{"name": "Nairiyah 1 IPP", "slug": "nairiyah-1-ipp-6564c918-a56", "as_of": "2026-10-18T07:38:12.661456+00:00", "depth": "basic", "facts": {"date": {"value": "Commercial operations date listed as Q2 2028.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/nairiyah-1-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "bc680ec3887f33bd19253c5f982c77beb3959b0102f6d0f33ec062389409bfc0", "observed_at": "2026-10-18T07:27:06.656709+00:00", "revision_id": "d194398f-2e87-4446-acc6-a27ed723d955", "published_at": null}, "locator": "/html/head/main/div/section[4]/div/ul/li[8]", "claim_id": "0e0f6dad-f6e4-42af-bd1e-6bd3d13eec13", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "a2cbc6f4-5772-4584-b395-52bd11836abb", "valid_until": null, "assertion_id": "8f9780e5-5ce9-42b4-b1d9-3ca3c7a6c6d8", "temporal_expression": "", "extraction_confidence": 0.9}, "name": {"value": "Nairiyah 1 IPP", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/nairiyah-1-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "bc680ec3887f33bd19253c5f982c77beb3959b0102f6d0f33ec062389409bfc0", "observed_at": "2026-10-18T07:27:06.656709+00:00", "revision_id": "d194398f-2e87-4446-acc6-a27ed723d955", "published_at": null}, "locator": "/html/head/main/div/section[1]/div[1]/div/div/div/div/div[1]/h3", "claim_id": "5d484cb2-8544-41b7-9d3f-ba7355ceb6ea", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "1a4f4410-38ea-4037-aba8-f8784f4fbabb", "valid_until": null, "assertion_id": "b34030bb-55f7-4d19-b18c-6058e6acec10", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "1,800 MW Combined Cycle Gas Turbine (CCGT) independent power project and plant.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/nairiyah-1-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "bc680ec3887f33bd19253c5f982c77beb3959b0102f6d0f33ec062389409bfc0", "observed_at": "2026-10-18T07:27:06.656709+00:00", "revision_id": "d194398f-2e87-4446-acc6-a27ed723d955", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p[1]", "claim_id": "997d712d-9235-491d-940e-126a12b05cda", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "16e70083-e348-404d-b38b-b19069d5c629", "valid_until": null, "assertion_id": "c06a2e2f-809e-4db1-bbec-b31c12682d3c", "temporal_expression": "", "extraction_confidence": 0.9}, "sector": {"value": "Power generation.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/nairiyah-1-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "bc680ec3887f33bd19253c5f982c77beb3959b0102f6d0f33ec062389409bfc0", "observed_at": "2026-10-18T07:27:06.656709+00:00", "revision_id": "d194398f-2e87-4446-acc6-a27ed723d955", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p[1]", "claim_id": "df9ec011-3ca3-45ef-83f1-50a8702622e6", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "16e70083-e348-404d-b38b-b19069d5c629", "valid_until": null, "assertion_id": "46099227-641e-4255-a97f-87b026830566", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Eastern region/province, Saudi Arabia.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/nairiyah-1-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "bc680ec3887f33bd19253c5f982c77beb3959b0102f6d0f33ec062389409bfc0", "observed_at": "2026-10-18T07:27:06.656709+00:00", "revision_id": "d194398f-2e87-4446-acc6-a27ed723d955", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p[1]", "claim_id": "737ce24b-6b7e-4127-8609-8073f5d5d354", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "16e70083-e348-404d-b38b-b19069d5c629", "valid_until": null, "assertion_id": "9e430259-b4ac-458b-8c02-4f658e2f5ceb", "temporal_expression": "", "extraction_confidence": 0.9}, "developer": {"value": "ACWA Power.", "rights": "facts_only", "source": {"url": "https://acwapower.com/en/what-we-do/projects/nairiyah-1-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "bc680ec3887f33bd19253c5f982c77beb3959b0102f6d0f33ec062389409bfc0", "observed_at": "2026-10-18T07:27:06.656709+00:00", "revision_id": "d194398f-2e87-4446-acc6-a27ed723d955", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p[1]", "claim_id": "08bc356b-4242-467b-b960-88b16c41937c", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "acwapower.com", "evidence_id": "16e70083-e348-404d-b38b-b19069d5c629", "valid_until": null, "assertion_id": "0955198f-f484-4cce-89b1-bac26b7cc23b", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "b3a825e6-beab-4278-855f-39817bd9a597", "publication": {"local_only": false, "reviewed_at": "2026-10-18T07:39:24.284199+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "Nairiyah 1 IPP is described as a 1,800 MW CCGT power project in Saudi Arabia\u2019s Eastern region/province, developed by ACWA Power. The page lists Q2 2028 as its planned commercial operations date.", "schema_version": "1.0", "public_unknowns": ["The supplied source snapshot was observed on 2026-10-18; its publication date is not provided. It does not state current procurement availability, open packages or project budget."], "evidence_observed_at": "2026-10-18T07:27:06.656709+00:00", "knowledge_reviewed_at": "2026-10-18T07:38:13.271140+00:00", "decisive_evidence_observed_at": "2026-10-18T07:27:06.656709+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Nairiyah 1 IPP", "original_project_title": "Nairiyah 1 IPP", "canonical_url": "https://capexcue.com/projects/nairiyah-1-ipp-6564c918-a56/", "release": {"id": "ca72ff0d-e349-45fa-8a6f-d16269adc3dc", "number": 1, "published_at": "2026-10-18T07:39:38.062062+00:00"}, "release_reference": "release 1 (ca72ff0d-e349-45fa-8a6f-d16269adc3dc)", "current_dossier_url": "https://capexcue.com/projects/nairiyah-1-ipp-6564c918-a56/", "citation": "CapexCue \u2014 Nairiyah 1 IPP \u2014 dossier released 2026-10-18T07:39:38.062062+00:00, release 1 (ca72ff0d-e349-45fa-8a6f-d16269adc3dc) \u2014 https://capexcue.com/projects/nairiyah-1-ipp-6564c918-a56/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 79, "start": 0, "sources": [{"url": "https://acwapower.com/en/what-we-do/projects/nairiyah-1-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "bc680ec3887f33bd19253c5f982c77beb3959b0102f6d0f33ec062389409bfc0", "observed_at": "2026-10-18T07:27:06.656709+00:00", "revision_id": "d194398f-2e87-4446-acc6-a27ed723d955", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "1,800 MW Combined Cycle Gas Turbine (CCGT) independent power project and plant.", "statement": "1,800 MW Combined Cycle Gas Turbine (CCGT) independent power project and plant.", "qualifications": {"attribution": "acwapower.com"}}, "label": "Energy", "icon": "energy"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "codex_retained_dossier_curation", "value": "energy", "support": {"end": 79, "start": 0, "sources": [{"url": "https://acwapower.com/en/what-we-do/projects/nairiyah-1-ipp/", "name": "acwapower.com", "origin": "live", "checksum": "bc680ec3887f33bd19253c5f982c77beb3959b0102f6d0f33ec062389409bfc0", "observed_at": "2026-10-18T07:27:06.656709+00:00", "revision_id": "d194398f-2e87-4446-acc6-a27ed723d955", "published_at": null}], "modality": "reported", "predicate": "scope", "raw_value": "1,800 MW Combined Cycle Gas Turbine (CCGT) independent power project and plant.", "statement": "1,800 MW Combined Cycle Gas Turbine (CCGT) independent power project and plant.", "qualifications": {"attribution": "acwapower.com"}}}, "input_hash": "ed77fc2a592d9fe007819e17d890e70fa27f356fb436ecad2211f54648b9da5b", "release_id": "ca72ff0d-e349-45fa-8a6f-d16269adc3dc", "type_codes": [], "field_states": {"type": {"state": "unknown_after_assessment", "reason": "Saudi combined-cycle gas power project; no registered gas-fired generation type."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "supported_physical_country"}, "category": {"state": "accepted", "reason": "Saudi combined-cycle gas power project; no registered gas-fired generation type."}}, "region_codes": ["middle_east_north_africa"], "release_hash": "660fed3fb5758ce4a2e70b23cf9a91137714665417f5cc8414dfb3383247cbc8", "assessment_id": "88b68454-dc39-4e9f-a09c-5a703d626a16", "country_codes": ["SA"], "assessment_hash": "f231e9735c82a4cdddde7d810e14550494d6271dafb3c3d94f382ef44d76e143", "country_label": "Saudi Arabia", "region_label": "Middle East North Africa", "type_labels": []}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}