{"name": "Sumner Dam Spillway Bridge Realignment Project", "slug": "sumner-dam-spillway-bridge-realignment-project-b8973f986666fd8f", "as_of": "2026-10-01T22:18:52.131136+00:00", "depth": "basic", "facts": {"name": {"value": "Sumner Dam Spillway Bridge Realignment Project", "rights": "facts_only", "source": {"url": "https://www.usbr.gov/uc/progact/sumner/index.html", "name": "US Bureau of Reclamation screened government project narrative", "origin": "live", "checksum": "3a004200fc278d89b9120af570b7e75231f1e0c1d4d7b70c4f155e9d869fdd28", "observed_at": "2026-10-01T21:33:58.610454+00:00", "revision_id": "2c2f0c60-4f4f-4265-82fb-ffaceaa58b79", "published_at": null}, "locator": "/html/body/div/div[4]/div/div[2]/div[3]/ul/li[2]", "claim_id": "89feed93-bb0f-41f5-acd0-eae5fbefbfdb", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "US Bureau of Reclamation screened government project narrative", "evidence_id": "27e193f5-59b3-46fd-afbe-022b93ce1428", "valid_until": null, "assertion_id": "2269f98f-5b48-452b-9d62-d9585915b8d8", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "A proposal to construct a new bridge over the Pecos River just downstream of Sumner Dam and realign NM 203 traffic away from the dam crest and spillway bridge. The source says studies concluded that using the existing alignment for a new bridge was not feasible; it does not report construction of the proposed bridge.", "rights": "facts_only", "source": {"url": "https://www.usbr.gov/uc/progact/sumner/index.html", "name": "US Bureau of Reclamation screened government project narrative", "origin": "live", "checksum": "3a004200fc278d89b9120af570b7e75231f1e0c1d4d7b70c4f155e9d869fdd28", "observed_at": "2026-10-01T21:33:58.610454+00:00", "revision_id": "2c2f0c60-4f4f-4265-82fb-ffaceaa58b79", "published_at": null}, "locator": "/html/body/div/div[4]/div/div[2]/div[3]/ul/li[2]", "claim_id": "8a6a6f9c-4163-4741-a9af-6438decd5d01", "modality": "planned", "confidence": 0.9, "valid_from": null, "attribution": "US Bureau of Reclamation screened government project narrative", "evidence_id": "d153bf9a-83a5-49b6-9893-e6d958e60b61", "valid_until": null, "assertion_id": "00ace629-0123-4a36-a7cf-93614d7cc73c", "temporal_expression": "", "extraction_confidence": 0.9}, "activity": {"value": "The Federal Highway Administration, in coordination with Reclamation, secured a Federal Lands Transportation Program grant to develop a realignment. Reclamation reported working with project partners on design and seeking additional construction funding through the Bridge Investment Program.", "rights": "facts_only", "source": {"url": "https://www.usbr.gov/uc/progact/sumner/index.html", "name": "US Bureau of Reclamation screened government project narrative", "origin": "live", "checksum": "3a004200fc278d89b9120af570b7e75231f1e0c1d4d7b70c4f155e9d869fdd28", "observed_at": "2026-10-01T21:33:58.610454+00:00", "revision_id": "2c2f0c60-4f4f-4265-82fb-ffaceaa58b79", "published_at": null}, "locator": "/html/body/div/div[4]/div/div[2]/div[3]/ul/li[2]", "claim_id": "972b019e-d28c-459a-aae1-ef661db4d46b", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "US Bureau of Reclamation screened government project narrative", "evidence_id": "44760a2b-90cb-4fff-8dd0-c5dcb8a4745a", "valid_until": null, "assertion_id": "d7bda134-6f73-4831-b3cc-007b5abe66eb", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Over the Pecos River just downstream of Sumner Dam; the proposed realignment concerns NM 203.", "rights": "facts_only", "source": {"url": "https://www.usbr.gov/uc/progact/sumner/index.html", "name": "US Bureau of Reclamation screened government project narrative", "origin": "live", "checksum": "3a004200fc278d89b9120af570b7e75231f1e0c1d4d7b70c4f155e9d869fdd28", "observed_at": "2026-10-01T21:33:58.610454+00:00", "revision_id": "2c2f0c60-4f4f-4265-82fb-ffaceaa58b79", "published_at": null}, "locator": "/html/body/div/div[4]/div/div[2]/div[3]/ul/li[2]", "claim_id": "e2fd5cec-0c61-4a30-a116-8a39cb66f4a2", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "US Bureau of Reclamation screened government project narrative", "evidence_id": "bc437b1e-c5f8-44ab-9ae2-39ce6f1a6fe5", "valid_until": null, "assertion_id": "57d6d89e-fb0b-4bdb-bd2f-c364c5dc9aee", "temporal_expression": "", "extraction_confidence": 0.9}, "investment": {"value": "A Federal Lands Transportation Program grant was secured for developing the realignment. In January 2025, Bridge Investment Program funding for the project was not granted because of project ineligibility stemming from the extent of the realignment; the source says this made that funding unavailable.", "rights": "facts_only", "source": {"url": "https://www.usbr.gov/uc/progact/sumner/index.html", "name": "US Bureau of Reclamation screened government project narrative", "origin": "live", "checksum": "3a004200fc278d89b9120af570b7e75231f1e0c1d4d7b70c4f155e9d869fdd28", "observed_at": "2026-10-01T21:33:58.610454+00:00", "revision_id": "2c2f0c60-4f4f-4265-82fb-ffaceaa58b79", "published_at": null}, "locator": "/html/body/div/div[4]/div/div[2]/div[3]/ul/li[2]", "claim_id": "90aeb2a9-1739-4339-9672-d0c5425645ff", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "US Bureau of Reclamation screened government project narrative", "evidence_id": "8da94d87-98ea-4b39-8ba5-63623ec66f06", "valid_until": null, "assertion_id": "ed35c216-1185-4bed-b8f7-c8dc5035e2eb", "temporal_expression": "", "extraction_confidence": 0.9}, "next_milestone": {"value": "Commitment of alternative funding sources is the stated condition for the project to move beyond its reported pause.", "rights": "facts_only", "source": {"url": "https://www.usbr.gov/uc/progact/sumner/index.html", "name": "US Bureau of Reclamation screened government project narrative", "origin": "live", "checksum": "3a004200fc278d89b9120af570b7e75231f1e0c1d4d7b70c4f155e9d869fdd28", "observed_at": "2026-10-01T21:33:58.610454+00:00", "revision_id": "2c2f0c60-4f4f-4265-82fb-ffaceaa58b79", "published_at": null}, "locator": "/html/body/div/div[4]/div/div[2]/div[3]/ul/li[2]", "claim_id": "92d464cc-dd6c-4c2e-b9fc-e78a35e0a7b6", "modality": "unknown", "confidence": 0.9, "valid_from": null, "attribution": "US Bureau of Reclamation screened government project narrative", "evidence_id": "4e0cf2cd-7b3b-4580-8991-af4930a54f4d", "valid_until": null, "assertion_id": "91d9aab2-2456-469a-9ccd-155ec3d494d0", "temporal_expression": "", "extraction_confidence": 0.9}, "financing_stage": {"value": "The project was reported paused pending commitment of alternative funding sources, described as likely cost-shared. The source does not say the project was canceled.", "rights": "facts_only", "source": {"url": "https://www.usbr.gov/uc/progact/sumner/index.html", "name": "US Bureau of Reclamation screened government project narrative", "origin": "live", "checksum": "3a004200fc278d89b9120af570b7e75231f1e0c1d4d7b70c4f155e9d869fdd28", "observed_at": "2026-10-01T21:33:58.610454+00:00", "revision_id": "2c2f0c60-4f4f-4265-82fb-ffaceaa58b79", "published_at": null}, "locator": "/html/body/div/div[4]/div/div[2]/div[3]/ul/li[2]", "claim_id": "0e1907bd-0913-4124-bed5-6c787826ddb1", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "US Bureau of Reclamation screened government project narrative", "evidence_id": "937c3177-7a94-4023-a53b-c792c1066d8d", "valid_until": null, "assertion_id": "918163ce-8cb2-46a4-9d63-227130cad1ad", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "c2e1290e-959b-4541-b880-c71d839a3afd", "publication": {"local_only": false, "reviewed_at": "2026-10-15T16:05:12.046579+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "The Sumner Dam Spillway Bridge Realignment Project proposes a new bridge over the Pecos River downstream of Sumner Dam to reroute NM 203 traffic away from the dam crest and spillway bridge. This is distinct from the radial-gates replacement project. \n\nIn its March 2025 announcement, Reclamation reported that a Federal Lands Transportation Program grant had been secured for developing the realignment, but that Bridge Investment Program funding was not granted in January 2025. The announcement reported the project paused pending alternative funding, likely cost-shared. These are reported developments from that announcement, not a current status update.", "schema_version": "1.0", "public_unknowns": ["The March 2025 announcement does not establish whether alternative funding has since been committed or whether the project has resumed. It also does not identify a final design, construction contractor, or construction schedule."], "evidence_observed_at": "2026-10-01T21:33:58.610454+00:00", "knowledge_reviewed_at": "2026-10-15T16:05:12.046579+00:00", "decisive_evidence_observed_at": "2026-10-01T21:33:58.610454+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Sumner Dam Spillway Bridge Realignment Project", "original_project_title": "Sumner Dam Spillway Bridge Realignment Project", "canonical_url": "https://capexcue.com/projects/sumner-dam-spillway-bridge-realignment-project-b8973f986666fd8f/", "release": {"id": "99a28cec-9df9-4c14-a37a-b6217fb061ff", "number": 1, "published_at": "2026-10-15T16:05:12.361946+00:00"}, "release_reference": "release 1 (99a28cec-9df9-4c14-a37a-b6217fb061ff)", "current_dossier_url": "https://capexcue.com/projects/sumner-dam-spillway-bridge-realignment-project-b8973f986666fd8f/", "citation": "CapexCue \u2014 Sumner Dam Spillway Bridge Realignment Project \u2014 dossier released 2026-10-15T16:05:12.361946+00:00, release 1 (99a28cec-9df9-4c14-a37a-b6217fb061ff) \u2014 https://capexcue.com/projects/sumner-dam-spillway-bridge-realignment-project-b8973f986666fd8f/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "codex_retained_dossier_curation", "value": "transport_logistics", "support": {"end": 318, "start": 0, "sources": [{"url": "https://www.usbr.gov/uc/progact/sumner/index.html", "name": "US Bureau of Reclamation screened government project narrative", "origin": "live", "checksum": "3a004200fc278d89b9120af570b7e75231f1e0c1d4d7b70c4f155e9d869fdd28", "observed_at": "2026-10-01T21:33:58.610454+00:00", "revision_id": "2c2f0c60-4f4f-4265-82fb-ffaceaa58b79", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "A proposal to construct a new bridge over the Pecos River just downstream of Sumner Dam and realign NM 203 traffic away from the dam crest and spillway bridge. The source says studies concluded that using the existing alignment for a new bridge was not feasible; it does not report construction of the proposed bridge.", "statement": "A proposal to construct a new bridge over the Pecos River just downstream of Sumner Dam and realign NM 203 traffic away from the dam crest and spillway bridge. The source says studies concluded that using the existing alignment for a new bridge was not feasible; it does not report construction of the proposed bridge.", "qualifications": {"attribution": "US Bureau of Reclamation screened government project narrative"}}, "label": "Transport and logistics", "icon": "bridge"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "codex_retained_dossier_curation", "value": "transport_logistics", "support": {"end": 318, "start": 0, "sources": [{"url": "https://www.usbr.gov/uc/progact/sumner/index.html", "name": "US Bureau of Reclamation screened government project narrative", "origin": "live", "checksum": "3a004200fc278d89b9120af570b7e75231f1e0c1d4d7b70c4f155e9d869fdd28", "observed_at": "2026-10-01T21:33:58.610454+00:00", "revision_id": "2c2f0c60-4f4f-4265-82fb-ffaceaa58b79", "published_at": null}], "modality": "planned", "predicate": "scope", "raw_value": "A proposal to construct a new bridge over the Pecos River just downstream of Sumner Dam and realign NM 203 traffic away from the dam crest and spillway bridge. The source says studies concluded that using the existing alignment for a new bridge was not feasible; it does not report construction of the proposed bridge.", "statement": "A proposal to construct a new bridge over the Pecos River just downstream of Sumner Dam and realign NM 203 traffic away from the dam crest and spillway bridge. The source says studies concluded that using the existing alignment for a new bridge was not feasible; it does not report construction of the proposed bridge.", "qualifications": {"attribution": "US Bureau of Reclamation screened government project narrative"}}}, "input_hash": "ed05d8eda991009f0a81584220a7188adeb9f3d511d7afc3836f19b9052055da", "release_id": "99a28cec-9df9-4c14-a37a-b6217fb061ff", "type_codes": ["road"], "field_states": {"type": {"state": "accepted", "reason": "Sumner Dam, the Pecos River and NM203 identify New Mexico, United States; proposal is a road bridge/realignment, not completed dam works."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "Sumner Dam, the Pecos River and NM203 identify New Mexico, United States; proposal is a road bridge/realignment, not completed dam works."}, "category": {"state": "accepted", "reason": "Sumner Dam, the Pecos River and NM203 identify New Mexico, United States; proposal is a road bridge/realignment, not completed dam works."}}, "region_codes": ["north_america"], "release_hash": "7f585d6507745651b52161cc3a241e48ca2f31513ea7ce3b2db2366a3dbf47e7", "assessment_id": "1f342215-e8ee-4703-9294-0f4c7cb65b04", "country_codes": ["US"], "assessment_hash": "3d368cf2732220fe3dad0b265ad4536d54e73b05e21da2e9547110b8a02a47db", "country_label": "United States", "region_label": "North America", "type_labels": ["Road"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}