{"name": "Casablanca desalination plant", "slug": "casablanca-desalination-plant-85604add-d94", "as_of": "2026-10-17T17:56:52.295878+00:00", "depth": "basic", "facts": {"date": {"value": "Scheduled for completion in 2028.", "rights": "facts_only", "source": {"url": "https://www.acciona.com/updates/news/acciona-signs-financing-casablanca-desalination-plant", "name": "www.acciona.com", "origin": "live", "checksum": "f3245d6894746b59ef3dd281bd4f4ddfb352a0ebdbb95ae2556145a68c35644f", "observed_at": "2026-10-17T17:21:29.614493+00:00", "revision_id": "756c9f63-6c3b-48b9-9559-a883bac4b1eb", "published_at": null}, "locator": "/html/body/div/div/main/div/div[1]/div[1]/a-mo-wysiwyg/div/div[2]/p[7]", "claim_id": "287dfdfe-60ec-4cf7-b486-27cd6999c2ee", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "www.acciona.com", "evidence_id": "0c614c38-c603-4e76-a691-f5811144cdba", "valid_until": null, "assertion_id": "5ec70ac8-860f-4a7c-82c5-f82db19392dc", "temporal_expression": "", "extraction_confidence": 0.9}, "name": {"value": "Casablanca desalination plant", "rights": "facts_only", "source": {"url": "https://www.acciona.com/updates/news/acciona-signs-financing-casablanca-desalination-plant", "name": "www.acciona.com", "origin": "live", "checksum": "f3245d6894746b59ef3dd281bd4f4ddfb352a0ebdbb95ae2556145a68c35644f", "observed_at": "2026-10-17T17:21:29.614493+00:00", "revision_id": "756c9f63-6c3b-48b9-9559-a883bac4b1eb", "published_at": null}, "locator": "/html/head/title", "claim_id": "8e100ac4-7267-45dd-b70e-1680b25ffd8c", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.acciona.com", "evidence_id": "a90e3ac4-397e-4c52-bb7b-98982f49ed7a", "valid_until": null, "assertion_id": "7588efc5-92f9-4c7c-9c69-5b2b98a20a57", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "Planned reverse-osmosis plant with capacity of 300 million m\u00b3 per year: 250 million m\u00b3 of drinking water and up to 50 million m\u00b3 for potential regional agricultural use. The article says it will be powered entirely by renewable energy from the 360 MW Bir Anzarane wind farm, which will dedicate 47% of its output to the plant; stated supply is for 7.5 million people.", "rights": "facts_only", "source": {"url": "https://www.acciona.com/updates/news/acciona-signs-financing-casablanca-desalination-plant", "name": "www.acciona.com", "origin": "live", "checksum": "f3245d6894746b59ef3dd281bd4f4ddfb352a0ebdbb95ae2556145a68c35644f", "observed_at": "2026-10-17T17:21:29.614493+00:00", "revision_id": "756c9f63-6c3b-48b9-9559-a883bac4b1eb", "published_at": null}, "locator": "/html/body/div/div/main/div/div[1]/div[1]/a-mo-wysiwyg/div/div[1]/div/ul/li", "claim_id": "72db80f0-2479-46a7-94f4-a5fa59d86372", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "www.acciona.com", "evidence_id": "6a24cab4-fe52-4910-a88c-6dc97c796f9a", "valid_until": null, "assertion_id": "6c9a0f3a-3213-45c9-9f92-85bc1c9b4135", "temporal_expression": "", "extraction_confidence": 0.9}, "sector": {"value": "Water desalination.", "rights": "facts_only", "source": {"url": "https://www.acciona.com/updates/news/acciona-signs-financing-casablanca-desalination-plant", "name": "www.acciona.com", "origin": "live", "checksum": "f3245d6894746b59ef3dd281bd4f4ddfb352a0ebdbb95ae2556145a68c35644f", "observed_at": "2026-10-17T17:21:29.614493+00:00", "revision_id": "756c9f63-6c3b-48b9-9559-a883bac4b1eb", "published_at": null}, "locator": "/html/body/div/div/main/div/div[1]/a-pa-path/a-pa-label/a-label[1]/text-position:9", "claim_id": "62ab7214-ef94-4362-b03a-f5b9126326ed", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.acciona.com", "evidence_id": "314ae41e-391f-4a85-8f82-e637e69e5a7d", "valid_until": null, "assertion_id": "c6a3377c-dfb5-4140-8169-28ab0b6d4876", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Sidi Rahal, in the Greater Casablanca area, Morocco.", "rights": "facts_only", "source": {"url": "https://www.acciona.com/updates/news/acciona-signs-financing-casablanca-desalination-plant", "name": "www.acciona.com", "origin": "live", "checksum": "f3245d6894746b59ef3dd281bd4f4ddfb352a0ebdbb95ae2556145a68c35644f", "observed_at": "2026-10-17T17:21:29.614493+00:00", "revision_id": "756c9f63-6c3b-48b9-9559-a883bac4b1eb", "published_at": null}, "locator": "/html/body/div/div/main/div/div[1]/div[1]/a-mo-wysiwyg/div/div[2]/p[3]", "claim_id": "5bd83ffc-21ad-4145-8ea2-ccaac0392c4a", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.acciona.com", "evidence_id": "6bf4e53d-6c42-4084-a55a-f207597b28a0", "valid_until": null, "assertion_id": "74c79f23-1821-472b-8990-455240c9f0a5", "temporal_expression": "", "extraction_confidence": 0.9}, "operator": {"value": "ACCIONA is to operate and maintain the plant for 27 years.", "rights": "facts_only", "source": {"url": "https://www.acciona.com/updates/news/acciona-signs-financing-casablanca-desalination-plant", "name": "www.acciona.com", "origin": "live", "checksum": "f3245d6894746b59ef3dd281bd4f4ddfb352a0ebdbb95ae2556145a68c35644f", "observed_at": "2026-10-17T17:21:29.614493+00:00", "revision_id": "756c9f63-6c3b-48b9-9559-a883bac4b1eb", "published_at": null}, "locator": "/html/body/div/div/main/div/div[1]/div[1]/a-mo-wysiwyg/div/div[2]/p[2]", "claim_id": "097fa73d-3267-418a-9e7d-74471a0fe391", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "www.acciona.com", "evidence_id": "01cbc78b-4862-4582-bbbe-34d49c8ae3c8", "valid_until": null, "assertion_id": "7f55a1e6-c05b-4ce0-9c1a-214b106f85c6", "temporal_expression": "", "extraction_confidence": 0.9}, "contractor": {"value": "ACCIONA is to be responsible for construction.", "rights": "facts_only", "source": {"url": "https://www.acciona.com/updates/news/acciona-signs-financing-casablanca-desalination-plant", "name": "www.acciona.com", "origin": "live", "checksum": "f3245d6894746b59ef3dd281bd4f4ddfb352a0ebdbb95ae2556145a68c35644f", "observed_at": "2026-10-17T17:21:29.614493+00:00", "revision_id": "756c9f63-6c3b-48b9-9559-a883bac4b1eb", "published_at": null}, "locator": "/html/body/div/div/main/div/div[1]/div[1]/a-mo-wysiwyg/div/div[2]/p[2]", "claim_id": "dd817307-bf8e-4c61-a169-b09270bb078c", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "www.acciona.com", "evidence_id": "01cbc78b-4862-4582-bbbe-34d49c8ae3c8", "valid_until": null, "assertion_id": "d8760287-6e29-42ba-b23a-f63fd2c0320b", "temporal_expression": "", "extraction_confidence": 0.9}, "investment": {"value": "Total project investment reported as MA$6.5 billion (\u20ac613 million).", "rights": "facts_only", "source": {"url": "https://www.acciona.com/updates/news/acciona-signs-financing-casablanca-desalination-plant", "name": "www.acciona.com", "origin": "live", "checksum": "f3245d6894746b59ef3dd281bd4f4ddfb352a0ebdbb95ae2556145a68c35644f", "observed_at": "2026-10-17T17:21:29.614493+00:00", "revision_id": "756c9f63-6c3b-48b9-9559-a883bac4b1eb", "published_at": null}, "locator": "/html/body/div/div/main/div/div[1]/div[1]/a-mo-wysiwyg/div/div[2]/p[3]", "claim_id": "2e6e34c1-a82c-42b2-a830-c0b765dc2b80", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.acciona.com", "evidence_id": "6bf4e53d-6c42-4084-a55a-f207597b28a0", "valid_until": null, "assertion_id": "d9e37087-2427-429d-81bb-318a708d3aed", "temporal_expression": "", "extraction_confidence": 0.9}, "financing_stage": {"value": "An article dated 08 MAY 2025 reports that the Al Baidaa Desalination Company consortium announced signing the project financing. The financing is structured as 80% debt and 20% equity; participating institutions named are FIEM through ICO, Soci\u00e9t\u00e9 G\u00e9n\u00e9rale (with Cesce coverage via the Green Investment Policy), Attijariwafa Bank, Banque Centrale Populaire, Bank of Africa, Caixa and COFIDES. No financing amount is stated.", "rights": "facts_only", "source": {"url": "https://www.acciona.com/updates/news/acciona-signs-financing-casablanca-desalination-plant", "name": "www.acciona.com", "origin": "live", "checksum": "f3245d6894746b59ef3dd281bd4f4ddfb352a0ebdbb95ae2556145a68c35644f", "observed_at": "2026-10-17T17:21:29.614493+00:00", "revision_id": "756c9f63-6c3b-48b9-9559-a883bac4b1eb", "published_at": null}, "locator": "/html/body/div/div/main/div/div[1]/a-pa-path/a-pa-label/a-label[2]/text-position:11", "claim_id": "2e956ddd-0c11-4b82-b4f4-2f83d017a3e1", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.acciona.com", "evidence_id": "76a7bfdb-814e-497c-a1e9-c9c1be2582e0", "valid_until": null, "assertion_id": "a4896641-5f39-44af-8cf0-da1f4c760691", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "b2c2e7e6-cbb7-4859-b617-f2f6ccd6726b", "publication": {"local_only": false, "reviewed_at": "2026-11-05T15:09:42.392936+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "research-imported-enriched-public-v1", "template_version": "dossier-v1"}, "interpretation": {"version": "ordinary-source-qualifications-v1", "unknowns": [], "attribution": "ACCIONA reported that its Water-business revenues grew significantly in Q1 2026 compared with Q1 2025, driven in part by construction works at the Casablanca desalination plant. (reported). ACCIONA (externally supplied capture), evidence received 2026-11-05; https://www.acciona.com/content/dam/acciona-global/documentos/informes/q1-2026-trading-statement.pdf", "relationships": [], "coverage_limitations": ["Canonical facts retain their original source scope. Later source qualifications do not redefine the original asset or establish open supplier procurement."]}, "public_summary": "The Casablanca desalination plant is a planned reverse-osmosis water-desalination facility at Sidi Rahal, in the Greater Casablanca area of Morocco. ACCIONA\u2019s project announcement describes planned capacity of 300 million m\u00b3 per year: 250 million m\u00b3 of drinking water and up to 50 million m\u00b3 for potential regional agricultural use. It says the plant is to be powered entirely by renewable energy from the 360 MW Bir Anzarane wind farm, which will dedicate 47% of its output to the plant, and states that supply is intended for 7.5 million people. (ACCIONA, \u201cACCIONA signs financing for Casablanca desalination plant,\u201d project-description bullet and location paragraph.)\n\nThe announcement identifies ACCIONA as responsible for construction and planned operation and maintenance for 27 years; completion is scheduled for 2028. These are reported plans, not confirmation of completion or operation. (ACCIONA, same announcement, paragraphs on responsibilities and completion.)\n\nACCIONA reports total project investment of MA$6.5 billion (\u20ac613 million). Separately, its article dated 8 May 2025 reports that the Al Baidaa Desalination Company consortium announced signing project financing structured as 80% debt and 20% equity. The named institutions are FIEM through ICO, Soci\u00e9t\u00e9 G\u00e9n\u00e9rale (with Cesce coverage via the Green Investment Policy), Attijariwafa Bank, Banque Centrale Populaire, Bank of Africa, Caixa and COFIDES; the article does not state a financing amount. (ACCIONA, same announcement, investment paragraph and financing report.)\n\nACCIONA\u2019s Q1 2026 trading statement reports that construction works at Casablanca were one driver of growth in Water-business revenues compared with Q1 2025. This is reported activity, not a measure of the plant\u2019s physical progress. (ACCIONA, Q1 2026 trading statement, p. 14.)\n\nReading-scope note: The Q1 2026 statement was inspected on page 14 of 26 only. The other pages and graphical content were not interpreted, and the whole document was not reviewed. (ACCIONA, Q1 2026 trading statement, p. 14.)", "schema_version": "1.0", "public_unknowns": ["The Q1 2026 statement does not establish current physical progress, marine handover, commissioning or actual water output; it reports construction works without plant-level progress or output measures. (ACCIONA, Q1 2026 trading statement, p. 14.)", "The cited project announcement and inspected Q1 statement do not establish an open procurement package or a supplier buying window. Neither is inferred from the announced financing, planned completion date or reported construction activity. (ACCIONA, project announcement; Q1 2026 trading statement, p. 14.)", "The 2028 completion date is a reported plan; the cited Q1 statement does not establish a later or binding completion schedule. (ACCIONA, project announcement, completion paragraph; Q1 2026 trading statement, p. 14.)", "The Q1 2026 statement\u2019s unselected pages were not reviewed, so this review cannot establish whether they address these project-status or procurement questions. (ACCIONA, Q1 2026 trading statement, p. 14.)"], "evidence_observed_at": "2026-11-05T15:03:10.077079+00:00", "knowledge_reviewed_at": "2026-11-05T15:09:42.392936+00:00", "decisive_evidence_observed_at": "2026-10-17T17:21:29.614493+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Casablanca desalination plant", "original_project_title": "Casablanca desalination plant", "canonical_url": "https://capexcue.com/projects/casablanca-desalination-plant-85604add-d94/", "release": {"id": "e7b80188-5fee-4bdc-adf7-3d714e5443af", "number": 2, "published_at": "2026-11-05T15:09:42.392936+00:00"}, "release_reference": "release 2 (e7b80188-5fee-4bdc-adf7-3d714e5443af)", "current_dossier_url": "https://capexcue.com/projects/casablanca-desalination-plant-85604add-d94/", "citation": "CapexCue \u2014 Casablanca desalination plant \u2014 dossier released 2026-11-05T15:09:42.392936+00:00, release 2 (e7b80188-5fee-4bdc-adf7-3d714e5443af) \u2014 https://capexcue.com/projects/casablanca-desalination-plant-85604add-d94/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [{"title": "Project \u00b7 Completion expected", "event_time": "2028", "precision": "year", "status": "Expected", "modality": "planned", "elapsed_plan": false, "corroboration": "uncorroborated", "limitations": ["This source report does not establish current progress."], "sources": [{"name": "www.acciona.com", "url": "https://www.acciona.com/updates/news/acciona-signs-financing-casablanca-desalination-plant", "published_at": null, "observed_at": "2026-10-17T17:21:29.614493+00:00", "revision_id": "756c9f63-6c3b-48b9-9559-a883bac4b1eb", "checksum": "f3245d6894746b59ef3dd281bd4f4ddfb352a0ebdbb95ae2556145a68c35644f"}], "reference": "released-statement:date:0:33:completion_expected", "provenance": {"kind": "released_statement", "rule": "completion_expected-v1", "predicate": "date", "start": 0, "end": 33, "statement": "Scheduled for completion in 2028.", "modality": "planned", "sources": [{"url": "https://www.acciona.com/updates/news/acciona-signs-financing-casablanca-desalination-plant", "name": "www.acciona.com", "origin": "live", "checksum": "f3245d6894746b59ef3dd281bd4f4ddfb352a0ebdbb95ae2556145a68c35644f", "observed_at": "2026-10-17T17:21:29.614493+00:00", "revision_id": "756c9f63-6c3b-48b9-9559-a883bac4b1eb", "published_at": null}], "qualifications": {"attribution": "www.acciona.com"}}}], "project_category": {"basis": "metadata_assessment", "value": "water_environment", "support": {"end": 19, "start": 0, "sources": [{"url": "https://www.acciona.com/updates/news/acciona-signs-financing-casablanca-desalination-plant", "name": "www.acciona.com", "origin": "live", "checksum": "f3245d6894746b59ef3dd281bd4f4ddfb352a0ebdbb95ae2556145a68c35644f", "observed_at": "2026-10-17T17:21:29.614493+00:00", "revision_id": "756c9f63-6c3b-48b9-9559-a883bac4b1eb", "published_at": null}], "modality": "reported", "predicate": "sector", "raw_value": "Water desalination.", "statement": "Water desalination.", "qualifications": {"attribution": "www.acciona.com"}}, "label": "Water and environment", "icon": "water"}, "project_metadata": {"version": "released-metadata-v2", "category": {"basis": "metadata_assessment", "value": "water_environment", "support": {"end": 19, "start": 0, "sources": [{"url": "https://www.acciona.com/updates/news/acciona-signs-financing-casablanca-desalination-plant", "name": "www.acciona.com", "origin": "live", "checksum": "f3245d6894746b59ef3dd281bd4f4ddfb352a0ebdbb95ae2556145a68c35644f", "observed_at": "2026-10-17T17:21:29.614493+00:00", "revision_id": "756c9f63-6c3b-48b9-9559-a883bac4b1eb", "published_at": null}], "modality": "reported", "predicate": "sector", "raw_value": "Water desalination.", "statement": "Water desalination.", "qualifications": {"attribution": "www.acciona.com"}}}, "input_hash": "c81b0d03e1661384f3dc318d4c27854b05820ed43e942cb57919b52e73a7176d", "release_id": "e7b80188-5fee-4bdc-adf7-3d714e5443af", "type_codes": ["desalination"], "field_states": {"type": {"state": "accepted", "reason": "supported_physical_components"}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "supported_physical_country"}, "category": {"state": "accepted", "reason": "supported_primary_category"}}, "region_codes": ["middle_east_north_africa"], "release_hash": "4d7feaa687b24901d35f0a40bf0a8ae7000ebd7ae9eacbc2c33246614e8faadc", "assessment_id": "79d821d4-a8fd-419f-aa9f-2b650e3bc131", "country_codes": ["MA"], "assessment_hash": "696de99e7af2112a0d6f6857e2298a76e1adbd730ff08aeea3cdba36b227a40b", "country_label": "Morocco", "region_label": "Middle East North Africa", "type_labels": ["Desalination"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}