{"name": "Al Kahfah PV IPP; also described as the Al Kahfah 1425 MW PV project.", "slug": "al-kahfah-pv-ipp-also-described-as-the-al-kahfah-1425-mw-pv-project-306f62dd-75e", "as_of": "2026-10-17T20:12:23.635092+00:00", "depth": "basic", "facts": {"date": {"value": "Commercial operations date is listed as 30 November 2025; the source does not explicitly confirm whether commercial operation was achieved.", "rights": "facts_only", "source": {"url": "https://www.acwapower.com/en/what-we-do/projects/al-kahfah-pv/", "name": "www.acwapower.com", "origin": "live", "checksum": "9ac7decc26218e13579b68636b8537101b87a78199994a26e45fb656604e8947", "observed_at": "2026-10-17T20:08:45.978824+00:00", "revision_id": "ad699485-ba54-4d27-9191-dffb34af07e7", "published_at": null}, "locator": "/html/head/main/div/section[4]/div/ul/li[6]", "claim_id": "88fe8547-1497-4554-8cbe-a0444758a9eb", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.acwapower.com", "evidence_id": "96df50a6-f2be-4d98-b150-a14077ea55b7", "valid_until": null, "assertion_id": "478ed07c-abd9-4f80-95ea-82f4377558d2", "temporal_expression": "", "extraction_confidence": 0.9}, "name": {"value": "Al Kahfah PV IPP; also described as the Al Kahfah 1425 MW PV project.", "rights": "facts_only", "source": {"url": "https://www.acwapower.com/en/what-we-do/projects/al-kahfah-pv/", "name": "www.acwapower.com", "origin": "live", "checksum": "9ac7decc26218e13579b68636b8537101b87a78199994a26e45fb656604e8947", "observed_at": "2026-10-17T20:08:45.978824+00:00", "revision_id": "ad699485-ba54-4d27-9191-dffb34af07e7", "published_at": null}, "locator": "/html/head/main/div/section[1]/div[1]/div/div/div/div/div[1]/h3", "claim_id": "f9c24251-4b21-42c7-aa11-90a5b23237c0", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.acwapower.com", "evidence_id": "d95f0a59-db76-44ab-bbfc-158fcac2341f", "valid_until": null, "assertion_id": "d4e8b986-a73c-4653-990f-d5e34f55986f", "temporal_expression": "", "extraction_confidence": 0.9}, "scope": {"value": "A 1,425 MW solar PV independent power project using bifacial panels with single-axis tracking.", "rights": "facts_only", "source": {"url": "https://www.acwapower.com/en/what-we-do/projects/al-kahfah-pv/", "name": "www.acwapower.com", "origin": "live", "checksum": "9ac7decc26218e13579b68636b8537101b87a78199994a26e45fb656604e8947", "observed_at": "2026-10-17T20:08:45.978824+00:00", "revision_id": "ad699485-ba54-4d27-9191-dffb34af07e7", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p", "claim_id": "a9d811d6-fc59-4724-99c6-6d6cc1cff9e5", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.acwapower.com", "evidence_id": "a966efb3-2c3e-432c-ae15-e48ccc985c31", "valid_until": null, "assertion_id": "f3a6f1db-5dd0-44ae-9877-549456cb0fb7", "temporal_expression": "", "extraction_confidence": 0.9}, "sector": {"value": "Renewable energy; solar PV power generation.", "rights": "facts_only", "source": {"url": "https://www.acwapower.com/en/what-we-do/projects/al-kahfah-pv/", "name": "www.acwapower.com", "origin": "live", "checksum": "9ac7decc26218e13579b68636b8537101b87a78199994a26e45fb656604e8947", "observed_at": "2026-10-17T20:08:45.978824+00:00", "revision_id": "ad699485-ba54-4d27-9191-dffb34af07e7", "published_at": null}, "locator": "/html/head/main/div/section[4]/div/ul/li[4]", "claim_id": "be1a9184-32c4-4728-9ef9-4fbc909253d6", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.acwapower.com", "evidence_id": "66fc3985-16ee-4cbc-81f5-470e4206ebfb", "valid_until": null, "assertion_id": "f187ab91-a03e-4986-943a-32a1d9ac144b", "temporal_expression": "", "extraction_confidence": 0.9}, "delivery": {"value": "Build, Own, Operate (BOO) model; ACWA Power is responsible for construction and operation. The source also reports a 35-year Power Purchase Agreement signed with SPPC.", "rights": "facts_only", "source": {"url": "https://www.acwapower.com/en/what-we-do/projects/al-kahfah-pv/", "name": "www.acwapower.com", "origin": "live", "checksum": "9ac7decc26218e13579b68636b8537101b87a78199994a26e45fb656604e8947", "observed_at": "2026-10-17T20:08:45.978824+00:00", "revision_id": "ad699485-ba54-4d27-9191-dffb34af07e7", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p", "claim_id": "9117aa09-ac43-4b8b-b2bd-c6eafc3470f4", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.acwapower.com", "evidence_id": "a966efb3-2c3e-432c-ae15-e48ccc985c31", "valid_until": null, "assertion_id": "3ce70889-8e9b-47ad-960f-2b1459c2c533", "temporal_expression": "", "extraction_confidence": 0.9}, "location": {"value": "Al Kahfah, Central Region, Saudi Arabia (KSA).", "rights": "facts_only", "source": {"url": "https://www.acwapower.com/en/what-we-do/projects/al-kahfah-pv/", "name": "www.acwapower.com", "origin": "live", "checksum": "9ac7decc26218e13579b68636b8537101b87a78199994a26e45fb656604e8947", "observed_at": "2026-10-17T20:08:45.978824+00:00", "revision_id": "ad699485-ba54-4d27-9191-dffb34af07e7", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p", "claim_id": "ee6c3d7b-1c12-439b-9de1-e484b897aab2", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.acwapower.com", "evidence_id": "a966efb3-2c3e-432c-ae15-e48ccc985c31", "valid_until": null, "assertion_id": "7aa94746-f710-4e3c-92bd-68aae3297bf5", "temporal_expression": "", "extraction_confidence": 0.9}, "developer": {"value": "ACWA Power is developing the project.", "rights": "facts_only", "source": {"url": "https://www.acwapower.com/en/what-we-do/projects/al-kahfah-pv/", "name": "www.acwapower.com", "origin": "live", "checksum": "9ac7decc26218e13579b68636b8537101b87a78199994a26e45fb656604e8947", "observed_at": "2026-10-17T20:08:45.978824+00:00", "revision_id": "ad699485-ba54-4d27-9191-dffb34af07e7", "published_at": null}, "locator": "/html/head/main/div/section[2]/div/p", "claim_id": "1833d4b7-a8fb-4de0-a365-01bb1bb65f4f", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.acwapower.com", "evidence_id": "a966efb3-2c3e-432c-ae15-e48ccc985c31", "valid_until": null, "assertion_id": "8f4a7330-7129-46f2-a2f6-6a10a1c7ff8e", "temporal_expression": "", "extraction_confidence": 0.9}, "contractor": {"value": "The engineering, procurement and construction company is listed as Larsen & Toubro Limited L&T FZE.", "rights": "facts_only", "source": {"url": "https://www.acwapower.com/en/what-we-do/projects/al-kahfah-pv/", "name": "www.acwapower.com", "origin": "live", "checksum": "9ac7decc26218e13579b68636b8537101b87a78199994a26e45fb656604e8947", "observed_at": "2026-10-17T20:08:45.978824+00:00", "revision_id": "ad699485-ba54-4d27-9191-dffb34af07e7", "published_at": null}, "locator": "/html/head/main/div/section[4]/div/ul/li[13]", "claim_id": "95253e44-f5c2-4ec0-a083-d8913e9fae50", "modality": "reported", "confidence": 0.9, "valid_from": null, "attribution": "www.acwapower.com", "evidence_id": "3152c38f-623f-498f-94a8-fa7b3da486ef", "valid_until": null, "assertion_id": "1c96e837-0d14-4898-834b-396fca61d9b4", "temporal_expression": "", "extraction_confidence": 0.9}}, "origin": "snapshot", "revision": 1, "timeline": [], "is_sample": false, "project_id": "c3306a8c-252d-4cc9-b332-c6cda257c327", "publication": {"local_only": false, "reviewed_at": "2026-10-17T20:13:42.468291+00:00", "indexability": "noindex", "buying_window": "unknown", "policy_version": "accepted-destination-v1", "template_version": "dossier-v1"}, "public_summary": "Al Kahfah PV IPP is a reported 1,425 MW solar PV project in Al Kahfah, Central Region, Saudi Arabia, specified with bifacial panels and single-axis tracking. ACWA Power is reported as developer and responsible for construction and operation under a BOO model; the page also reports a 35-year PPA signed with SPPC. The listed commercial operations date is 30 November 2025, but the page does not confirm that operation was achieved.", "schema_version": "1.0", "public_unknowns": ["The supplied project details do not confirm whether commercial operation was achieved by the listed date.", "The supplied project details do not document a current procurement route, active package, or buying window."], "evidence_observed_at": "2026-10-17T20:08:45.978824+00:00", "knowledge_reviewed_at": "2026-10-17T20:12:23.954004+00:00", "decisive_evidence_observed_at": "2026-10-17T20:08:45.978824+00:00", "export_metadata": {"publisher": "CapexCue", "project_title": "Al Kahfah PV IPP", "original_project_title": "Al Kahfah PV IPP; also described as the Al Kahfah 1425 MW PV project.", "canonical_url": "https://capexcue.com/projects/al-kahfah-pv-ipp-also-described-as-the-al-kahfah-1425-mw-pv-project-306f62dd-75e/", "release": {"id": "cf4b55e0-4bcd-417c-abb8-5826fcc535c2", "number": 1, "published_at": "2026-10-17T20:14:08.761747+00:00"}, "release_reference": "release 1 (cf4b55e0-4bcd-417c-abb8-5826fcc535c2)", "current_dossier_url": "https://capexcue.com/projects/al-kahfah-pv-ipp-also-described-as-the-al-kahfah-1425-mw-pv-project-306f62dd-75e/", "citation": "CapexCue \u2014 Al Kahfah PV IPP \u2014 dossier released 2026-10-17T20:14:08.761747+00:00, release 1 (cf4b55e0-4bcd-417c-abb8-5826fcc535c2) \u2014 https://capexcue.com/projects/al-kahfah-pv-ipp-also-described-as-the-al-kahfah-1425-mw-pv-project-306f62dd-75e/.", "edition_note": "This file records the release identified above; visit the current dossier for later updates.", "presentation": {"version": "dossier-presentation-v7", "project_milestones": [], "project_category": {"basis": "independently_reviewed_metadata", "value": "energy", "support": {"end": 69, "start": 0, "sources": [{"url": "https://www.acwapower.com/en/what-we-do/projects/al-kahfah-pv/", "name": "www.acwapower.com", "origin": "live", "checksum": "9ac7decc26218e13579b68636b8537101b87a78199994a26e45fb656604e8947", "observed_at": "2026-10-17T20:08:45.978824+00:00", "revision_id": "ad699485-ba54-4d27-9191-dffb34af07e7", "published_at": null}], "modality": "reported", "predicate": "name", "raw_value": "Al Kahfah PV IPP; also described as the Al Kahfah 1425 MW PV project.", "statement": "Al Kahfah PV IPP; also described as the Al Kahfah 1425 MW PV project.", "qualifications": {"attribution": "www.acwapower.com"}}, "label": "Energy", "icon": "energy"}, "project_metadata": {"version": "released-metadata-v7", "category": {"basis": "independently_reviewed_metadata", "value": "energy", "support": {"end": 69, "start": 0, "sources": [{"url": "https://www.acwapower.com/en/what-we-do/projects/al-kahfah-pv/", "name": "www.acwapower.com", "origin": "live", "checksum": "9ac7decc26218e13579b68636b8537101b87a78199994a26e45fb656604e8947", "observed_at": "2026-10-17T20:08:45.978824+00:00", "revision_id": "ad699485-ba54-4d27-9191-dffb34af07e7", "published_at": null}], "modality": "reported", "predicate": "name", "raw_value": "Al Kahfah PV IPP; also described as the Al Kahfah 1425 MW PV project.", "statement": "Al Kahfah PV IPP; also described as the Al Kahfah 1425 MW PV project.", "qualifications": {"attribution": "www.acwapower.com"}}}, "input_hash": "6d32d2c2f0fd8513a709a2596f47f8cc018b91a6e56ec175e2b44ef0f15dd6f5", "release_id": "cf4b55e0-4bcd-417c-abb8-5826fcc535c2", "type_codes": ["solar_pv"], "field_states": {"type": {"state": "accepted", "reason": "The described asset is a solar PV project using bifacial panels with single-axis tracking. No other physical project component is identified. Developer and contractor details, the BOO model and PPA do not add asset types; the listed commercial operations date does not confirm achieved operation."}, "region": {"state": "accepted", "reason": "derived_from_accepted_countries"}, "country": {"state": "accepted", "reason": "The physical asset is located at Al Kahfah, Central Region, Saudi Arabia; the supplied country reference maps Saudi Arabia to SA. The other supplied facts do not establish a different asset location."}, "category": {"state": "accepted", "reason": "The asset is described as a 1,425 MW solar PV independent power project and as renewable energy/solar PV power generation. The supplied facts describe no separate physical component in another category. The developer and contractor, BOO model and PPA are project or commercial details, not additional asset components; the listed commercial operations date is not confirmation that operation was achieved."}}, "region_codes": ["middle_east_north_africa"], "release_hash": "e4ca433ae4d9a9e2699321ed3de827983b9c8a52722e21183977db8cf7a4d609", "assessment_id": "875ccec4-8f29-40c5-90bc-a66b42237672", "country_codes": ["SA"], "assessment_hash": "8c955eab677909efdc0dc283db52b39881fbb0dd3f7ada9ce0105898a2358aac", "country_label": "Saudi Arabia", "region_label": "Middle East North Africa", "type_labels": ["Solar PV"]}, "date_note": "Project event times are distinct from source publication, observation and dossier release dates. An elapsed plan does not establish completion."}}}