# Kilokari Battery Energy Storage System; the article also refers to the site as Kilokri.

Publisher: CapexCue
Canonical dossier: <https://capexcue.com/projects/kilokari-battery-energy-storage-system-the-article-also-refers-to-the-site-as-kilokri-a59b37b0-973/>
Dossier reference: release 1 (9718d339-a456-4ac5-9788-2250531930d5)

Released project intelligence

Oldest supporting observation: 2026-10-15T14:23:48.917696+00:00
Dossier released: 2026-10-15T14:40:47.873425+00:00
Source report dates and capture dates are listed per fact below; neither establishes an event date.

## Project summary

The Kilokari Battery Energy Storage System, also called Kilokri in the article, is located in New Delhi, India. The source describes a commercial, standalone, utility-scale BESS and reports it as India’s first of its kind and the first in South Asia. Key Facts gives the duration as April 2023–ongoing. Separately, the article says Global Energy Alliance and utility BSES Rajdhani Power Limited took a major step toward the BESS goal in May 2025; it does not call this the commissioning date. The page header displays 13.04.2026.

## Evidence limits and unknowns

- The source does not state the system’s capacity, cost, detailed equipment specifications, owner, operator, contractor, or current procurement status.

Current purchasing availability: unknown.
Source-dated plans do not establish current progress or available supplier packages.

## Project metadata

Country: India
Region: Asia
Physical assets: Battery Storage
Derived from the exact released evidence; unresolved fields remain unclassified.

## Project category

Energy
Derived from the reviewed scope statement; delivery stage remains unclassified.
Commercial, standalone, utility-scale battery energy storage system (BESS); the source describes it as India’s first ever and the first of its kind in South Asia.
Source: energyalliance.org — https://energyalliance.org/case-study-reliable-power-for-a-modern-economy/ | published unknown | observed 2026-10-15T14:23:48.917696+00:00

Project overview
Oldest decisive evidence: 2026-10-15T14:23:48.917696+00:00
Newest evidence: 2026-10-15T14:23:48.917696+00:00
Knowledge reviewed: 2026-10-15T14:39:59.676786+00:00
Publication reviewed: 2026-10-15T14:40:47.100430+00:00

## Date
Key Facts lists the project duration as April 2023–ongoing. The article says a major step toward realizing the BESS goal took place in May 2025; it does not identify that as a commissioning date. The page header displays 13.04.2026.
Status: reported
Attribution: energyalliance.org
Source: energyalliance.org — https://energyalliance.org/case-study-reliable-power-for-a-modern-economy/ | published unknown | observed 2026-10-15T14:23:48.917696+00:00

## Name
Kilokari Battery Energy Storage System; the article also refers to the site as Kilokri.
Status: reported
Attribution: energyalliance.org
Source: energyalliance.org — https://energyalliance.org/case-study-reliable-power-for-a-modern-economy/ | published unknown | observed 2026-10-15T14:23:48.917696+00:00

## Scope
Commercial, standalone, utility-scale battery energy storage system (BESS); the source describes it as India’s first ever and the first of its kind in South Asia.
Status: reported
Attribution: energyalliance.org
Source: energyalliance.org — https://energyalliance.org/case-study-reliable-power-for-a-modern-economy/ | published unknown | observed 2026-10-15T14:23:48.917696+00:00

## Location
New Delhi, India.
Status: reported
Attribution: energyalliance.org
Source: energyalliance.org — https://energyalliance.org/case-study-reliable-power-for-a-modern-economy/ | published unknown | observed 2026-10-15T14:23:48.917696+00:00


## Cite this dossier

CapexCue — Kilokari Battery Energy Storage System; the article also refers to the site as Kilokri. — dossier released 2026-10-15T14:40:47.873425+00:00, release 1 (9718d339-a456-4ac5-9788-2250531930d5) — https://capexcue.com/projects/kilokari-battery-energy-storage-system-the-article-also-refers-to-the-site-as-kilokri-a59b37b0-973/.

For current information and later dossier updates, visit <https://capexcue.com/projects/kilokari-battery-energy-storage-system-the-article-also-refers-to-the-site-as-kilokri-a59b37b0-973/>.
This file records the release identified above; the current dossier may change.