df3-8e23fa3fe26e", "published_at": null}, "locator": "page:18", "claim_id": "9c63eb45-4735-4ab9-8ac7-251cd28bde21", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "French ministry screened native presskit text", "evidence_id": "ac8e5e85-92e0-487a-ae1d-d92ff26d8cc9", "valid_until": null, "assertion_id": "64119587-fce4-4b0e-9029-2591e16779f7", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "The project is expected to produce 34,000 tonnes of lithium hydroxide annually, described as equivalent to the needs of 700,000 electric vehicles, and to create 170 direct jobs.", "rights": "facts_only", "source": {"url": "https://www.ecologie.gouv.fr/sites/default/files/documents/22.04.2026_DP-ACCELERER-NOS-GRANDS-PROJETS-Choose_FR.pdf", "name": "French ministry screened native presskit text", "origin": "live", "checksum": "6b5abd7b2f53dad4fe9740f4568e93fb1c4cbde5510c48d492a0657081d0401c", "observed_at": "2026-10-01T19:37:48.041558+00:00", "revision_id": "3bb976a1-e2d8-48e5-9df3-8e23fa3fe26e", "published_at": null}, "locator": "page:18", "claim_id": "4fa9a965-1106-4d14-a423-0f2ba2810cf3", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "French ministry screened native presskit text", "evidence_id": "405ecd76-957f-4f93-8509-d6f692e10141", "valid_until": null, "assertion_id": "a4ea8262-7497-457f-bafe-ae80636ee256", "temporal_expression": "", "extraction_confidence": 0.9}, "country": {"value": "France, in the context of the dossier\u2019s examples of projects supported on French territory.", "rights": "facts_only", "source": {"url": "https://www.ecologie.gouv.fr/sites/default/files/documents/22.04.2026_DP-ACCELERER-NOS-GRANDS-PROJETS-Choose_FR.pdf", "name": "French ministry screened native presskit text", "origin": "live", "checksum": "6b5abd7b2f53dad4fe9740f4568e93fb1c4cbde5510c48d492a0657081d0401c", "observed_at": "2026-10-01T19:37:48.041558+00:00", "revision_id": "3bb976a1-e2d8-48e5-9df3-8e23fa3fe26e", "published_at": null}, "locator": "page:18", "claim_id": "67e4de04-92a9-4932-8f36-7f7dda4685b2", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "French ministry screened native presskit text", "evidence_id": "381b5258-a7e5-4649-9252-b368ede9db1c", "valid_until": null, "assertion_id": "33480c70-1a68-4bbd-ac87-04ddef231400", "temporal_expression": "", "extraction_confidence": 0.9}, "activity": {"value": "Development of an underground lithiniferous mica deposit in Allier.", "rights": "facts_only", "source": {"url": "https://www.ecologie.gouv.fr/sites/default/files/documents/22.04.2026_DP-ACCELERER-NOS-GRANDS-PROJETS-Choose_FR.pdf", "name": "French ministry screened native presskit text", "origin": "live", "checksum": "6b5abd7b2f53dad4fe9740f4568e93fb1c4cbde5510c48d492a0657081d0401c", "observed_at": "2026-10-01T19:37:48.041558+00:00", "revision_id": "3bb976a1-e2d8-48e5-9df3-8e23fa3fe26e", "published_at": null}, "locator": "page:18", "claim_id": "594cf008-e8b0-446d-a177-c880f57c4b4e", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "French ministry screened native presskit text", "evidence_id": "f293822f-71ee-47b8-853e-667af4f810de", "valid_until": null, "assertion_id": "3e34f88b-4c67-4228-a695-90b2a9c7a6d9", "temporal_expression": "", "extraction_confidence": 0.9}, "delivery": {"value": "Commercial production is stated to begin from 2030.", "rights": "facts_only", "source": {"url": "https://www.ecologie.gouv.fr/sites/default/files/documents/22.04.2026_DP-ACCELERER-NOS-GRANDS-PROJETS-Choose_FR.pdf", "name": "French ministry screened native presskit text", "origin": "live", "checksum": "6b5abd7b2f53dad4fe9740f4568e93fb1c4cbde5510c48d492a0657081d0401c", "observed_at": "2026-10-01T19:37:48.041558+00:00", "revision_id": "3bb976a1-e2d8-48e5-9df3-8e23fa3fe26e", "published_at": null}, "locator": "page:18", "claim_id": "b22e8074-0a82-46d1-8239-2e4629ceb4e4", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "French ministry screened native presskit text", "evidence_id": "080b0c51-1f18-4bfa-a2b1-07189c858321", "valid_until": null, "assertion_id": "b564af4e-999d-4b1f-83c9-5169200cab24", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Echassi\u00e8re and Saint-Victor, in Allier.", "rights": "facts_only", "source": {"url": "https://www.ecologie.gouv.fr/sites/default/files/documents/22.04.2026_DP-ACCELERER-NOS-GRANDS-PROJETS-Choose_FR.pdf", "name": "French ministry screened native presskit text", "origin": "live", "checksum": "6b5abd7b2f53dad4fe9740f4568e93fb1c4cbde5510c48d492a0657081d0401c", "observed_at": "2026-10-01T19:37:48.041558+00:00", "revision_id": "3bb976a1-e2d8-48e5-9df3-8e23fa3fe26e", "published_at": null}, "locator": "page:18", "claim_id": "14e924e3-2a8f-439e-a430-9b491ccbd008", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "French ministry screened native presskit text", "evidence_id": "35a5f93c-6fee-4ec2-8a87-44261fe1a3d9", "valid_until": null, "assertion_id": "4cd67b88-ef33-4c60-89d2-4cc19ff2d224", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "af09208c-5c87-4030-940a-f305254247fc", "publication": {"local_only": false, "reviewed_at": "2026-10-16T16:56:41.945814+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "A French government press dossier dated April 2026 lists EMILI, associated with Imerys, as a project to develop an underground lithiniferous mica deposit at Echassi\u00e8re and Saint-Victor in Allier. It states that the project plans annual production of 34,000 tonnes of lithium hydroxide, described as equivalent to the needs of 700,000 electric vehicles, and 170 direct jobs. Commercial production is stated to begin from 2030.", "schema_version": "1.0", "public_unknowns": ["The supplied pages do not give a project-specific investment amount, permits, procurement details, contractors, current works status, or individual C3IV approval or payment details.", "The source is a dossier dated April 2026; the supplied pages do not establish project status after that date.", "The dossier has 20 pages, but only pages 1, 18, and 19 were supplied for review; other pages and graphical content were not assessed. OCR was not commissioned, and the extracted text may have imperfect reading order or layout."], "evidence_observed_at": "2026-10-01T19:37:48.041558+00:00", "knowledge_reviewed_at": "2026-10-16T16:56:41.945814+00:00", "decisive_evidence_observed_at": "2026-10-01T19:37:48.041558+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "EMILI, associated in the source with Imerys.", "original_project_title": "EMILI, associated in the source with Imerys.", "canonical_url": "https://capexcue.com/projects/emili-associated-in-the-source-with-imerys-ba0070c8af9dde91/", "release": {"id": "088e3d1d-1dc7-4e99-a549-d7e04cdc6e5a", "number": 1, "published_at": "2026-10-16T16:56:42.494641+00:00"}, "release_reference": "release 1 (088e3d1d-1dc7-4e99-a549-d7e04cdc6e5a)", "current_dossier_url": "https://capexcue.com/projects/emili-associated-in-the-source-with-imerys-ba0070c8af9dde91/", "citation": "CapexCue \u2014 EMILI, associated in the source with Imerys. \u2014 dossier released 2026-10-16T16:56:42.494641+00:00, release 1 (088e3d1d-1dc7-4e99-a549-d7e04cdc6e5a) \u2014 https://capexcue.com/projects/emili-associated-in-the-source-with-imerys-ba0070c8af9dde91/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "codex_retained_dossier_curation", "value": "industrial_process", "support": {"end": 177, "start": 0, "sources": [{"url": "https://www.ecologie.gouv.fr/sites/default/files/documents/22.04.2026_DP-ACCELERER-NOS-GRANDS-PROJETS-Choose_FR.pdf", "name": "French ministry screened native presskit text", "origin": "live", "checksum": "6b5abd7b2f53dad4fe9740f4568e93fb1c4cbde5510c48d492a0657081d0401c", "observed_at": "2026-10-01T19:37:48.041558+00:00", "revision_id": "3bb976a1-e2d8-48e5-9df3-8e23fa3fe26e", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "The project is expected to produce 34,000 tonnes of lithium hydroxide annually, described as equivalent to the needs of 700,000 electric vehicles, and to create 170 direct jobs.", "statement": "The project is expected to produce 34,000 tonnes of lithium hydroxide annually, described as equivalent to the needs of 700,000 electric vehicles, and to create 170 direct jobs.", "qualifications": {"attribution": "French ministry screened native presskit text"}}, "label": "Industrial processes", "icon": "project"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "codex_retained_dossier_curation", "value": "industrial_process", "support": {"end": 177, "start": 0, "sources": [{"url": "https://www.ecologie.gouv.fr/sites/default/files/documents/22.04.2026_DP-ACCELERER-NOS-GRANDS-PROJETS-Choose_FR.pdf", "name": "French ministry screened native presskit text", "origin": "live", "checksum": "6b5abd7b2f53dad4fe9740f4568e93fb1c4cbde5510c48d492a0657081d0401c", "observed_at": "2026-10-01T19:37:48.041558+00:00", "revision_id": "3bb976a1-e2d8-48e5-9df3-8e23fa3fe26e", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "The project is expected to produce 34,000 tonnes of lithium hydroxide annually, described as equivalent to the needs of 700,000 electric vehicles, and to create 170 direct jobs.", "statement": "The project is expected to produce 34,000 tonnes of lithium hydroxide annually, described as equivalent to the needs of 700,000 electric vehicles, and to create 170 direct jobs.", "qualifications": {"attribution": "French ministry screened native presskit text"}}}, "input_hash": "364a77d9f0e9fc22969e5ffc76711cbf6dffd3d18ed74202b59b67a80343799c", "release_id": "088e3d1d-1dc7-4e99-a549-d7e04cdc6e5a", "type_codes": [], "field_states": {"type": {"state": "unknown_after_assessment", "reason": "French locations and lithium-hydroxide production are explicit; no registered lithium-production asset type."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "French locations and lithium-hydroxide production are explicit; no registered lithium-production asset type."}, "category": {"state": "accepted", "reason": "French locations and lithium-hydroxide production are explicit; no registered lithium-production asset type."}}, "region_codes": ["europe"], "release_hash": "9d256c7741ad17de752d3022007f17ca2c2d69ebb54c568c79b54aee23d3d27f", "assessment_id": "7babf14a-3355-40d4-81c4-9fcada8fdddc", "country_codes": ["FR"], "assessment_hash": "1ef1f951c07644eb4f826604a1bfb4c57b8f57145f0fefe3d6c3717c01491a54", "country_label": "France", "region_label": "Europe", "type_labels": []}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}